September 2023 Quarterly Report
Highlights
Cummins Range Rare Earths & Phosphate Project
• Enhanced Scoping Study on the Cummins Range Rare Earths & Phosphate Project outlined a fundable, lowCAPEX staged rare earths and phosphate critical minerals project.
• The Scoping Study outlined attractive and robust project economics across a range of pricing scenarios, with
the ability to monetise the phosphate-rich overburden as a DSO fertiliser, before moving into the delivery of
phosphate and rare earths concentrates for both EV magnet and LFP (lithium-ferro-phosphate) battery
applications over an 18-year mine life, establishing a nationally significant long-life critical minerals project.
• Product strategy confirmed as a dual mineral concentrate
• Primary Phos-RE mineral concentrate product from Cummins Range showed strong potential to produce highpurity phosphoric acid suitable for LFP battery application.
• Rare earths beneficiation testwork delivered up to 20x TREO upgrade to concentrate, with favourable flotation
characteristics.
• 2023 diamond and RC drilling campaign completed to support ongoing feasibility studies and resource
development studies, with 4,449m of drilling completed safely and under budget.
RareXploration
• RareX Geology Team now focused on prospective ground surrounding Cummins Range as part of the
Company’s regional “RareXploration” initiative.
• Detailed magnetics and high-resolution gravity surveys commenced targeting the discovery of additional
mineralised carbonatite pipes, to further expand RareX’s critical metals inventory at Cummins Range.
• RareX agreed to sell its 35% interest in its former NSW copper-gold portfolio to its JV partner, Kincora Copper
Limited, becoming Kincora’s largest shareholder with an 18% interest.
• Cash and listed investments of $6.997 million at Quarter-end.
RareX Limited (ASX: REE) (RareX or the Company), is pleased to provide its activities and cash flow reports for
the quarter ended 30 September 2023.
Management Comment
Commenting on the Quarter, RareX’s CEO, James Durrant, said: “Notwithstanding a very challenging macroeconomic and geopolitical environment, the September Quarter was a breakthrough period for RareX in terms of our
development strategy, product suite and market positioning for the Cummins Range Project.
“The delivery of an enhanced Scoping Study in late August was a major milestone for the Company, and marked the
culmination of many months of hard work by the RareX team, supported by our consultants. The Scoping Study
results exceeded our expectations and validated the evolved project development pathway we first presented for the
project back in April 2023.
For more information,
please contact:
Investors: James Durrant, CEO
Media: Nicholas Read, Read Corporate
Engage and Contribute: Investor Hub
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Level 1, 338 Barker Road
Subiaco WA 6008
Australia
P +61 (0) 8 6383 6593
P +61 (0) 8 9388 1474
W ree.investorhub.com/welcome
P +61 (0) 8 6383 6593
E info@rarex.com.au
ree.investorhub.com/welcome
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
“The results show a practical approach to allow the economic extraction of valuable rare earths and phosphate
battery feedstock via a staged development that incorporates a strategy to monetise the phosphate-rich overburden
material as a DSO fertiliser product. Sale of the phosphate dominant / low rare earth overburden would reduce
stripping costs during the early stages of the project development, while de-risking the development of the longerterm full-scale critical minerals project focused on the delivery of rare earths and phosphate concentrates for EV
magnets and LFP batteries.
“Building on this pivotal Scoping Study, we were able to progress multiple workstreams during the quarter that
helped us to further refine our product marketing strategy, supported by positive results from metallurgical testwork
programs. Our proposed product suite has high value-in-use potential and we’re now working to find the right buyers
across Australia and SE Asia, having recently appointed two off-take consultants.
“Importantly, our main product from Cummins Range is a unique dual-mineral concentrate that contains both LFPsuitable phosphate and EV magnet-suitable rare earths. The phosphate within apatite and the rare earths within
monazite means we can maximise the extraction of both of these highly strategic elements. We believe this is a
unique product offering, with the opportunity to supply 12ktpa of rare earth oxides and 169ktpa of battery-grade
phosphate to an automotive manufacturer for at least 15 years, as outlined in the Scoping Study. With 25kg of P2O5
and 1kg of NdPr oxide required for each LFP-powered electric vehicle, Cummins Range has the potential to supply
over 2.5 million EVs every year over its initial 15–year mine life.
“We also made significant progress on a number of other fronts during the quarter, with the safe and efficient
completion of our 2023 diamond and RC drilling campaign, with the results to support ongoing feasibility work and
resource definition studies, including geotechnical and mine design work. With drilling of the main Cummins Range
deposit now completed, the RareX Exploration Team has been able to turn its attention further afield as part our new
‘RareXploration’ initiative. This is aimed at making new discoveries in the near-mine environment that could
significantly enhance our value proposition. This work is already underway with the completion of a major magnetic
and high-resolution gravity survey.
“On the corporate front, we restructured our copper-gold exploration JV with Kincora Copper in NSW through a
transaction which saw us divest our 35% interest in the JV in exchange for shares in Kincora, which is now a
dedicated NSW copper-gold explorer. We retain significant exposure to future upside here via our 18% stake in
Kincora, making us their largest shareholder.
“In summary, the significant activities and achievements of the September Quarter have put RareX in a great position
to unlock the enormous long-term value inherent in the Cummins Range asset. The low upfront capital makes this
fundable and deliverable by RareX, and we’ve materially progressed the pre-requisites for regulatory approval, giving
us the best chance of becoming an operator in the next couple of years. With all these positive attributes and the
ability to deliver this project with our team, we are excited for the future of the Company. Our priorities for the next 69 months are to identify strategic off-take partners, progress feasibility studies, and complete submissions for
mining approvals.”
CUMMINS RANGE RARE-EARTHS-PHOSPHATE PROJECT
Enhanced Scoping Study
During the Quarter, RareX completed an enhanced Scoping Study (Scoping Study, the Study) which delivered
positive outcomes from a 3-Stage, project development strategy for the Cummins Range Project (the Project,
Cummins Range), located in the Kimberley region of Western Australia.
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Level 1, 338 Barker Road
Subiaco WA 6008
Australia
P +61 (0) 8 6383 6593
E info@rarex.com.au
ree.investorhub.com/welcome
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
The enhanced Scoping Study builds upon learnings and recommendations from the September 2022 Scoping
Study 1, metallurgical testwork and the 2023 updated Mineral Resource Estimate 2 which positioned Cummins
Range as Australia’s largest undeveloped rare earths project. The Study’s main contributors were Primero, Mining
Plus, Ausenco, Shawmac and MBS Environmental. The Project outlined in the Scoping Study is based on the
Mineral Resource Estimate (MRE) published to the ASX on 1 May 2023 and comprises three stages:
•
Stage 1 (pre-strip monetisation): Low CAPEX (A$45M), direct shipping ore (DSO), direct application (DA),
high-bioavailability, organic rock phosphate fertiliser for agricultural purposes. A production rate of up to
300 ktpa of 23% P2O5 is forecast for a period of 3 years.
•
Stage 2 (beneficiation): Installation of a mid-sized beneficiation plant of A$304M to produce 550 ktpa
phosphate-rare earth mineral concentrate from the weathered resource for the phosphoric acid and rareearth concentrate market.
•
Stage 3: A$63M upgrade of the Stage 2 plant in year 13 to produce a concentrate from the un-weathered,
fresh, rock below c.130 m RL. Stage 3 should see further improvement and optionality in post
beneficiation upgrades due to mineralogy factors. A mine closure cost of A$41M has been allocated at
the end of Stage 3.
Figure 1: Breakdown of the staged approach and high-level capital, operating expense and unit cost metric. Outcomes are derived from the MidCase pricing assumptions (refer to section 5.5 for further discussion of the Low-Case, Mid-Case and High-Case pricing assumptions). The above
timetable in indicative only and is subject to change. All currency in A$.
1
2
ASX Announcement 12 September 2022: Positive Scoping Study for Cummins Range Rare Earths Project
ASX Announcement 1 May 2023: Cummins Range Resource Soars to 519Mt 0.32% TREO, 4.6% P2O5
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Level 1, 338 Barker Road
Subiaco WA 6008
Australia
P +61 (0) 8 6383 6593
E info@rarex.com.au
ree.investorhub.com/welcome
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
The project concept outlined in the Scoping Study comprises a Stage 1 (monetised pre-strip) direct shipping ore
(DSO) open pit mine and basic site infrastructure, including a crushing-screening plant and a road linking the
mine site to the Tanami Road, 40km north of Billiluna.
This will be followed by Stage 2, which comprises the installation of a flotation beneficiation facility at site to
produce a rare earth and phosphate mineral concentrate, and the expansion of non-process infrastructure (NPI).
This staged development approach has the benefits of initiating early cashflows, building confidence with the
regulators on environmental management, furthering community relationships and social performance, providing
greater mineral resource definition, allowing bulk samples for metallurgy and piloting, and establishing a
functioning supply chain; all of which substantially de-risk Stage 2 which transitions the project into a rare-earth
critical mineral mine.
All project stage products are proposed to be trucked along mostly sealed roads to Wyndham Port, with the
Tanami Road currently undergoing sealing. At Wyndham Port, which is powered by hydro electricity from the Ord
River hydro power station, the Company proposes to install a simple covered stockpile storage area 3 and to
collaborate on using existing infrastructure and incumbent operators, including the current KMG iron ore loading
jetty 4 (or the Agrimin loading facility 5 which is yet to be built), and transhipping operators familiar with the port 6.
The DSO rock phosphate has high value-in-use in the fertiliser sector due to its organic and high bioavailability
nature. An average grade of 23% P2O5 with up to 5 times the bioavailability of traditional rock phosphate denotes
that more phosphorous is available to the plants for a given P2O5 head grade. Additionally, there is an opportunity
for RareX to support the local communities by providing meaningful employment and also support the local
agricultural sector by placing product to customers for use in the Ord River Irrigated Area (ORIA) and the broader
cropping region largely supplied through OrdCo 7.
Stage 1 has not been assessed as a standalone project. Pit optimisation has been completed on the staged
approach. Stage 1 (stand-alone) pit optimisation will be completed at the next study stage. More importantly,
Stage 1 is a very useful, low-cost, de-risking step - allowing RareX to fund and establish an operational footprint
whilst Stage 2 is refined for optimal delivery.
The Stage 2 mineral concentrate is proposed to be pre-treated at an offshore phosphoric acid plant facility, likely
in Asia, to leach the clean apatite (phosphate) mineral and liberate the monazite (rare earth) mineral, maximising
value-in-use to both the acid producers and the downstream monazite rare earth refineries. Rare earths will then
be refined by a third party used in the technology and clean energy sector where the product’s dominant rare
earth oxide, NdPr, is used in magnets in electric vehicles and wind turbines.
Phosphate product component price ranges have been estimated and benchmarked based on their grades,
bioavailability and market intelligence and forecasts, including from independent consultants and market reports
from Argus. Additionally, a discount has been applied for the mineral concentrate entering the phosphoric acid
market. Current Argus reporting has 32% P2O5 Moroccan free-on-board (FOB) at US$258 per tonne 8, which is
equivalent to A$361 per tonne at a foreign exchange (FX) of 1.4.
Land tender process underway.
Term sheet under negotiation for KMG to provide stockpile reclaim and barge loading services to RareX.
5
ASX Announcement 13 April 2013: Cummins Range Rare Earths-Phosphate Project - Development and Strategy Update.
6
Term sheet under negotiation with incumbent transhipping service provider.
7
ASX Announcement 7 November 2022: RareX signs MOU for Supply of Phosphate Products Locally.
8
Argus monthly phosphorous outlook, July 2023 Average.
3
4
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Level 1, 338 Barker Road
Subiaco WA 6008
Australia
P +61 (0) 8 6383 6593
E info@rarex.com.au
ree.investorhub.com/welcome
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
Rare earth product component pricing considers a discounted Cummins Range total rare earth oxides (TREO)
basket price (to take into consideration further processing requirements). The basket price is dominated by NdPr
value. Adamas Intelligence 9 forecasts that due to demand from the electric vehicle and wind power sectors, the
value of NdPr oxide consumed will increase eleven-fold by 2035. Prices are forecast to rise from current levels of
US$70,000 per tonne to US$100,000 per tonne by 2025, increasing steadily to over US$200,000 per tonne by
2035.
Given the low up-front capital, the low-risk development approach, and the strategic nature of Cummins Range as
a critical minerals rare earth project, a Kimberley-located operation, and a potential future employer of Aboriginal
people from the disadvantaged communities of Halls Creek and Billiluna, funding is proposed through a
combination of grant, debt, and equity.
The 50km road linking the Project to the Tanami Road has been costed in the project economics, but has the
potential to be funded by way of a government sourced grant in a manner similar to the Seafarms road
(A$18M 10), and the Northern Minerals road (A$50M 11) - funded from state and federal budgets respectively.
Northern Australia infrastructure Facility (NAIF) is anticipated to provide a substantial portion of project debt.
At present, the Company has no pending applications in respect of the above funding initiatives. In the event that
the above funding initiatives are not successful, the Company has a reasonable basis for expecting that it can
secure funding solely through a combination of debt and equity.
The Scoping Study has been developed from a Mineral Resource Estimate which covers approximately 40% of
the Cummins Range carbonatite pipe. The remaining 60% of the carbonatite pipe has had less than 600m of
drilling, all with phosphate and rare earths mineralisation (see announcement dated 1 May 2023) 12.
https://www.miningreview.com/energy/pensana-looks-to-achieve-first-production-at-longonjo-in-2025/.
https://seafarms.com.au/wp-content/uploads/2021/08/2236045.pdf.
11
https://investorinsight.com.au/browns-range-access-upgrade-to-follow-commitment-from-wa-govt-in-state-budget-northern-minerals/.
9
10
12 ASX Announcement 1 May 2023: Cummins Range Resource soars to 519Mt 0.32% TREO, 4.6% P O .
2 5
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Level 1, 338 Barker Road
Subiaco WA 6008
Australia
P +61 (0) 8 6383 6593
E info@rarex.com.au
ree.investorhub.com/welcome
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
Key Project Metrics
The nominal case presented in the table below, with low initial capital and a simple development plan using 3rd
party operators along the supply chain, before transitioning to Stage 2, and ultimately Stage 3, is the preferred
approach to developing this Project, balancing economic returns with risk and funding potential.
Key project metrics
Physicals
Product type
Av. prod. rate (dry) (ktpa)
Average grade (%)
Duration (yr)
Costs
CAPEX (A$M)
OPEX (A$M/a)
OPEX (A$/t product)
Total SUSCAP (A$M/a)
Closure (A$M)
Products
Average TREO production (ktpa)
Average P2O5 production (ktpa)
Product price (A$/t)
Financial outcomes
Payback (pre-tax) (yr)
Average EBITDA LOM (A$M/a)
Total EBITDA (A$M)
Government tax (30%) (A$M)
Government royalty (A$M)
Native title contributions (A$M)
NPV8 (pre-tax / post-tax) (A$M)
IRR (pre-tax / post-tax) (%)
Notes:
•
•
Stage 1
DSO
270
23% P2O5
3
Stage 2
Phos-RE Con
503
33% P2O5; 2.3% TREO
10
Stage 3
Phos-RE Con
480
32% P2O5; 1.6% TREO
5
45
35
122
1
-
304
139
259
7
-
63
171
328
8
41
63
254
12
169
553
7
156
468
1.65
1.41
81
1,450
406
205
84
549 / 333
39% / 27%
1.69
Government royalties: 7.5% DSO, 5% Con
Native title (NT) contributions per currently negotiated outcomes - note the agreement has not been executed
The production target disclosed in the Study is underpinned by ore feed classifications of 73% Indicated
Resources and 27% Inferred. There is a low level of geological confidence associated with Inferred Mineral
Resources and there is no certainty that further exploration work will result in the determination of Indicated
Mineral Resources or that the production target itself will be realised.
The estimated Mineral Resources underpinning the production target have been prepared by a competent person
or persons in accordance with the requirements in Appendix 5A (JORC Code) as presented to the ASX release on
1 May 2023 “Cummins Range Resource soars to 519 Mt 0.32% TREO, 4.6% P2O5”. The Company confirms that it
is not aware of any new information or data that materially affects the information included in that
announcement and that all material assumptions and technical parameters underpinning the estimates in that
announcement continue to apply and have not materially changed.
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Level 1, 338 Barker Road
Subiaco WA 6008
Australia
P +61 (0) 8 6383 6593
E info@rarex.com.au
ree.investorhub.com/welcome
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
The material assumptions underpinning these project metrics are:
•
The Mineral Resource Estimate released to the ASX on 1 May 2023 13.
•
A Scoping Study compiled by RareX with supporting consultants including Primero, Mining Plus, Ausenco
and MBS Environmental with a typical confidence level of +/-40%.
•
Mining costs and basic schedule based on typical mining methods and assumed geotechnical
parameters.
•
Metallurgical performance based on laboratory test work released to the ASX on 12 September 2022 14, 4
October 2022 15, 11 October 2022 16, 23 March 2023 17, 8 June 2023 18 and 11 July 2023 19 . The Company
confirms that it is not aware of any new information or data that materially affects the announcement.
•
Environmental factors determined from desktop studies and field surveys.
•
Materially advanced mining heritage agreement with Jaru traditional owners.
•
Market confidence derived from memorandum of understanding (MOU) with Ordco, (see ASX
announcement dated 7 November 2022) and market knowledge and intelligence from Argus and
independent consultants (as referenced throughout this study).
Excluded material assumptions are:
• No site visit by mining consultant
Note: No Ore Reserves were estimated as part of the Scoping Study.
Rare Earths Beneficiation Testwork
Recent beneficiation testwork has returned promising results for the beneficiation of rare earths (RE) from the
Cummins Range Project.
RareX has initiated a beneficiation program at Baotou Mengrong Fine Materials (BTMR) in China to test RE
beneficiation from both whole ore and the leach residue from the phosphoric acid production. BTMR is a highly
experienced Chinese research institute and is a preeminent testing laboratory for rare earths beneficiation,
particularly flotation.
This testwork is being undertaken on samples, which is expected to be typical of run-of-mine material from the
Cummins Range deposit, in order to provide the required volume of material needed to test alternative float
regimes. The composite tested in this program was prepared using ore intervals from both the Rare Dyke and
Phos Dyke of the Cummins Range deposit, which were crushed and homogenised by Auralia Metallurgy before
splitting the 50kg sample for BTMR tests.
ASX Announcement 1 May 2023: Cummins Range Resource soars to 519Mt 0.32% TREO, 4.6% P2O5
ASX Announcement 12 September 2022: Positive Scoping Study for Cummins Range Rare Earths Project
15
ASX Announcement 4 October 2022: Met Testwork Delivers Premium Phosphate Concentrate
16
ASX Announcement 11 October 2022: Positive Ore Sorting Testwork Results for Cummins Range
17
ASX Announcement 23 March 2023: Phosphate Testwork Confirms Potential to Produce Fertiliser
18
ASX Announcement 8 June 2023: Bioavailability Tests Confirm Potential of Cummins Range
19
ASX Announcement 11 July 2023: Phosphoric Acid Leach Test Supports RareX Stage-3 Operations
13
14
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Level 1, 338 Barker Road
Subiaco WA 6008
Australia
P +61 (0) 8 6383 6593
E info@rarex.com.au
ree.investorhub.com/welcome
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
A range of tests have been performed on this sample to determine the flotation configuration and reagent
selection for the beneficiation of RE minerals. A summary of several of the recent flotation results is shown in
Table 1.
Table 1: RE Flotation Results Summary
Final Con
Test No.
Calculated
Head, %
TREO Grade, %
TREO Recovery, %
Mass Yield, %
Test 23
1.14
22.04
32.81
1.69
Test 25
1.06
21.57
44.73
2.19
Test 43
1.01
22.50
48.74
2.20
Note: Test results were validated at the Analysis Centre of Baotou Institute of Rare Earth which is an accredited laboratory in China
and the results showed good alignments for the final concentrate confirming accuracy of the results.
In the best result, a RE concentrate of 22.5% TREO grade was achieved from a feed grade of 1% at a remarkable
recovery of 48.74%. To be able to achieve an upgrade of over 20x into concentrate from the ROM feed is
considered to be very encouraging. These results are far better than results obtained in earlier testwork and the
upgrade factor is also in line with other developing rare earth deposits of similar head grades.
Although the tests were not performed on the leach residue, the results provide further confidence in the viability
of the proposed RE beneficiation process for the leach residue. Further tests will be undertaken with BTMR once
the leach residue, currently being prepared at Perth laboratories, is ready to be dispatched.
According to previous testwork results2, it is believed that the leach residue (i.e., post apatite leach) will be
enriched with monazite and therefore will contain residual apatite. REE metallurgists consider that it’s possible
that this could provide further upside to the RE beneficiation process. Given the positive BTMR results, it is
believed that the leach residue (which is expected to grade 6% TREO), could be upgraded materially to grades
suitable for a typical RE refinery.
Phosphate Bulk Flotation Testwork
Following the positive 2022 sighter testwork results 20, a bulk flotation program was carried out to assess if
similar, or better, flotation performance can be achieved at larger scale with the same simple flotation circuit. The
bulk flotation using larger float cells is a good intermittent step to simulate pilot testing and to assess if similar
flotation kinetics can be achieved.
The test was performed on the same regolith composite that were tested in the sighter program and was
undertaken at Auralia Metallurgy in Perth. A summary of the flotation testwork results with comparison to the
sighter float results are shown in Table 2.
20 ASX announcement 04 October 2022: Met Testwork Delivers Premium Phosphate Concentrate
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Level 1, 338 Barker Road
Subiaco WA 6008
Australia
P +61 (0) 8 6383 6593
E info@rarex.com.au
ree.investorhub.com/welcome
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
Table 2: Flotation Results Summary
Bulk Float
P2O5
Product
Grade
Recover
%
y%
Rougher Concentrate
22.6
96.3
Cleaner Concentrate
34.4
91.1
FINAL
Head Grade
12.9
100
TREO
Grade
%
0.51
Recover
y%
81.7
Sighter Float1
P2O5
Grade
Recover
%
y%
23.8
94.3
0.72
70.7
34.1
85.7
0.70
63.9
0.33
100
12.9
100
0.33
100
TREO
Grade
%
0.55
Recover
y%
79.1
As shown, excellent results were achieved from the bulk flotation test producing a phosphate concentrate of
34.4% aligning to the sighter float performance. The bulk float P2O5 recovery of 91.1% was also encouraging and
was better that the sighter program.
The flotation tests were not focused on concentrating rare earths and the TREO head grade is relatively low for
this composite, however, the recovery trend of the rare earth showed high similarities, albeit slight lower
recoveries, to the phosphate (as shown in Figure 2) for this composite. This is in line with expectations and
further supports the Scoping Study 21 assumptions for the product recoveries and the production of a combined
concentrate of apatite and monazite.
%REO Recovery
100
80
60
40
20
20
30
40
50
60
70
80
90
100
% P2O5 Recovery
AM204-1 - CRCS4a Phosphate Bulk Float
Figure 2: TREO recovery vs. P2O5 recovery
The bulk float results have further demonstrated the potential of producing a premium phosphate-rare earth
mineral concentrate from the Cummins Range deposit using a simple, proven beneficiation technique. Following
these positive flotation results, the next phase of the phosphate mineral beneficiation testwork will focus on
demonstrate similar, if not better, flotation performance of the Rare Dyke material, grind size optimisation, further
gangue suppression, flotation conditions and circuit configuration optimisation to ensure the technical and
economic feasibility of the beneficiation flowsheet.
21 ASX announcement 22 Aug 2023: Enhanced Scoping Study for Cummins Range
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Level 1, 338 Barker Road
Subiaco WA 6008
Australia
P +61 (0) 8 6383 6593
E info@rarex.com.au
ree.investorhub.com/welcome
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
Phosphoric acid testwork
Test work undertaken on primary Phos-RE mineral concentrate product from Cummins Range during the Quarter
indicated strong potential to produce high-purity phosphoric acid suitable for lithium-ferro-phosphate (LFP)
battery application.
Following the positive dilute phosphoric acid leaching testwork results 22 that showed high apatite dissolution and
low impurity dissolutions, RareX has conducted further assessments on the suitability of processing the highpurity leach liquor from Cummins Range into high-purity phosphoric acid and potential methods to further
upgrade the leach residue into more valuable RE concentrate.
Based on the assessments and market feedback, the dilute leach liquor from Cummins Range is considered
“pure” given its low gangue element concentrations when compared with leach liquor generated from
sedimentary rocks. This is due to the following characteristics of the Cummins Range deposit:
Igneous deposit which is naturally lower in deleterious elements and heavy metals when compared with
sedimentary deposits.
Mineral concentrate produced is rich in premium-quality apatite, which is highly available and low in
deleterious elements.
Minimal RE is contained within the apatite, allowing easy separation of monazite and apatite and minimal
RE loss to solution using dilute phosphoric acid leach.
Phosphoric acid is mostly produced via the wet process, which uses concentrated sulphuric acid to react with
finely-ground rock phosphate to maximise apatite dissolution. The rock phosphate feedstock must contain low
impurities in order for the process to be technically and economically viable for processing into merchant-grade
(MGA) or technical-grade phosphoric acid. Typically, a significant amount of further purification is required on
this production method.
Unlike the conventional wet process, RareX is proposing a simple dilute phosphoric acid leach and flotation
process for the Cummins Range Phos-RE concentrate (as shown in the schematic). This process is expected to
require significantly less purification to reach LFP grade, whilst also liberating the rare earths for further
upgrading into a high-grade RE concentrate.
RareX envisages that the proposed product treatment process would be undertaken at an offtaker/s existing
plant and aims to maximise the phosphate and rare earths values through the following steps:
1. Apatite Leach - Taking a bleed of the dilute phosphoric acid that is already being produced in the wet acid
plant to treat the Cummins Range Phos-RE concentrate. As demonstrated by the recent positive
testwork2, 23, 24, the apatite within the Cummins Range concentrate is pure and highly available.
2. Acid Production, Concentration and Purification - The leach liquor can be fed into the existing phosphoric
acid generation, concentration and purification circuits to process to LFP requirements with likely fewer
purification steps and less reagent demand.
3. RE Beneficiation - The rare earths will remain in the leach residue at elevated grade2 durin