RareX Investor Presentation
Released
Released
Announcement PDF
Exposure to
Electric Vehicle
Raw Materials
James Durrant
October 2023
RE P
57-71
15
Magnets
Batteries
ASX: REE
rarex.com.au
Disclaimer &
Competent Persons’ Statements
Investor Relations
James Durrant
Chief Executive Officer
P: +61 8 6383 6593
E: info@rarex.com.au
Investor Hub
ree.investorhub.com/welcome
Media Enquiries
Nicholas Read
Read Corporate
P: +61 8 9388 1474
RareX HQ
L1, 338 Barker Rd,
Subiaco WA 6008
E: info@rarex.com.au
This presentation contains summary information about RareX Limited (REE) and is current as
of 3 October 2023 and is authorised for release by the Board. The information in this
presentation is of a general background and does not purport to be complete. This
presentation is not investment or financial product advice (nor tax, accounting or legal advice)
and is not intended to be used for the basis of making an investment decision. The information
contained in this presentation has been prepared without taking into account the objectives,
financial situation or needs of individuals. Investors should obtain their own advice before
making any investment decision. REE has prepared this document based on information
available to it at the time of preparation. No representation or warranty, express or implied, is
made as to the fairness, accuracy or completeness of the information, opinions and
conclusions contained in this presentation. For further information, please contact Chief
Executive Officer, James Durrant.
This presentation contains certain “forward-looking statements”. Forward looking statements
can generally be identified by the use of forward looking words such as, “expect”, “should”,
“could”, “may”, “predict”, “plan”, “will”, “believe”, “forecast”, “estimate”, “target” and other
similar expressions. Indications of, and guidance on, future earnings and financial position and
performance are also forward-looking statements. Forward-looking statements, opinions and
estimates provided in this presentation are based on assumptions and contingencies which
are subject to change without notice, as are statements about market and industry trends,
which are based on interpretations of current market conditions.
Forward-looking statements including projections, guidance on future earnings and estimates
are provided as a general guide only and should not be relied upon as an indication or
guarantee of future performance. This presentation contains statements that are subject to
risk factors associated with REE and the mining exploration industry. It is believed that the
expectations reflected in these statements are reasonable, but they may be affected by a
range of variables which could cause actual results or trends to differ materially. REE
disclaims any intent or obligation to publicly update any forward-looking statements, whether
as a result of new information, future events or results or otherwise.
To the maximum extent permitted by law, REE, their related bodies corporate (as that term is
defined in the Corporations Act 2001 (Cth)) and the officers, directors, employees, advisers
and agents of those entities do not accept any responsibility or liability including, without
limitation, any liability arising from fault or negligence on the part of any person, for any loss
arising from the use of the presentation or its contents or otherwise arising in connection with
it.
Competent Person’s Statement - Geology: The information in this presentation relating to the
Mineral Resource Estimate for the Cummins Range Rare Earths Project is extracted from the
Company’s ASX announcement dated 01 May 2023 which was reported in accordance with Listing
Rule 5.8. REE confirms that it is not aware of any new information or data that materially affects
the information included in the original announcement and that all material assumptions and
technical parameters underpinning the Mineral Resource Estimate continue to apply. The
Company confirms there have been no material changes to exploration results since first reported
in accordance with Listing Rule 5.8.
Competent Person’s Statement – Metallurgy: The information in this presentation relating to
metallurgy was first reported in accordance with Listing Rule 5.7 on 11 July 2023. REE confirms
that it is not aware of any new information or data that materially affects the information included
in the original announcement.
Competent Person’s Statement – Production Target and Forecast Financial Information: The
information in this presentation relating to production targets and forecast financial information
(FFI) was first reported on 22 August 2023. REE confirms that the material assumptions
underpinning the production target and FFI continue to apply and have not materially changed.
The production target is based on a portion of inferred resource. There is a low level of geological
confidence associated with Inferred Mineral Resources and there is no certainty that further
exploration work will result in the determination of Indicated Mineral Resources or that the
production target itself will be realized.
Global Resource (JORC 2012)
2.5% P2O 5
Grade Cut
Tonnes
Mt
TREO
ppm
P2 O 5
%
NdPr
ppm
Nb2O 5
ppm
HREO
ppm
Indicated
66.6
5,010
6.8
1,100
830
290
Inferred
452.7
2,900
4.2
630
550
170
Total
519.3
3,170
4.6
700
580
190
Why Does RareX Exist?
Fundamental Belief In The Electrification Of Things And
The Green Energy Revolution
Global net-zero ambitions
✓ EU Net zero by 2050 – $3.8T by
20501
✓ US net zero by 2050 - $30T by
20502
✓ Australian critical minerals key
to the decarbonization of supply
chain3
Massive EV and wind
turbine investments
The generation, storage and use of
clean energy are key technologies
driving the critical metals boom for
RE magnets and phosphate battery
storage
Electric Vehicles
Wind turbines
✓ 1T surpassed in EV investment by
automotive manufacturers
✓ 1.7T invested in clean energy
generation in 2023
✓ 4T required annually – IEA5
LFP battery investment for EVs and grid firming
Renewable energy generation and electric vehicles have in common the need
for rare earth magnets and battery storage. Lithium Iron Phosphate
✓ Global LFP battery market projected to grow from $10 billion in 2021 to
$50 billion by 20284
RE
57-71
Rare Earths
“RareX focused on
rare earths for
magnet motors and
also found phosphate
for LFP batteries – a
poetic discovery”
15
Sources:
1: https://www.weforum.org/agenda/2022/04/bnefeuropean-energy-transition-2022/
2: https://about.bnef.com/blog/report-shows-thatinflation-reduction-act-alone-wont-set-united-stateson-track-for-netzero/#:~:text=To%20get%20on%20track%20for,rapidl
y%20cut%20down%20on%20emissions.
3: https://www.globalaustralia.gov.au/industries/netzero/critical-minerals
4: https://www.fortunebusinessinsights.com/lithiumion-li-ion-phosphate-batteries-market-102152
5: https://www.canarymedia.com/articles/cleanenergy/chart-clean-energy-investment-to-hit-1-7tw idening-lead-on-fossil-fuels
P
Phosphorus
RareX Value Proposition
1
2
Team able to discover, engineer,
approve, fund and deliver
Cummins Range EV raw material
project
Low-risk, high value development
Stage-1
Stage-2
$45M to monetise the pre-strip
$304M at Y3 for 15 years of Bene
production:
✓ rare-earth for magnets
✓ phosphate for batteries
IRR – 39% pre tax, 27% post tax
NPV– $549M pre tax, $333M post tax
Underpinned by Australia’s largest
undeveloped rare earths project
✓ 24Mt – Contained P 2O5
✓ 1.6Mt – Contained rare earths
3
Exploration upside on and beyond
Cummins Range
Cummins Range “near-mine” anomalies
Kimberley projects
▪ Mt Mansbridge
▪ Maude Creek
East Yilgarn
▪ Weld North
▪ Red Dragon
Action orientated board
Cameron Henry – Process plant construction
Danny Goeman – Marketing, sales & shipping
Jeremy Robinson – Corporate finance
John Young – Mine developer
Shaun Hardcastle – Corporate Lawyer
Core team with Tier 1 exploration,
development and ops experience
Investments in strategic listed
companies
Kay Hofmann – Mining and approvals
Guy Moulang – Geology and Exploration
Lu Zhang – Metallurgy and Process
Damien Krebs, Gavin Beer – Metallurgy
▪
▪
▪
BHP, Rio Tinto, FMG, MinRes, Pilbara Lithium,
Primero, Mets Engineering
Kincora – 5M shares
Cosmos – 10M shares
CREC – 25M shares
Corporate Snapshot
Well Suited For Value Growth
Capital Structure
Shareholders
ASX Code
Share Price (29.09.2023)
Shares on Issue
Market Capitalisation
REE
A$0.033
683M
A$23.2M
Cash (June Qtr)
Investments (June Qtr)
A$4.3M
A$5.3M
Key people
Chairman
CEO
Major Assets
Cummins Range Project
RareXploration tenements
Kincora Copper
Cosmos Exploration Limited
Canada Rare Earths Corp
Various rare earth exploration projects
Top 50 Shareholders
Number of Shareholders
Major Shareholders
~38%
~5,400
Simon Lee AO (5.2%)
Jeremy Robinson (4.3%)
ASX: REE
Share Price Information
0.08
Jeremy Robinson
James Durrant
0.07
0.06
100%
100%
5M shares1
10M shares
25M shares
100%
Note:
1: KCC shareholder approved: RareX will transition its free carry in 5 tenements into 40M new shares. Until then RareX maintains a
35% free carry Trundle, Fairholme, Jemalong, Cundumbul and Condobolin exploration licences in NSW, in addition to 5M shares.
0.05
29 Sep 2023
Prev Close:
0.033
0.04
0.03
0.02
Sep 2022
Mar 2023
Sep 2023
Cummins
Range
Project
Critical Minerals
For The Electric
Revolution
15
P
Phosphorus
57-71
RE
Rare Earths
Flagship Snapshot
Cummins Range
Wyndham
Port
Kununurra
Ord River
Hydro Plant
Mineral
Corridor
535km
Halls Creek
Technical
Financial
A magnet-Rare Earths and batteryphosphate Critical Minerals Project,
beginning with monetised overburden
as Direct Shipping Ore (DSO)
NPV8 post-tax:
IRR post-tax:
Initial Capex:
Stage 2 Capex:
EBITDA:
Stage 1: Monetised DSO pre-strip
Stage 2: P-RE mineral con - Bene
Stage 3: Fresh rock processing
(from 2039)
Scoping Study released for an 18-year
mine life at 500ktpa
Supply chain agreements closing:
▪ Trucking contract and JV
▪ Stockpiling land option
▪ Barge loading tolling
▪ Transhipment
Jaru heritage agreement closing
RareX Project
Cummins Range
Regulatory submissions planned in
early-mid 2024.
AU$ 333M
27%
AU$ 45M
AU$ 304M
AU$ 1,450M
Conservative cost inputs
▪ 20% capital contingency
▪ 5% pa deployed capital sus-cap
▪ Government taxes and royalties
▪ Native title contributions and
royalties
▪ Mine closure $41M
Conservative pricing considering
US $110/kg NdPr oxide
US $250/t 32% P 2O5
Discounted for incentivisation and
value chain position:
REO: 80% basket discount
P2O5: 10% discount
Sources:
ASX Announcement 22 August 2023. The information in this presentation relating to production targets and forecast financial
information (FFI) was first reported on 22 August 2023. REE confirms that the material assumptions underpinning the production
target and FFI continue to apply and have not materially changed. The production target is based on a portion of inferred resource.
There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further
exploration work will result in the determination of Indicated Mineral Resources or that the production target itself will be realised.
2023 JORC Resource
519.3Mt @ 4.6% P2O5, 0.32% TREO
In total: Australia’s largest undeveloped rare earths project
✓ 1.6M tonnes contained TREO
✓ 24M tonnes of contained phosphate
Normalised to 1% TREO:
✓ Australia’s 3 rd largest undeveloped rare earths project
Cummins Range High Grade Resource vs. Peers
BFS
$507M
Tonnes Contained, Mt
70
600
Tonnes, Mt
Market Cap, AUD (29.09.2023)
60
BFS
PFS
400
50
40
500
300
$249M
Exploration
$175M
30
20
BFS
$86M
10
$160M
200
BFS
100
Market Cap, AUD
80
$23M
0
0
Dubbo
0.9% TREO
Nolans Bore
2.6% TREO
Cummins Range
1.0% TREO
Sources:
See slide: List Of Sources For Grade And Resource Graphs
ASX Announcement 01 May 2023
Yin & C3
1.0% TREO
Yangibana
0.9% TREO
Browns Range
0.8% TREO
“An impressive 24Mt of contained
P2O5 and 1.6Mt of contained
TREO”
Developing Cummins Range Into A Critical Minerals Project
Focussing On Overburden Approval To Establish A Near Term Operating Platform
YEAR*
2H 2023
1H 2024
Resource definition
MRE update
Geotech
Pre-strip approvals
Heritage & enviro pre-requisites
Pre-strip readiness
Supply chain contracts
Pre-strip offtake
2H 2024
Referral
Assessment
Funding
Bene approvals
Enviro pre-requisites
Bene readiness
Studies & engineering
Bene offtake
MOUs
*The timetable is indicative and subject to change
✓ License
Road design & build
Term sheets
2026+
Grade control
2nd and 3rd level approvals
Operational contracts
Mine design
2H 2025
Grade definition
Reserve
MOUs
Resource definition
▪ Focus on first 2-5 years on mining
▪ Multi purpose drilling: definition,
Geotech, metallurgy
▪ Aiming for 1-2 years of Measured
1H 2025
Installation & ops
Take or pay
Referral
Commercial contracts
Term sheet
EBITDA
Assessment
Funding
✓ Licence
Construction
Strategic offtake partner
$1,450M
$695M
title contributions
Pre-Strip (Stage-1)Tax, Government and native
Beneficiation
(Stage-2)
Mine closure
▪ Monetised overburden
▪ Mineral concentrate product $41M
▪ Direct shipping ore
rock
phosphate
▪ Magnet rare earths.$549M
Battery/ $333M
NPV
8 (pre / post-tax)
▪ >250ktpa FOB Wyndham
phosphate
IRR (pre / post-tax)
39% / 27%
▪ c. 500ktpa FOB Wyndham
Batteries
Magnets
Single EV Raw
Material Product
Mineral Concentrate
Magnet Rare Earths
Combined mineral concentrate
Wind farms
✓ Single bulk product offering from
Wyndham port, north WA
High NdPr grading monazite
15
57-71
P
RE
Phosphorus
Rare Earths
✓ Low UTh, not affected by leach
process
▪ 200kg NdPr per MW of turbine
▪ 837,000 MW of installed wind
power in 20221
▪ Net-zero requires the 75 GW installed
in 2022 to reach 350 GW in 2030 4
Electric Vehicles
Clean apatite phosphate mineral ▪ 1kg NdPr per vehicle
✓ Low contamination, simple
phosphoric acid leach and
purification to LFP grade
▪ 2.3M EVs sold in 1Q2023 c. 35% YoY
increase3
Battery phosphates
Huge Growth
Pre-strip
Sources
1: https://gwec.net/global-w ind-repo rt-2022/
2: https://www.iea.org/e nerg y-system /electricity/grid-scale- sto rage
3: https://www.iea.org/energy-system/transport/electricvehiclesUnited Nations
4: https://www.iea.org/energy-system/rene wable s/wind
5: https://www.nature.com/articles/s43246-022- 00236- 4
6: https://www.crugroup.com /lf p-growth-may-require-the-globa lpurified-phosphoric-acid-industry-to-double-in-size/
✓ Organic Rock Phosphate
✓ 23% P2O5, 5x bioavailability
✓ c. 1Mt from surface
✓ Organic
✓ 25.5 kg phosphate in each LFP
vehicle5
✓ 35x installed grid-scale battery
storage capacity required between
2022 and 2030 for net zero2
Concentrate supply
▪ 30% of all EV batteries (2022) are
LFP, In 2020 only 6% were LFP!
▪ >90% made in China 6.
Favourable Project Metrics
Total LOM Production Forecasts
40
3.5%
2.9%
31.7
29.5
24
2.1%
20.9
16
8
18.9
0.9%
0.7%
1.4%
0.9%
0.7%
3.3
0
Cummins Range
Nolans Bore
Cummins Range comparable with peers
2.8%
Yangibana
Tonnage, Mt
Dubbo
0.7%
Scoping study modelled 31.7Mt @ 0.7% TREO from Cummins Range1
TREO Grade, %
Total Forecast Production, Mt
32
Note:
1: ASX 22 August 2023: The Scoping Study referred to in this release is based on low-level technical and economic
assessments and is insufficient to support an estimation of Ore Reserves or to provide assurance of an economic
development case at this stage, or to provide certainty that the conclusions of the Scoping Study will be realised. Further
evaluation work and appropriate studies are required before RareX will be in a position to estimate any Ore Reserves or to
provide any assurance of an economic development case
0.0%
Browns Range
Sources:
See slide: List Of Sources For Production Forecasts and Grade, Economics And Radionuclides
TREO Grade, %
Annual TREO Output vs. Development CAPEX
16
1.08B
1.20
0.90
8
0.60
0.42B
0.29B
0.22B
0.30
0
0.00
Cummins R ange
Yangiba na
Nolans Bore
Dubbo
“simpler, faster, staged”
TREO Output, ktpa
CAPEX, USD Billion
Browns Range
CAPEX, USD
TREO Output, ktpa
12
4
Low capital intensity
1.50
1.14B
✓ TREO grades from monazite comparable to peers
✓ Additional benefit of low contaminate phosphate in apatite
✓ 18-year mine life and potentially more to come
Efficiency of capex deployment - AU$ 350M capex for:
▪ 12ktpa of TREO2
▪ Plus 129ktpa of P2O5
▪ Preceded by monetised pre-strip
✓ One of the highest proposed TREO output projects
✓ One of the lowest development capital requirements
✓ High efficiency, lower risk
Note:
2: Cummins Range is projected to deliver a mineral concentrate. Peer group have various value chain positions.
“A lower risk, lower cost project,
for a higher critical mineral output”
Cummins Range ‘Near-Mine”
Resource Expansion
The Potential To Expand The Resource At Cummins Range
For A Larger Or Longer Life Flagship Project
Target anomaly
Background
Multiple historic anomalies on
RareX tenements proximate to
the Cummins Range deposit
Target anomaly
Cummins Range deposit
✓ Historical data review from
sub-optimal auger with aqua
regia assays
✓ Positive 3 rd party review by
Nigel Brand highlighted
significant target potential
✓ Pyroxenite bodies intersected
and localised elevated rare
earths from regional traverses
E80/5092
Target anomaly
E80/5372
Exploration Plan
Utilise existing access and facilities
to efficiently create exploration
targets
▪ Complete Gravity and Magnetic
surveys over tenements and
locate top 5 targets
▪ Review and integrate auger and
regional air core drilling to
confirm depth and assay quality
can explain the surface anomalies
▪ Design and execute infill auger
and RC program over E80/5372
and priority targets in E80/5092
(Q2 2024)
“A desktop study identified 15 anomalies
with coincident REE, Nb, base metals, U/Th”
Growing Kimberley Portfolio For
Future Project Synergies
Curating And Prioritising Tenements For Target Generation
And A Future Hub And Spoke Model Regional Hub
Mt Mansbridge
Heavy rare earths, proximal to Browns
Range
✓ Killy Killy HRE prospect 15km to the
east
✓ Xenotime in quartz veins and breccias
✓ Brown Range look alike (which is 60km
to the NE)
Soils program complete over mag feature
– assays pending
Browns Range
Maude Creek1
HRE Project with Carbonatite
Potential
Mt Mansbridge
✓ Xenotime in Kimberlite occurrence,
no HRE assays
✓ Xenotime confirmed in thin sections
✓ Proximal to deep crustal structures
✓ No drilling on tenement
✓ Untested mag feature on a
lineament - Crosscutting host
stratigraphy
Mt Mansbridge
“Projects with regional and
potentially operational synergies”
Note:
1: Pending formal grant
E80/5430
Maude Creek
Eastern Yilgarn Projects
Under Explored Terrain With Large Areas Of Regolith Hosted
Rare Earths
Weld North
Regolith hosted rare earths
✓ 23 air core drill holes in 2021
✓ All holes mineralised with significant
intercepts of 32m at 1179ppm TREO
and 35m at 1017ppm TREO
✓ Light rare earths with 20% NdPr
Red Dragon
Red Dragon
Regolith hosted rare earths
✓ Located 150km south west of Laverton
✓ Contains highly elevated soils up to
0.4% TREO
✓ Contains several large untested strong
magnetic targets
“Kimberley ‘offseason’ exploration
projects”
Weld North
E80/5430
Relevant Investments In Listed
Companies
Electrification metals exposure across the globe providing investor
upside and funding contingency
Curating good investments
Kincora – Cu-Au
Lead explorer in Macquarie Arc is Australia’s
foremost, world class, copper porphyry district
✓ Board seat
✓ 45 million shares*
✓ 1% NSR on 5 projects
Cosmos (ASX:C1X) – Li-RE-Cu
Emerging lead explorer in the corvette east
district of Ontario Canada, proximate to Patriot
Battery Minerals
✓ Board seat
✓ 10 million shares (c. 18%)
✓ 25% free carry to BFS on Orange East, NSW
project.
CREC – Rare Earth trading
Developing a vertically integrated rare earth
industry by connecting exploration to mining to
refining to customer
✓ No current board seat
✓ 25 million shares
* Note:
KCC shareholder approved: RareX will transition its free carry in 5
✓ Canadian based
tenements into 40M new shares totalling 45M shares post transaction.
Until then RareX maintains a 35% free carry Trundle, Fairholme,
Jemalong, Cundumbul and Condobolin exploration licences in NSW, in
addition to 5M shares.
Team
to Deliver
In The
Right Way
An Evolved Board Of
Company-Building Directors
Danny Goeman
John Young
Ex FMG director of sales and
marketing and advisor to the CEO,
following 20 years with Rio Tinto in
management, sales and marketing,
strategy development and high level
commercial negotiations
Co-founder and executive director of
successful A SX200 lithium producer
Pilbara Minerals Limited (ASX: PLS)
Non-Executive Director
Geology, Development,
Growth
Non-Executive Director
Offtake, Marketing,
Shipping
Jeremy Robinson
Chairman
Fund raising, Strategy,
Corporate Development
As Head of Marketing, then CEO;
responsible for the 2018, 10-year
binding take-or-pay offtake deal for
junior SOP developer Danakali (ASX:
DNK)
Founder of RareX and Managing
Director for 5 years leading the
Company through massive resource
expansion
Holds a Masters in Business
Administration and Postgraduate
Diploma in leadership &
Management from Curtin University
18 years in corporate finance both
in investment firms and in-house
Bachelor of Commerce from the
University of Western Australia
majoring in Corporate Finance,
Investment Finance and Marketing
Cameron Henry
Non-Executive Director
Engineering,
Construction, Operations
Founding managing director of
EPCM engineering firm, Primero
Group Limited
Over 20 years' experience in
development and delivery of global
minerals processing, energy and
NPI projects
Holds a Masters in Project
Management from Curtin University
and is a Member of the Australian
Institute of Company Directors
(MAICD)
L ed the growth of Pilbara from a
ju n ior ASX-listed company to a
globally significant $2 billion lithium
producer in the Pilbara region of
Western Australia
Holds a Bachelor of Geology from
Curtin University and is a director
on a number of ASX listed
companies
Shaun Hardcastle
Non-Executive Director
Corporate Law, Finance
Law, Governance
Partner at Hamilton Locke law firm
covering corporate and finance law,
corporate governance, risk
management and compliance
Involved in a broad range of crossborder and domestic transactions
including joint ventures, corporate
restructuring, project finance,
resources and asset/equity sales
and acquisitions
Bachelor of Law from UWA and
currently a non-executive director of
a number of ASX listed companies
Growing in-house capability
Discovery, development, ops
James Durrant
Chief Executive Officer
Mining and Mechanical
Engineer with nearly 20 years
across Tier 1 operations and
junior company project
development in Africa and
Australia
Guy Moulang
Head of Geology
Greg Wynne
Senior Geologist
Geologist, project manager
and mines rescue qualified
Lu Zhang
Process & Product
Engineer
Geologist and AIG Member
with 20 years experience in
technology metals, base
metals and gold exploration.
5 years with RareX on
Cummins Range
Metallurgist and process
engineer. Ex Mets Group
Kay Hofmann
Rare Earth and Phosphate
metallurgist
Study & Approvals
Manager
Ex Mineral Resources Limited
and BHP. Lead engineering
and operational teams across
mine planning, production,
drill & blast, A&I,
hydrogeology and
environmental baselines
Damien Krebs
Lead Metallurgist
Gavin Beer
Consultant Metallurgist
Rare Earth process designer
and metallurgist
Monetising
in a sustainable manner
ESG Framework
• WEF consistent designed by Top5
advisor
What we’re currently
doing
• Aligned to stakeholders' expectations
✓ TO negotiations towards a Mining
Heritage Agreement
• Mapped out through exploration,
development and into operations
✓ Environmental Baselines +50%
complete
Social Performance
Framework
• Designed to International standards
UN and IFC
• Maximises potential for positive
indigenous relations
• Provides for progressive
development of social performance
for all project stages
✓ Aboriginal impact assessment
defined for execution
✓ Recruitment process to remove
barriers for aboriginals and
minority groups
✓ Employment and Contracting of
local and regional TOs
✓ Jaru Ranger programme being
investigated in conjunction with KLC
“Doing the right things, the right way and
holding ourselves accountable”
Catalysing RareX
Through Cummins Range And RareXploration
2023
2024
2025
Cummins Range
▪
▪
▪
▪
▪
▪
▪
▪
▪
Updated MRE (November)
Supply chain contracts
Mining heritage agreement
Approval submission pre-requisites
Pre-strip product trials and offtake
▪
▪
▪
▪
▪
Feasibility study
Approval submissions
Haul road construction
Mineral concentrate strategic offtake
Completion of crop trials for pre-strip
▪
▪
▪
Cummins Range “near-mine” targets
Field programme Mt Mansbridge HREO
Tenement portfolio growth and
rationalisation
Investment growth and rationalisation
▪
▪
▪
Cummins Range new target drilling
▪
Mt Mansbridge target drilling
Red dragon geophysics, geochemistry and
drilling
▪
Notes
Some milestones dependent upon prior milestones
Grade definition & control drilling
First Ore from pre-strip
FID for Bene plant
Construction readiness
TBD
Board of Directors
Jeremy Robinson – Non-Executive Chairman
John Young – Non-Executive Director
Danny Goeman – Non-Executive Director
Shaun Hardcastle – Non-Executive Director
Cameron Henry – Non-Executive Director
Company Secretary
Oonagh Malone
Chief Executive Officer
James Durrant
RareX HQ
L1, 338 Barker Rd,
Subiaco WA 6008
ABN 65 105 578 756
T: (08) 6383 6593
E: info@rarex.com.au
Follow us
Investor Hub:
LinkedIn:
Twitter:
https://investors.rarex.com.au/welcome
https://www.linkedin.com/company/rarex-limited
https://twitter.com/rarex_asx
rarex.com.au
ASX: REE
Thank
you
Facts,
Figures &
Analysis
Cummins Range
JORC 2012
Mineral Resource
Cummins Range Deposit
Remote But Well Connected
Deposit Location Overview
130km SW of Halls Creek
access via Tanami Road
Deposit at surface
ease of exploration
Jaru Traditional Owners
consulted and supportive
Part of the Great Sandy Desert
on unused pastoral lease
Connected to Wyndham Port
via established mineral corridor
1
1
Port
Wyndham
2
Lake Argyle,
Ord River
Hydro Plant
2
Cummins
Range
Western
Australia
2023 JORC Resource
519.3Mt:
4.6% P2O5; 0.32% TREO
1.6Mt TREO
contained
24Mt P O
2
contained
Highlights
Estimated by industry experts at
CSA Global
✓ Large igneous, low deleterious,
Phosphate deposit discovered
from surface
c. 70Mt of Indicated resource
located within the regolith, top
100m
Sources:
ASX Announcement 01 May 2023
2.5% P 2O5
Grade Cut
Tonnes
Mt
TREO
ppm
P 2O5
%
NdPr
ppm
Nb2O5
ppm
HREO
ppm
Indicated
66.6
5,010
6.8
1,100
830
290
Inferred
452.7
2,900
4.2
630
550
170
Total
519.3
3,170
4.6
700
580
190
5
Basis of Resource
Phosphate CoG used to capture
the extensive Phosphate
mineralisation and low to highgrade rare-earths
Global Resource (JORC 2012)
✓ High grade Rare Earth core still
remains: concentrated around
the Dykes: +50Mt at >1% TREO
✓ Underlying fresh rock resource
with higher-grade Rare Earths
and favourable mineralogy
“This new resource reframes the project
as one of Australia’s most significant rare
earth projects”
Cummins Range Radionucleotides
Radionuclides Comparison
2,373
2,400
U, ppm
2,100
Th, ppm
Radionuclide Level, ppm
1,800
1,500
1,200
900
659
527
600
375
300
254
153
120
25
58
62
30
24
0
Nolans Bore
Mt Weld
Yangibana
Dubbo
Cummins Range
Browns Range
“Cummins Range is one of the
lowest radionuclides containing
Sources:
See slide: List Of Sources For Production Forecasts and Grade, Economics And Radionuclides
deposit”
Detailed
Project
Economics
Cummins Range
Key Inputs And Assumptions
General Parameters and Assumptions
Discount Rate
Owners Costs
Sustaining Capital
Product Price
Product Payability
8%
8% of direct and indirect capital costs for
each stage
2% of deployed capital each operating
year
Pricing as indicated in result tables below
90% for P2O5
20% for REE
State Royalties
7.5% for DSO; 5% for Concentrate
Native Title Royalties
Based on draft Heritage Mining Agreement
Depreciation
Mine Closure
Contingency
Reducing balance method applied over
20yrs
10% of all CAPEX applied after the last
operating period
20% applied to direct and indirect capital
costs
KH, JM: prettify if necessary – make
stylized summary align to this.
Costs
CAPEX
Stage 1 [A$m]
Stage 2 [A$m]
Stage 3 [A$m]
Mine
0.5
17
-
Processing
0.25
164
63
NPI
10
4
-
New road
15
-
-
TSF
-
12
-
Port upgrades
Owners Costs (incl.
EPCM)
Subtotals
9
-
-
3
56
-
37
253
63
Contingency (20%)
7
51
-
Total
45
304
63
OPEX
Stage 1
[A$/t product]
Stage 2a
[A$/t product]
Stage 2b
[A$/t product]
Stage 3
[A$/t product]
Mining
40
18
36
57
Beneficiation
13
115
167
201
Haulage
54
54
54
54
Transhipping
16
16
16
16
Total
123
203
273
328
Low-Case
[A$/t]
Mid-Case
[A$/t]
High-Case
[A$/t]
Stage 1 - DSO Rock Phos
203
254
304
Stage 2a – High Phos-RE Con
Stage 2b – Mid Phos-RE Con
Stage 3 - RE-Phos Con
515
480
404
584
545
468
652
611
532
Product Pricing
Outcomes
Low-Case
[A$/t]
Mid-Case
[A$/t]
High-Case
[A$/t]
Stage 1 - DSO Rock Phos
203
254
304
Stage 2a – High Phos-RE Con
515
584
652
Stage 2b – Mid Phos-RE Con
480
545
611
Stage 3 - RE-Phos Con
404
468
532
Economic Performance
Low-Case
Mid-Case
High-Case
NPV8 (pre-tax), [A$m]
227
549
872
NPV8 (post-tax), [A$m]
101
333
562
IRR (pre-tax), [%]
23%
39%
54%
IRR (post-tax), [%]
Stage 1 Average EBITDA,
[A$m/a]
Stage 2a Average EBITDA,
[A$m/a]
Stage 2b Average EBITDA,
[A$m/a]
Stage 3 Average EBITDA,
[A$m/a]
Average EBITDA LOM,
[A$m/a]
15%
27%
38%
12
23
33
1