POSITIVE SCOPING STUDY FOR CUMMINS RANGE RARE EARTHS PROJECT
Released
Released
Announcement PDF
ASX Release: 12 September 2022
POSITIVE SCOPING STUDY FOR CUMMINS RANGE SHOWS
POTENTIAL FOR SUSTAINABLE, LONG-LIFE RARE EARTHS PROJECT
HIGHLIGHTS
• Strong financials with attractive NPV, IRR and payback period and low cash costs
• Significant production profile of sustainably, Australian produced rare earth and
phosphate products with local placement opportunities
• Scoping Study base only on current 2021 Indicated and Inferred Resources with 85% of
the mine plan in the Indicated category
• Study considers the utilisation of grid-connected hydroelectric power for refinery
operations, a potential world first for rare earth refineries
• Board approves commencement of Pre-Feasibility Study
RareX Limited (RareX, the Company) (ASX: REE) is pleased to report positive outcomes from a Scoping
Study (Scoping Study, the Study) completed on its 100% owned Cummins Range Rare Earths Project
(the Project, Cummins Range), located in the Kimberley region of WA. The Scoping Study was led by
Primero with support from Mining Plus among other leading consultancies.
RareX Managing Director, Jeremy Robinson, said: “This Scoping Study shows that the Cummins Range
Project has the potential to be a world leader in the application of low carbon energy solutions to rare
earths projects. The Project’s maximum resource utilisation and refining capacity powered by green
hydroelectric power, demonstrate RareX’s commitment to reducing its potential carbon footprint. The
Study has been based on the current 2021 Resource and has good potential to grow in scale in the
coming 12 months.”
Cautionary statement
The Scoping Study referred to in this release was completed to determine the viability of a combined mine, beneficiation,
and hydrometallurgical processing plan in the Wyndham East Kimberly region of Western Australia, using rare earth deposits
at Cummins Range to produce rare earth products.
It is a preliminary technical and economic study of the potential viability of the Project.
The Scoping Study referred to in this release is based on low-level technical and economic assessments and is insufficient to
support an estimation of Ore Reserves or to provide assurance of an economic development case at this stage, or to provide
certainty that the conclusions of the Scoping Study will be realised. Further evaluation work and appropriate studies are
required before RareX will be in a position to estimate any ore reserves or to provide any assurance of an economic
development case.
ASX Release: 12 September 2022
This scoping study is an order of magnitude technical and economical assessment and is partially supported by Inferred
Mineral Resources 1.
The Study is based on the material assumptions outlined below. These include assumptions about the availability of funding.
While RareX considers all of the material assumptions to be based on reasonable grounds, there is no certainty that they will
prove to be correct of that the range of outcomes indicated by the Study will be achieved.
To achieve the range of outcomes indicated in the Study, funding of approximately AU$430m will likely be required. Investors
should note that there is no certainty that RareX will be able to raise that amount of funding when needed. It is also possible
that such funding may only be available on terms that may be dilutive or otherwise affect the value of RareX’s existing shares.
It is also possible that RareX could pursue other value realisation strategies such as a sale, partial sale or joint venture of the
Project. If it does, this could materially reduce RareX’s proportionate ownership of the Project.
The Study includes appropriate assessment of realistically assumed modifying factors together with other relevant
operational factors.
The Study is based on indicated resources 85% and inferred resources 15%, which underpin the production target disclosed
in the Study. There is a low level of geological confidence associated with inferred mineral resources and there is no certainty
that further exploration work will result in the determination of indicated mineral resources or that the production target
itself will be realised.
The Study demonstrates a potentially viable project and has given the Board of RareX the confidence
to approve the commencement of a Pre-Feasibility Study (PFS) which will commence in Q3 2022.
This Study is an order of magnitude technical and economical assessment and is partially supported
by Inferred Mineral Resources 2. The Study includes appropriate assessment of realistically assumed
modifying factors together with other relevant operational factors.
The Project concept outlined in the Scoping Study comprises a mine and flotation beneficiation facility
at site producing a rare earth mineral concentrate and a phosphate mineral concentrate which is
trucked along mainly sealed roads to Wyndham Port. At Wyndham Port, a hydroelectric powered rare
earth refinery facility is envisaged which produces a mixed rare earth carbonate (MREC) product for
export with a by-product of merchant grade phosphoric acid. Additional to these products is the
phosphate mineral concentrate which itself contains elevated rare earth grades.
Both phosphate products (phosphoric acid and mineral concentrate) have a market in the fertiliser
sector and there is an opportunity for RareX to participate in the production of fertilisers by reacting
the self-generated phosphoric acid with the mineral concentrate from the mine site, however, this
was outside of the scope of this Study.
Products have been priced according to their grades and market intelligence. MREC pricing is based
on the Cummins Range basket price of US$29.31/kg backed by industry knowledge and information
from international metals market analysis and pricing index companies. Phosphate pricing is based on
market sources. Additionally, a pricing credit is assumed for the phosphate mineral concentrate which
contains appreciable rare earths.
1 ASX Announcement 19 July 2021: RareX delivers major resource upgrade at Cummins Range Rare Earths Project.
2 ASX Announcement 19 July 2021: RareX delivers major resource upgrade at Cummins Range Rare Earths Project.
2
ASX Release: 12 September 2022
Further opportunity exists to produce a combined phosphate and rare earth mineral concentrate at
site - allowing for reduced site infrastructure – with separation and processing at port. This should
result in a substantially larger mining operation.
Key Project Metrics
Financial
Units
Value
Total Capital Expenditure
Discount Rate (pre-tax, nom)
NPV8
AU$ million
%
AU$ million
430
8.0 %
633
IRR (pre-tax, nom)
%
29 %
Payback
Yrs
2.8
LOM EBITDA
AU$ billion
1.9
Products
Units
Volume
MREC Product (dry)
Ktpa
8.9
Phosphate Concentrate Produced (dry)
Ktpa
128.8
Phosphoric Acid Produced
Ktpa
13.5
Capex split
Units
Value
Cummins Range Mine Site and Beneficiation
AU$ million
200
Wyndham Port Refinery Facility
AU$ million
229
Opex
Units
Value
Cash Costs
AU$/kg TREO in MREC
26.6 4
By-Product Credit
AU$/kg TREO in MREC
(20.5) 5
Cash Costs (after credit)
AU$/kg TREO in MREC
6.1 6
Product price
Units
Value
Basket price (ex Sc2O3)
US$/t
29,310
MREC Price (FOB)
US$/t
13,580
Phosphate Price inc. REO Credit (FOB)
US$/t
405
Phosphoric Acid Price (FOB)
US$/t
926
3
Note:
TREO = Total Rare Earth Oxides
MREC = Mixed Rare Earth Carbonate
REO = Rare Earth Oxide
LoM = Life of Mine
3
Beneficiation and Refinery capital costs include non-process infrastructure owner’s costs, indirect costs and a nominal 20%
contingency to direct costs.
4
Total LoM C1 cash cost: AU$1.6b by total TREO produced in the MREC product: 60.6kt
5
Total revenue of phosphate mineral concentrate (inc RE credit) and phosphoric acid: US$832 by total TREO produced in MREC
product: 60.6kt.
6
Cash costs per kg TREO in MREC less by-product credit per kg TREO in MREC.
3
ASX Release: 12 September 2022
Upcoming milestones and key catalysts
The completion of the Scoping Study and the approval to formally initiate the PFS lends the Project to
material near term milestones proposed as follows:
4
ASX Release: 12 September 2022
SCOPING STUDY
1
INTRODUCTION
The Cummins Range Rare Earths Project (Cummins Range, the Project) is a globally significant rare
earths project located in the Kimberley region of Western Australia near the township of Halls Creek.
Halls Creek is well provisioned for infrastructure with power, water and sealed airstrip. It is serviced
by the Great Northern Highway which connects to the modern ports of Wyndham and Darwin.
Currently, Cummins Range is accessible from the Great Northern Highway via the Tanami Road and
the site access track, both currently unsealed. The Tanami Road section is anticipated to be sealed by
the time the Project becomes operational, supported by government initiatives.
Cummins Range was acquired in mid-2019 and, in mid-2020, undertook its maiden drill program
completing 6,143 m of reverse circulation (RC) drilling which was highly successful in proving up the
high-grade core of the deposit. This led to a JORC 2012 Mineral Resource Estimate (cut-off grade 0.5%
TREO) containing 18.8 million tonnes of 1.15% TREO and 9.91% P2O5 with a high neodymium and
praseodymium (NdPr) content of 20% and low thorium-uranium of 159 ppm 7. The primary rare earth
mineral is monazite, the most well understood and processed rare earth mineral in the world. RareX
has subsequently issued an exploration target, potentially doubling the resource 8.
The predominantly monazite hosted rare earth mineralisation at Cummins Range is hosted in the
weathered portion of the underlying carbonatite intrusion with the deposit outcropping in multiple
locations. The underlying carbonatite intrusion contains both carbonatite and pyroxenite units with
common massive phoscorite. Recent exploration activities have identified the intrusion to be a
mineralised dyke, itself in close proximity to a rich phosphate dyke 9, increasing the potential to bring
a stronger phosphate angle into subsequent study phases.
RareX is actively investigating ways in which it can develop the Project in a manner which is carbonneutral or produces minimal carbon emissions. Not only is the facility to be largely powered by already
installed hydroelectricity, but the phosphate by-product will be used in the agricultural sector – much
of it locally – increasing crop yields. Longer term, the facilities layout has the potential to support
electrified vehicle fleets charged from hydroelectricity and the remaining diesel use at site can be
transitioned to full electrification over time given appropriate renewable energy installations.
However, these longer-term goals are not currently priced into the Study and their impact on the
overall Project financial metrics are unknown.
7 ASX Announcement 19 July 2021: RareX delivers major resource upgrade at Cummins Range Rare Earths Project.
8 ASX Announcement 16 February 2022: Maiden exploration target for Cummins Range primary zone.
9 ASX Announcement 09 August 2022: 2022 drilling confirms scale, significance of Cummins Range.
5
ASX Release: 12 September 2022
Figure 1-1: The Cummins Range exploration camp and base in the Kimberley
6
ASX Release: 12 September 2022
2
TABLE OF CONTENTS
RareX Release Positive Scoping Study for Cummins Range ................................................ 1
SCOPING STUDY ............................................................................................................... 5
1
Introduction............................................................................................................... 5
3
Material Assumptions .............................................................................................. 11
4
3.1
Modifying Factors ....................................................................................................... 11
3.2
Timeframe for Development and Production ............................................................... 11
3.3
Availability of Funding ................................................................................................. 11
3.4
Sequencing of Resource Categories.............................................................................. 11
Competent Person’s Statements .............................................................................. 11
4.1
Geology ...................................................................................................................... 11
4.2
Mineral Resources....................................................................................................... 11
4.3
Exploration Target ....................................................................................................... 12
4.4
Metallurgy .................................................................................................................. 12
5
Location and Site Access .......................................................................................... 12
6
Licences and Permitting ........................................................................................... 14
7
Geology and Resources ............................................................................................ 15
8
7.1
Geology ...................................................................................................................... 15
7.2
Mineral Resource Estimate .......................................................................................... 16
7.3
Block Model ................................................................................................................ 17
7.4
Rare Earth Basket ........................................................................................................ 17
7.5
Exploration Target ....................................................................................................... 19
Metallurgy .............................................................................................................. 19
7
ASX Release: 12 September 2022
8.1
Mineralogy ................................................................................................................. 20
8.2
Ore Sorting ................................................................................................................. 21
8.3
Beneficiation ............................................................................................................... 21
8.4
Refining ...................................................................................................................... 22
9
Mining..................................................................................................................... 23
9.1
Orebody Parameters ................................................................................................... 23
9.2
Mining Method ........................................................................................................... 23
9.3
Ore Mining and Recovery ............................................................................................ 24
9.4
Mine Optimisation ...................................................................................................... 24
9.5
Pre Production Mining................................................................................................. 25
9.6
Waste Rock Disposal ................................................................................................... 25
9.7
Production Schedule ................................................................................................... 25
9.8
Mining Equipment ....................................................................................................... 27
10
Processing ............................................................................................................ 27
10.1
Processing Physicals .................................................................................................... 28
10.2
Product Physicals ........................................................................................................ 28
10.3
Beneficiation ............................................................................................................... 29
10.4
Refinery ...................................................................................................................... 31
10.5
Radiation Management ............................................................................................... 35
11
Non-Process Infrastructure ................................................................................... 36
11.1
Cummins Range Mine Site ........................................................................................... 36
11.2
Wyndham Port ............................................................................................................ 36
12
12.1
Products and Markets .......................................................................................... 37
Market ........................................................................................................................ 38
8
ASX Release: 12 September 2022
12.1.1
MREC .......................................................................................................................................... 38
12.1.2
Phosphate................................................................................................................................... 40
12.1.3
Phosphoric Acid .......................................................................................................................... 42
12.2
Pricing......................................................................................................................... 42
12.2.1
MREC .......................................................................................................................................... 43
12.2.2
Phosphate Mineral Concentrate ................................................................................................ 43
12.2.3
Phosphoric Acid .......................................................................................................................... 44
13
Financials ............................................................................................................. 44
13.1
Capex.......................................................................................................................... 44
13.2
Opex ........................................................................................................................... 45
13.2.1
Power ......................................................................................................................................... 45
13.2.2
Manning ..................................................................................................................................... 46
13.2.3
Fuel ............................................................................................................................................. 46
13.2.4
Transport .................................................................................................................................... 46
13.2.5
Maintenance .............................................................................................................................. 46
13.2.6
General and Administration ....................................................................................................... 47
13.3
Funding ....................................................................................................................... 47
13.3.1
Australia ..................................................................................................................................... 47
13.3.2
United States of America ............................................................................................................ 48
13.4
Economic Outcomes .................................................................................................... 49
13.4.1
Financial Metrics ........................................................................................................................ 49
13.4.2
Sensitivity Analysis ..................................................................................................................... 50
14
Environmental Setting .......................................................................................... 51
14.1
Biogeographic Region .................................................................................................. 51
14.2
Climate ....................................................................................................................... 51
14.3
Hydrology and Hydrogeology....................................................................................... 52
14.4
Ecology ....................................................................................................................... 53
14.5
Areas of Conservation Significance .............................................................................. 54
9
ASX Release: 12 September 2022
14.6
15
Environmental Studies ................................................................................................ 55
Social Setting ....................................................................................................... 56
15.1
Native Title ................................................................................................................. 56
15.2
Indigenous Protection Areas ........................................................................................ 56
15.3
Aboriginal Heritage ..................................................................................................... 56
15.4
Pastoral Land Use ........................................................................................................ 57
15.5
Social Studies .............................................................................................................. 58
16
Stakeholder Identification .................................................................................... 59
17
Environmental Approval Strategy ......................................................................... 59
18
Opportiunities and Risks ....................................................................................... 59
18.1
Opportunities.............................................................................................................. 59
18.2
Risks ........................................................................................................................... 60
19
Study Contributors ............................................................................................... 60
20
Timeline ............................................................................................................... 62
Appendix 1 – JORC Table 1 .............................................................................................. 63
JORC Code 2012 – Table 1, Section1 ........................................................................................ 63
JORC Code 2012 – Table 1, Section 2 ....................................................................................... 69
Figure 1-2: RareX exploration team on site at Cummins Range
10
ASX Release: 12 September 2022
3
MATERIAL ASSUMPTIONS
3.1
MODIFYING FACTORS
Refer Sections 5 to 17.
3.2
TIMEFRAME FOR DEVELOPMENT AND PRODUCTION
Refer Section 1.
3.3
AVAILABILITY OF FUNDING
Refer Section 13.3.
3.4
SEQUENCING OF RESOURCE CATEGORIES
Refer Section 9.7.
4
COMPETENT PERSON’S STATEMENTS
The indicated and inferred Mineral Resource Estimates underpinning this Study, including the
production target and forecast financial information, have been prepared by competent persons, as
set out in this Section 4.Competent Person’s Statements.
4.1
GEOLOGY
The information in this announcement that relates to the geological model is based on and fairly
represents information compiled by Mr Guy Moulang, an experienced geologist who is an employee
of RareX Limited. Mr Moulang is a Member of the Australian Institute of Geoscientists and has
sufficient experience relevant to the style of mineralisation and type of deposit under consideration
and to the activity to which he is undertaking to qualify as a Competent Person as defined in the 2012
Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves”. Mr Moulang consents to the inclusion in this announcement of the matters based on this
information in the form and context in which it appears. Prior exploration results were reported in
accordance with Listing Rule 5.7 and the Company confirms there have been no material changes since
the information was first reported. Mr Moulang holds securities in RareX.
4.2
MINERAL RESOURCES
The information in this report that relates to Mineral Resources is based on information compiled by
Richard Maddocks, a Competent Person who is a Fellow of The Australasian Institute of Mining and
Metallurgy. Richard Maddocks is a consultant to Auralia Mining Consulting. Richard Maddocks has
sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the
2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves’. Richard Maddocks consents to the inclusion in the report of the matters based on this
information in the form and context in which it appears. Mr Maddocks does not hold securities in
RareX.
11
ASX Release: 12 September 2022
The Mineral Resource Estimate in this announcement was reported by the Company in accordance
with Listing Rule 5.8 on 19 July 2021. The Company confirms it is not aware of any new information or
data that materially affects the information included in the previous announcement and that all
material assumptions and technical parameters underpinning the estimates in the previous
announcement continue to apply and have not materially changed.
4.3
EXPLORATION TARGET
The information in this announcement that relates to the Exploration Target is based on and fairly
represents information compiled by Mr Guy Moulang, an experienced geologist who is an employee
of RareX Limited. Mr Moulang is a Member of the Australian Institute of Geoscientists and has
sufficient experience relevant to the style of mineralisation and type of deposit under consideration
and to the activity to which he is undertaking to qualify as a Competent Person as defined in the 2012
Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves”. Mr Moulang consents to the inclusion in this announcement of the matters based on this
information in the form and context in which it appears. Mr Moulang holds securities in RareX.
4.4
METALLURGY
The information in this release that relates to metallurgical testwork is based on information compiled
and / or reviewed by Mr Gavin Beer who is a Member of The Australasian Institute of Mining and
Metallurgy and a Chartered Professional. Mr Beer is a consulting metallurgist with sufficient
experience relevant to the activity which he is undertaking to be recognised as competent to compile
and report such information. Mr Beer consents to the inclusion in the report of the matters based on
his information in the form and context in which it appears. Mr Beer does not hold securities in RareX.
5
LOCATION AND SITE ACCESS
The Cummins Range Rare Earth Project is located in the Kimberley region for Western Australia southwest of the town of Halls Creek, as shown below. Access to the Project from Halls Creek is via the
Great Northern Highway and then the Tanami Road to Ruby Plains station. From there, access is along
station tracks. Halls Creek also has a sealed airstrip and connects to the ports of Wyndham and Darwin
via the Great Northern Highway.
On 12 May 2022, the Western Australian Government announced that it has decided to seal the
Tanami Road. The Western Australian State Budget 2022/23 has allocated an additional $100 million,
alongside the recently announced $400 million Federal allocation, to completely seal the Tanami Road
in WA.
The newly sealed Tanami Road will improve safety, accessibility and flood resilience to better support
communities and industries in the north-east of Western Australia. This will help RareX to assure a
steady operation throughout the year in particular during the wet season 10. Main Roads Western
10
Haulage costs included in this study assume the portion of the Tanami Road used by the project is sealed.
12
ASX Release: 12 September 2022
Australia has developed plans to seal the first 20 km section south of Great Northern Highway near
Halls Creek in 2022. Detailed design, ground surveys and approvals are also planned or underway.
Figure 5-1: Map of Project location and key Project infrastructure
13
ASX Release: 12 September 2022
6
LICENCES AND PERMITTING
The Cummins Range Project is an exploration tenement, number E80/5092, which sits upon Jaru
determined native title. A heritage agreement is in place between Jaru and RareX. The mining licence
process is underway with the Jaru prescribed body corporate (PBC).
Figure 6-1: Licence area
14
ASX Release: 12 September 2022
7
GEOLOGY AND RESOURCES
7.1
GEOLOGY
The Cummins Range Resource 11 sits largely within the regolith overlying three sub-parallel carbonatite
dykes that strike at 320 degrees and dip to the south-west at 55 degrees (Figure 7-1). The dykes range
from 50m to over 200m wide and have proximal