Cummins Range Rare Earth and Phosphate Project – Development and
Progress Update
Upcoming catalysts include assays from a further 11,000m of drilling and a
pivotal resource upgrade in Q1 2023
Highlights
• 2022 drilling program complete with 16,000m drilled to support ongoing metallurgical studies and an
upgraded Mineral Resource Estimate expected Q1 2023.
• Metallurgical studies suggest that a combined apatite-monazite float could be achieved with subsequent
separation by magnetics – further simplifying the Project from the Scoping Study.
• Power and land access currently under negotiation at Wyndham Port to support a phased infrastructure
development solution.
• Mining Agreement negotiations underway with the Jaru Native Title Holders.
• Team bolstered with appointment of Damien Krebs to assist with Metallurgy.
• R&D Claim for FY22 being finalised.
RareX Limited (ASX: REE; RareX or the Company) is pleased to provide an update on ongoing development
and stakeholder engagement activities at its 100%-owned Cummins Range Rare Earth and Phosphate
Project, located in the Kimberley region of Western Australia.
The Company’s 2022 drilling program has concluded safely, laying the foundation for a major Mineral
Resource upgrade targeted for Q1 2023.
Metallurgical test work is continuing and showing promising signs to achieve an upsized and simplified
combined flotation product from the mine site by focusing on monazite and apatite together following a clay
removal de-slime step. This has the potential to simplify the Project from the one originally scoped out for the
Pre-Feasibility Study (PFS) with interim product options and the ability to phase in the deployment of key
infrastructure.
For more information,
please contact:
Investors: Jeremy Robinson, Managing Director
Media: Nicholas Read, Read Corporate
P +61 (0) 8 6383 6593
P +61 (0) 8 9388 1474
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Unit 6, 94 Rokeby Road
Subiaco WA 6008
Australia
RareX Limited (ASX:REE)
@rarex_asx
P +61 (0) 8 6383 6593
info@rarex.com.au
rarex.com.au
ASX Release
November 23, 2022
Power and land access negotiations and technical assessments are well underway with Pac Hydro and
Horizon Power, respectively the generator and distributor of the Ord River hydro-electric power. The
negotiation protocol with the Jaru Traditional Owners has been signed and formal negotiations are underway
following the formation of the Jaru Native Title Negotiation Committee and the appointment of lawyers. A
scope of works has been prepared for a community impact assessment which will be integrated with the
heritage agreement in support of the Mining Licence application. Meanwhile, baseline assessments for flora,
fauna, soils, waste, water and heritage are underway and preparation for next year’s surveys have begun.
RareX Managing Director, Jeremy Robinson, said: "We are making material progress with the development
and evolution of the Project on multiple fronts. Cummins Range is advancing rapidly towards the
development phase and 2023 should see numerous key milestones achieved.”
Studies and Project Evolution
The recently completed Scoping Study 1, based on the 2020 Mineral Resource, highlighted a potential
pathway to monetise both the rare earth and phosphate assets at Cummins Range across two infrastructure
locations – Cummins Range and Wyndham Port. The Scoping Study has provided a platform from which to
grow and evolve the Project, with the results of ongoing metallurgical test work a key determining factor in its
overall scope and configuration.
Recent work suggests an opportunity to simplify the Project while also allowing for an increase in scale at the
next study phase. This will be supported by the impending Mineral Resource update, scheduled for Q1 2023.
The 2022 Scoping Study defined a 1.5Mtpa open cut mine at Cummins Range, feeding 500ktpa of Run-ofMine (ROM) material to a beneficiation (bene) plant comprising simple flotation cells. This plant would
produce two concentrate products: a rare earth concentrate and a phosphate concentrate. These
concentrates are proposed to be trucked to Wyndham Port.
Recent metallurgical test work suggests that this can be simplified into a single, mixed flotation concentrate
of rare earths and phosphate.
At Wyndham Port, a refinery powered by the Ord River hydro facility is envisaged which would process the
rare earth concentrate into two further products: a mixed rare earth carbonate (MREC) and phosphoric acid.
With the delivery of a simplified, single interim product from the mine, the coastal infrastructure could be
simplified further, allowing for the staged installation of refining capability, deferring capital and reducing
execution risk.
1
ASX Announcement 12 September 2022: Positive Scoping Study for Cummins Range Rare Earths Project
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Unit 6, 94 Rokeby Road
Subiaco WA 6008
Australia
P +61 (0) 8 6383 6593
info@rarex.com.au
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
ASX Release
November 23, 2022
There is also an opportunity to produce end-product fertilisers by combining the phosphoric acid with the
phosphate rock concentrate, but this has not yet been fully investigated. The Company is working with
ORDCO 2 on opportunities to supply local farms and stations with phosphate products.
The Scoping Study outlined the proposed sale of three products at Wyndham Port: A Mixed Rare Earth
Carbonate (c. 10ktpa), Phosphoric acid (c. 30ktpa) and Phosphate rock concentrate (c. 130ktpa). This product
suite could be simplified as the project evolves and is refined; however the fundamental products of a rare
earth and phosphate combination will remain.
Drilling
2022 has seen approximately 16,000m of diamond and reverse circulation drilling completed at site with a
team of approximately 20 RareX employees and contractors. The rigs have now left the site and are
scheduled to return soon after the wet season. Drilling has been supported by Kal Drilling and Stark Drilling.
Resource and Geology
The updated Mineral Resource Estimate is on track for Q1 2023 and is expected to be consistent with the
previously published Exploration Target. The 2021 resource was calculated on historic and 2020 drilling. The
new resource will include 2021 and 2022 drilling and includes over 20,000m of diamond and RC drilling. The
updated MRE will take into account a much broader regolith region as well as some underlying fresh rock.
Cut-off parameters are being studied and analysis is underway for the possible inclusion of the phosphaterich zone, which may have the potential to be mined as a direct application fertiliser from a direct shipping
operation (DSO), contributing to the phased infrastructure deployment approach.
The Company’s geological understanding of the deposit has also evolved significantly with the completion of
a regolith study authored by Pete Siegfried from CSA Global Consultants. The regolith mineralisation has been
divided into 4 domains that are characteristic of regolith profiles on top of carbonatite pipes. Targeted
metallurgy on each of these domains will now be a focus of the PFS.
Mineralogy and Metallurgy
Mineralogy investigations show values are contained in monazite and apatite which are crystalline minerals
that are well suited to concentration via froth flotation. This is due to mineral morphology and modest
liberation size. The Cummins Range apatite is very low in rare earth and radionuclide content making
metallurgical treatment easier.
In the fresh zone, the rare earths are mainly distributed in monazite and bastnasite and are hosted within
classic carbonatite gangue minerals. The apatite minerals are dominant in the low rare earth material, with
high phosphate minerals present in both regolith and fresh zones.
2
ASX Announcement 07 November 2022: RareX signs MOU for Supply of Phosphate Products Locally
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Unit 6, 94 Rokeby Road
Subiaco WA 6008
Australia
P +61 (0) 8 6383 6593
info@rarex.com.au
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
ASX Release
November 23, 2022
Investigations suggest that, once sufficient liberation is achieved, the apatite and monazite minerals can be
floated as a combined concentrate and magnetically separated, leading to the potential for simple flotation at
site with magnetic separation at the coast. This could lend itself to a phased infrastructure deployment option
at Wyndham Port.
Metallurgical programmes have been ongoing during the year and account for the second largest budgetary
allocation, behind drilling. The programmes have included testing in the regolith and fresh rock zones, with a
recent priority focus on rare earth and phosphate optimised flotation across both the Rare Dyke and the Phos
Dyke.
Recent test work has shown a potentially significant preference for gangue clay minerals into the sub-10micron size fraction, opening up the possibility for pre-float de-sliming to reduce costs in the milling circuit
and the flotation cells as well as improve phosphate and rare-earth concentrate quality.
Hydrometallurgical testwork at ANSTO has shown good alignment to the Scoping Study assumptions and
shows a sulphuric acid bake following a phosphoric acid gangue leach to be the more appropriate extraction
technology. Once the flotation programme has refined the concentrate grade and quality, there is the
potential to further optimise the hydrometallurgy circuits and reduce reagent consumptions.
The 2022 metallurgical program is now complete with sample selection from four sub-lithologies, which will
aim to confirm current metallurgy performance as well as allowing optimisation of the process flowsheets.
Auralia Metallurgy, Nagrom and ANSTO have been supporting RareX in the metallurgical testing. RareX is also
sending ore samples to the highly experienced Chinese research institute; Baotou Meng Rong Fine Materials
Co Ltd (BTMR). The BTMR is one of the world’s leading flotation R&D laboratories for rare earth elements. By
adopting this multi-dimensional approach, RareX hopes to rapidly work toward the establishment of the
optimal flotation regime for the regolith and fresh ores.
Power and Land
The opportunity to utilise hydro-electric power at Wyndham is being developed towards formalisation. RareX
has been working with Pac Hydro and Horizon Power to understand the current supply limitations, the lowhanging debottlenecking solutions, and the impacts of RareX infrastructure onto the feeder lines at
Wyndham.
The Company intends to map a formalised pathway to a power purchase agreement in the near future. RareX
is working with PWC as its legal adviser in this regard.
Off-take
Michael Prassas recently joined the team as Head of Corporate Development and has spent considerable time
in Europe linking with his connections in the automotive sector, which is a key target market for both the
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Unit 6, 94 Rokeby Road
Subiaco WA 6008
Australia
P +61 (0) 8 6383 6593
info@rarex.com.au
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
ASX Release
November 23, 2022
magnet metals, NdPr, as well as the phosphate material for use in Lithium-Ion Phosphate batteries such as
those used in the new generation of electric vehicles due to improved safety and longevity.
RareX also recently executed an MOU for fertilizer product off-take, distribution and R&D for the purpose of
placing a portion of the Cummins Range products locally for the benefit of the Kununurra agricultural sector.
This strategy is particularly pertinent given the price shocks currently reverberating through the phosphate
fertilizer industry as a result of the conflict in the Ukraine and the remoteness of Kununurra, which relies
solely on imported material, either from overseas or from the East coast of Australia. RareX is looking forward
to developing a product road map with ORDCO.
Approvals
RareX expects that it will be required to submit full referrals under State and Commonwealth Acts for the
Cummins Range Project and will be conducing baseline surveys accordingly. Because the Project has two
infrastructure locations, this is likely to be addressed under separate referrals.
Dry season flora and fauna surveys at site are complete and will be augmented with the wet season surveys
early next year. Pre-field trip heritage work has commenced and soil and landform surveys and waste rock
characterisation will be initiated in the near future. Recent baseline hydrogeological studies will be
augmented with a broader programme in 2023. The Company is working with the Jaru Native Title Holders to
further integrate local members into the survey, monitoring and management teams. The Company is
planning to make formal submissions at the completion of the PFS. RareX is working with MBS Environmental
as its lead consultant for the environmental approvals.
Stakeholder engagement
RareX has been undertaking the groundwork required for its social impact assessment which includes a more
focused Community Impact Assessment which will be included as part of the negotiations currently
underway with the Jaru Native Title Holders for the Mining Heritage Agreement. RareX recently implemented
a dedicated stakeholder database and management system. WSP Golders are the lead consultant in
stakeholder engagement.
Native Title
The Mining Licence negotiations have commenced following the signing of the negotiation protocol with the
Jaru Native Title Holders and the nomination of the Traditional Owners’ Negotiation Committee (TONC).
The first of the heritage agreement negotiations commenced on 22 November in Halls Creek. RareX is
working with Allens as its legal representative.
GOVERNMENT SUPPORT
RareX also notes the recent announcement of the Critical Minerals Development Plan (“CMDP”), which is
designed to provide support for companies and projects moving through the feasibility pathway.
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Unit 6, 94 Rokeby Road
Subiaco WA 6008
Australia
P +61 (0) 8 6383 6593
info@rarex.com.au
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
ASX Release
November 23, 2022
RareX is preparing for an application when the plan is expected to open in the New Year. In addition, RareX is
currently finalising its Research and Development “R&D” claim for the FY22 year, which is expected to
provide a significant cash injection to the Company.
Pre-Feasibility Study
The Pre-Feasibility Study (PFS) is underway in some key areas of the project with process design pending the
next round of metallurgical studies.
Team Update
RareX has recently signed up to a long-term consulting arrangement with Damien Krebs, Principal Process
Consultant for Primero. Damien is one of the foremost experts in rare earth processing and bolsters the team,
which already includes Gavin Beer, another pre-eminent rare earth metallurgy and processing specialist.
Additional to this external consulting support, RareX recently hired Lu Zhang as Process Engineer. Lu,
formally of METS Engineering Group, has been an embedded consultant to the team for 12 months and brings
a great deal of processing capability to the team. Additionally, Lu is a Mandarin speaker and has been
supporting RareX in its engagement with the broader rare earth and phosphate industry.
Next Steps
The key upcoming key milestones mean a busy start to the year ahead for RareX:
1.
2.
3.
4.
Update Mineral Resource Estimate.
Completion of the Heritage Agreement.
Negotiation of Power Purchase Agreement.
Ongoing metallurgical testwork results
This announcement has been authorised for release by the Board of RareX Limited.
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Unit 6, 94 Rokeby Road
Subiaco WA 6008
Australia
P +61 (0) 8 6383 6593
info@rarex.com.au
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
ASX Release
November 23, 2022
About RareX Limited – ASX: REE
RareX Limited (ASX: REE) is a Perth-based rare earths company committed to becoming a near-term
producer of neodymium and praseodymium (NdPr). RareX’s focus is on developing rare earths deposits in
Australia, including the flag-ship Cummins Range Rare Earths – Phosphate Project.
NdPr is a core enabler of decarbonisation of our society and enables low carbon technologies, especially in
the electric mobility sector, robotics solutions and renewable energy, e.g. the wind energy sector. NdPr is the
key raw material for manufacturing rare earth powered permanent magnet NdFeB electric motors, the heart
of the next industrial revolution the Electrification of our Society.
RareX’s focus is on developing rare earths deposits in Australia, including the Cummins Range Rare Earths
Phosphate Project in the East Kimberley region of Western Australia. RareX is committed to developing a
sustainable, ethical, transparent and secure low carbon rare earth supply chain solution for the global electric
mobility market and NdFeB permanent motor downstream ecosystem.
For further information on the Company and its projects visit www.rarex.com.au
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Unit 6, 94 Rokeby Road
Subiaco WA 6008
Australia
P +61 (0) 8 6383 6593
info@rarex.com.au
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
Share your feedback
Discover