Cummins Range Project Development and Strategy Update
Released
Released
Announcement PDF
ASX Release
13 April 2023
Cummins Range Rare Earths-Phosphate Project – Development and
Strategy Update
Updated Resource and significant change in project scale provides catalyst for staged
development approach commencing with initial DSO phosphate fertiliser phase.
Highlights
• Recent Mineral Resource update confirms scale and significance of the Cummins Range Rare EarthsPhosphate Project.
• New development concept highlights potential for a fast-tracked DSO phosphate fertiliser stage (Stage
1), as a catalyst for the rare earth stage.
• Stage 1 would be followed by phosphate, and subsequently rare earth, beneficiation (Stages 2 & 3).
• Stage 1 studies are being fast tracked whilst Stages 2 & 3 are following a more traditional PFS>DFS
approach.
• RareX will continue to assess the development of a large and strategic, domestic, rare earth value chain
as part of Stage 3.
• RareX’s leadership team restructured to progress this simplified development plan.
• Updated global Mineral Resource due in late April 2023, to be followed shortly by a revised Scoping
Study encompassing the new 3-Stage, DSO-catalysed development approach.
RareX limited (ASX: REE, RareX or the Company) is pleased to provide an update on the development
strategy for its 100%-owned Cummins Range Phosphate-Rare Earths Project (Cummins Range, the
Project), located just south of Halls Creek in the Kimberley region of Western Australia following the recent
Mineral Resource update and key director and management changes.
The recent Mineral Resource update, to be followed by a further significant Resource update due by late April
2023, underpins a re-framing of the Project as a highly significant phosphate-hosted rare earths deposit
commencing from surface.
For more information,
please contact:
Investors: James Durrant, CEO
Media: Nicholas Read, Read Corporate
P +61 (0) 8 6383 6593
P +61 (0) 8 9388 1474
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Level 1, 338 Barker Road
Subiaco WA 6008
Australia
RareX Limited (ASX:REE)
@rarex_asx
P +61 (0) 8 6383 6593
info@rarex.com.au
rarex.com.au
The concept emerging as a result of the new understanding of the resource, coupled with important recent
metallurgical testwork results (see later sections of this release), suggests the option for an initial fasttracked DSO (direct shipping ore) phosphate fertiliser phase (Stage 1), followed by phosphate beneficiation
(Stage 2) and subsequently rare earth beneficiation and value chain development (Stage 3).
This staged approach is expected to lower the risk associated with building the full rare earth value chain outright at the beginning, by delivering a simpler and lower-cost DSO phosphate operation using existing
infrastructure, whilst maintaining development towards a large scale, strategic, rare earth and phosphate
critical minerals project.
Given the new understanding of the deposit and the emerging development possibilities, the Company has
restructured its senior leadership team to strengthen the strategic, sales and marketing, and operational
aspects of the business in the fields of bulk commodities, fertilisers and rare earths to capitalise on the shortterm opportunities the project potentially presents, while continuing to de-risk the longer term pathway to
develop the full resource and participate in the full rare earth value chain.
This re-framing and simplification of the Project marks a key step in RareX’s transition from explorer to
developer.
Project Summary
The Cummins Range Project is an igneous carbonatite intrusive complex, visible from surface and located in a
remote but accessible area of the Great Sandy Desert, 135km south-west of Halls Creek and 50km off the
Tanami Road. Exploration drilling has been underway since RareX acquired the Project in 2019.
Exploration conducted by RareX has resulted in a recent Mineral Resource upgrade that indicates the
presence of a significant quantity of high phosphate grade regolith overburden material with material
quantities and grades of rare earths, overlaying a fresh rock rare earth-phosphate deposit of global
significance.
Mineral Resource Update
Phase 1 of the new Mineral Resource Estimate (MRE) (for the Rare Dyke) was released on 30 March 20231,
which provided a description of the geology and estimation approach. Phase 2 of the MRE update covering the
Phos Dyke portion of the deposit is due later this month.
Critically, a phosphate cut-off grade is being used for this rare earth deposit because it is clearly both a rare
earth and a phosphate deposit which should be considered as a large-scale polymetallic deposit. A holistic
development approach is therefore being adopted based on the extraction of all valuable minerals to
maximise shareholder value. Within the large phosphate resource remain significant tonnes of high-grade
rare earths mineralisation as demonstrated in 20212.
ASX Announcement: Substantial increase in Cummins Range “Rare Dyke” Mineral Resource to 397Mt at 0.33% TREO, 4.2% P₂O₅. 30 March 2023. RareX confirms that
it is not aware of any new information or data that materially affects the information included in the original market announcement and that all material assumptions and
technical parameters underpinning the estimate in the relevant market announcement continue to apply and have not materially changed.
2
ASX Announcement: RareX Delivers Major Resource Upgrade at Cummins Range Rare Earths Project, WA. 19 July 2021.
1
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Level 1, 338 Barker Road
Subiaco WA 6008
Australia
P +61 (0) 8 6383 6593
info@rarex.com.au
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
The recently released MRE positions Cummins Range as the second largest undeveloped rare earth deposit,
and one of the largest and best located igneous phosphate deposits (with proximity to port) in Australia.
Importantly for phosphates, igneous deposits contain significantly lower deleterious elements including
heavy metals and radioactive isotopes – which improves product chemistry and attractiveness, supports
product pricing and affords the lower grade material greater refining flexibility.
Figure 1 - Cross section of the Cummins Range deposit
Since the deposit is now globally significant in scale, drilling in the upcoming 2023 field season will focus on
multi-function holes covering deposit definition in the areas proposed to be mined within the first few years,
metallurgy, geotechnical and hydrogeology.
Scoping Study Update
An initial Scoping Study3 was completed based on the 2021 Mineral Resource Estimate4 last year which
focused primarily on the upper weathered portion of the ore body.
This Scoping Study was based on preliminary metallurgical testwork focusing on the flotation of the rare
earth-bearing monazite, followed by hydrometallurgical refining, which presented a classical rare earth
configuration not dissimilar to the proposed developments of similar deposits. Although the economics were
found to be attractive, further assessment of the approach identified three potential pathways to improve
project economics, simplify the proposed on-site infrastructure and provide a lower risk pathway to a
commercial operation.
3
4
ASX Announcement: Positive Scoping Study for Cummins Range Shows Potential for Sustainable, Long-Life Rare Earths Project. 12 September 2022.
ASX Announcement: RareX Delivers Major Resource Upgrade At Cummins Range Rare Earths Project, WA. 19 July 2021.
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Level 1, 338 Barker Road
Subiaco WA 6008
Australia
P +61 (0) 8 6383 6593
info@rarex.com.au
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
Firstly, the rare earth overburden material, particularly above the Phos Dyke, was found to contain significant
phosphate grades, with favourable bioavailability, in a low contaminant host rock, allowing for potential
monetisation of the pre-strip.
Secondly, phosphate-optimised flotation tests have demonstrated the ability to simply float a combined
monazite-apatite mineral combination with high recoveries and upgrade. This simplifies the rare earth
beneficiation process flowsheet design from last year’s Scoping Study, which split the regolith-sourced
phosphate bearing minerals into two streams – both of which underwent further, separate processing before
becoming two different products: one, a phosphate acid stream following the subsequent treatment in a
hydrometallurgical plant, and the other, a phosphate bulk mineral concentrate from the flotation tails of the
beneficiation plant.
Thirdly, an early but growing understanding of fresh rock underlaying the regolith material suggests that the
rare earth reports through coarser grained minerals – suggesting that improved rare earth recovery and
upgrade performance is achievable with only a slight modification to the regolith focused beneficiation plant.
Given these technical opportunities and in the wake of the updated MRE, a revision of the Scoping Study is
underway with a particular focus on the DSO opportunity for potential expedited project delivery while the
longer-term project configuration is further designed. This updated Scoping Study is due for completion soon.
It should be noted that Pre-Feasibility Study work streams are already underway for aspects of the Project
that are unlikely to be impacted by this re-framing. This includes work on road and port design and on
hydrogeological and geotechnical aspects, as well as the important baseline heritage and environmental
surveys to support project approvals.
Proposed Project Pathway
The Project is now conceived as a three-phased phosphate-enabled rare earth project with an expedited DSO
project as Stage 1. Work is underway to understand the details of the three stages and metallurgical testing
has been structured accordingly:
Stage 1. DSO phosphate
This stage is the proposed bulk mining of apatite mineral rock phosphate contained within the overburden,
with trucking to Wyndham Port for transhipment to ocean going vessels.
Most of the 500km road between Cummins Range and Wyndham Port is in place and sealed; the Tanami Road
is undergoing a Main Roads WA upgrade which commenced in 20225 and Shawmac Civil Design Consultants,
who have relevant experience in the Project area, are designing the all-weather mine site haulage road linking
the mine to the Tanami Road.
This proposed 50km long road traversing flat, semi-arid desert has undergone consultations with the local
pastoralists and is entirely on Jaru determined land, the same Traditional Owners as Cummins Range.
5
https://www.mainroads.wa.gov.au/projects-initiatives/all-projects/regional/tanami-road-upgrade/
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Level 1, 338 Barker Road
Subiaco WA 6008
Australia
P +61 (0) 8 6383 6593
info@rarex.com.au
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
RareX has recently signed an MOU with Agrimin (ASX: AMN) for utilising the joint venture (JV) haulage
company, Newhaul Bulk, established between Agrimin and Newhaul6, giving a good option alongside
Cambridge Gulf Limited (CGL) for bulk haulage. The MOU also covers collaboration and sharing of
infrastructure at Wyndham Port, where studies are underway with Ausenco for both solo and shared options
for bulk handing infrastructure, including discharge, storage and barge loading.
Consultations are also underway with Transhipment Australia (TSA), which has operated transhipment
services between the port and ocean-going vessels for the Ridges Iron Ore Mine owned by Kimberley Metals
Group.
The metallurgical tests of the likely DSO rock phosphate showed much higher bioavailability levels than the
industry high-standard (9%) for use as direct application fertiliser, which is probably a result of the formation
and weathering of the deposit and could be a significant positive differentiator relative to other rock
phosphate products. Additionally, because of the DSO direct application nature of this potential product, it is
likely to be considered organic and would therefore be of interest to the speciality market focussed on highvalue crops.
Table 1: DSO Bioavailability
Sample
Bioavailability, % P2O5
28% P2O5 DSO sample
41.9%
34% P2O5 DSO sample
49.3%
Note: Tests undertaken were the 2% citric acid leach tests which is an industry standard bioavailability assessment test that simulate the soil
conditions and is used to predict the suitability of rock phosphate for use as direct application fertiliser.
An MOU is in place with OrdCo7, the primary distributor of fertilisers in Kununurra, for the development of a
product roadmap and an off-take and distribution agreement for the purposes of providing all the local
phosphate fertiliser requirements for the regional agricultural and pastoral sector.
The Ord River irrigated region, in addition to the upcoming Carlton Plain by Kimberley Agricultural Investment
(KAI), and other regions under clearing, soil conditioning and pre-cropping, accounts for approximately 50
thousand hectares of agricultural land.
This presents a small but important part of the off-take strategy.
Stage 2. Phosphate mineral concentrate (low-grade rare earths)
This stage continues with phosphate fertiliser production, but involves the proposed installation of simple
flotation beneficiation infrastructure in order to concentrate the lower grade phosphate minerals from the
regolith materials in the deposit.
6
7
Agrimin ASX Announcement: Haulage Joint Venture and Strategic Alliance. 3 December 2019.
ASX Announcement: RareX Signs MOU for Supply of Phosphate Products Locally. 7 November 2022.
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Level 1, 338 Barker Road
Subiaco WA 6008
Australia
P +61 (0) 8 6383 6593
info@rarex.com.au
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
Metallurgical testwork8 has shown upgrades of c.13% feed grade mineral phosphate to over c.35% P2O5 using
typical flotation methods.
Table 2: Phosphate Flotation Results
Product
CDX0015 Fresh
P2O5
CDX0015 Regolith
Bioavailability
P2O5
Bioavailability
Grade
%
Recovery
%
%P2O5
Dissolution
% P2O5
Dissolution
Recovery
%
%P2O5
Dissolution
Final
Concentrate
39.1
80.3
19.7
34.1
85.7
24.3
Head Grade
13.4
-
-
12.8
-
-
The upgraded phosphate material has shown good results on both bioavailability tests as well as lower
deleterious element grades than industry standards for fertilisers. This is a significant positive differentiator
for igneous deposits over the more traditional sedimentary deposits, which typically contain much higher
levels of heavy metals and lower bioavailability reactivity.
Studies are currently underway for a 5Mtpa feed beneficiation plant with Primero, a vertically integrated
engineering group founded by RareX board member, Cameron Henry. Optimisation studies are about to
commence to determine the installation schedule and, as a result, the duration of the Stage 1 project.
Off-takers of this stage are anticipated to comprise a mixture of direct application fertiliser distributors from
Stage 1 as well as established phosphoric acid producers, particularly those with the capacity to develop rare
earth extraction processes from the residue.
It is believed that high phosphorous extraction can be achieved with minimal rare earths loss during the
phosphoric acid production process. This is supported by the initial refining testwork undertaken at
Australia's Nuclear Science and Technology Organisation (ANSTO) and Nagrom where the results showed
>90% P2O5 extraction with <2% RE loss to the leach solution. In addition, mineralogy studies on both high
and low grade RE samples showed consistent mineralogy where monazite was not showed to be associated /
locked by apatite, hence selective leaching of apatite should be achievable with minor RE loss. Refining
testwork on low grade RE phosphate concentrate is underway to evaluate the extraction of phosphate for
production of phosphoric acid and synthetic fertilisers as well as rare earths deportment during the process.
Stage 3. Rare Earths
This third stage is conceived to make the transition into rare earths production by expanding the beneficiation
plant in Stage 2 with the requisite capital upgrades to manage the high-grade rare-earth regolith and
subsequently fresh rock material.
Testwork has been continuing with Auralia Metallurgy with parallel testwork underway at BTMR in China.
8
ASX Announcement: Met Testwork Delivers Premium Phosphate Concentrate. 04 October 2022.
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Level 1, 338 Barker Road
Subiaco WA 6008
Australia
P +61 (0) 8 6383 6593
info@rarex.com.au
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
Early testwork has been very encouraging with positive results for both P2O5 and RE concentration achieved.
While the majority of testwork to date are on regolith samples, fresh samples have shown good amenability to
upgrading via ore sorting9 and flotation.
The resulting rare earth and phosphate concentrate is anticipated to be well suited for the phosphoric acid
producers from Stage 2 as well as deriving rare earth credits from the product mix. Additional work is
underway to develop the off-take strategy and associated market placement opportunities for both the rare
earth and phosphate value in Saudi Arabia, South Korea and Japan for the combined rare earth and
phosphate mineral concentrate.
Hydrometallurgical testwork on a relatively high P2O5 and TREO grade concentrate at ANSTO has been
conducted to confirm the basic amenability of this mineral concentrate to phosphoric acid generation and
rare earths extraction. Although the test was preliminary in nature, the Company has received sufficient
positive indications to pursue this approach, with further follow up work currently being planned.
Production of such a high value rare earth and phosphate concentrate also opens up the opportunity to grow
the onshore value chain, including further beneficiation (i.e., sequential flotation or magnetic separation) and
hydrometallurgical refining, where hydro-electric powered industrial sites at Wyndham Port and the closed
Argyle Diamond Mine provide interesting optionality.
Feasibility Studies
This three-stage approach provides a potential expedited approach to revenue while de-risking the approach
towards establishing a large rare earth and phosphate processing hub in northern Australia.
Feasibility studies are investigating this pathway and a specific emphasis is being placed on accelerating the
DSO portion while maintaining a technical pathway towards the ultimate goal of producing rare earth critical
metals. RareX aims to announced revised project economics this financial year and a Feasibility Study on
Stage 1 by the end of 2023.
Heritage and Environmental Update
Negotiations with the Jaru Traditional Owners are on track with a draft Mining Agreement and compensation
proposal complete. The RareX team, with support from Allens law firm, will meet with the Traditional Owners
Negotiation Committee again towards the end of April with the goal of completing negotiations before the
start of the 2023 wet-season.
RareX wishes to take this opportunity to thank the Jaru TONC for a constructive, collaborative, and pragmatic
approach to the negotiations.
MBS Environmental, with support from WSP Golder, have designed the environmental approvals strategy and
have been project managing the environmental and heritage surveys. The final flora and fauna surveys are
due in May 2023.
9
ASX Announcement: Positive Ore Sorting Testwork Results for Cummins Range. 11 October 2022.
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Level 1, 338 Barker Road
Subiaco WA 6008
Australia
P +61 (0) 8 6383 6593
info@rarex.com.au
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
Baseline environmental studies should be completed in 2023, allowing for the requisite approval submissions
in early 2024. The DSO Stage 1 will follow a simplified approvals path with the more complex Stage 2 and
Stage 3 approvals expected to run in parallel.
Marketing and Pricing Update
The Cummins Range Project gives investors exposure to two global mega-trends.
Rare earths have their macro market drivers in the new electronic revolution, particularly NdPr – which
enables the clean production and use of electricity through wind turbine generators and electric vehicle
motors. This is overlayed by government incentivisation and mandates to both reach net-zero carbon dioxide
emissions by 2050 and to create independent, sovereign, critical mineral value chains.
While pricing has softened of late due to rare earth exports from China, RareX expects these macro drivers to
support rare earth prices over the longer term. While alternative technology may cannibalise some of the
electric vehicle market demand, global demand for rare earths is expected to remain strong due to the
increasing use of rare earths in a multitude of technologies.
Rare earth pricing is usually calculated as a basket, and the NdPr price is keenly followed. Current Nd and Pr
oxides are at approximately US$80 per kg10, having come off their highs at close to US$200 per kg.
Demand is driven largely by electric vehicle market growth. By 2040, the world needs 15 times the rare earth
output produced by Lynas (ASX: LYN)11, which in 2021 was approximately 5,500 kg of NdPr oxide12.
Phosphate consumption is driven by food security. As the population expands another 1.7B people by 2050,
more intensive farming is required on ever more nutrient depleted soils. Phosphate is one of the three macro
nutrients known as NPK – nitrogen, phosphate and potassium – and is applied annually on farms and precropping on new, recently cleared areas.
Additionally, mineral phosphate is fed to cattle as a feed supplement, particularly in Australia’s north where
the soils are depleted, and the livestock need be robust in the more challenging environmental conditions.
The recent war in Ukraine, and the subsequent sanctions on Russia, have disrupted global phosphate supply
pushing up prices for at least the medium term.
Phosphate is priced Morocco FOB and currently US$ 300 – 350 per tonne13 for 32% P2O5. Historically
pricing has remained between US$ 100 and US$ 200. Growth in demand is anticipated at 6% CAGR14.
https://www.metal.com/Rare-Earth-Oxides
https://bnef.turtl.co/story/evo-2021/page/4/1?teaser=yes
12
https://wcsecure.weblink.com.au/pdf/LYC/02434182.pdf
13
https://www.indexmundi.com/commodities/?commodity=rock-phosphate
14
https://www.businesswire.com/news/home/20230111005677/en/Phosphate-Rock-Global-Market-Report-2022-Increasing-Food-and-Feed-Production-BolstersSector-Growth---ResearchAndMarkets.com#:~:text=The%20global%20phosphate%20rock%20market,(CAGR)%20of%206.2%25.
10
11
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Level 1, 338 Barker Road
Subiaco WA 6008
Australia
P +61 (0) 8 6383 6593
info@rarex.com.au
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
Timelines
Detailed project timelines for the 3-staged project are being prepared as part of the updated Scoping Study.
The timeframes provided in this announcement are indicative only and are subject to change.
DSO Stage One
Five key deliverables are required to enable Stage One and are expected to be completed over the next 12-18
months:
1. Confirm the resource and further define the DSO phosphate portion.
a. Global resource.
b. Increased resource definition.
2. Confirm the business case.
a. Scoping Study.
b. Definitive Study.
3. Close infrastructure gaps (port facilities and mine site access road).
a. Design and select solution.
b. Construction / integration.
4. Develop the DSO marketing strategy.
a. Market and customer segmentation.
b. Local and regional offtake.
5. Complete approvals (environmental, heritage).
a. Mining.
b. Miscellaneous.
This approach has the potential to enable a financial investment decision to be made and potential operations
of DSO material by 2025.
Stages 2 and 3
Feasibility Studies for the second and third stage of the Project will run in parallel to developing and
executing an expedited DSO phosphate project with key dates estimated as follows, with further definition to
be provided upon completion of the scoping level assessment:
1. Scoping Study (2H2023)
2. Pre-Feasibility Study (1H2024)
3. Definitive Feasibility Study (1H2025)
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Level 1, 338 Barker Road
Subiaco WA 6008
Australia
P +61 (0) 8 6383 6593
info@rarex.com.au
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
Consultants
RareX continue to be supported in studies and approvals by well renowned and qualified consulting
individuals and firms as shown below.
Consultant
Scope
Mining Plus
Updated Scoping Study and PFS - Mining
Primero
Updated Scoping Study and PFS – process and NPI
Knight Piesold
Water and Tailings PFS
Shawmac
Product haulage road design PFS
Ausenco
Supply chain and transhipment PFS
Primero (Damien Krebs)
Metallurgical consulting
Gavin Beer
Metallurgical consulting
Resources WA
Power and location study and options study
Lab: Auralia-Met
Flotation
Lab: Nagrom
Digestion, mineralogy, magnetics.
Lab: Strategic Met
Ionic clay diagnostic leaching
BTMR
Flotation trials in China
MBS (Rapallo)
Environmental approvals management
Rapallo
Flora and fauna surveys
WSP Golder
Community engagement, aboriginal impact, heritage surveys
Allens (Legal)
Heritage negotiation
PWC (Legal)
Power purchase agreement
This announcement has been authorised for release by the Board of RareX Limited.
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Level 1, 338 Barker Road
Subiaco WA 6008
Australia
P +61 (0) 8 6383 6593
info@rarex.com.au
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
Competent Persons Statements
The information in this release that relates to metallurgical testwork is based on information compiled and /
or reviewed by Mr Gavin Beer who is a Member and Chartered Professional of The Australasian Institute of
Mining and Metallurgy (AusIMM). Mr Beer is a consulting metallurgist being the founder and principal of MetChem Consulting Pty Ltd and has sufficient experience relevant to the activity which he is undertaking to be
recognised as competent to compile and report such information. Mr Beer consents to the inclusion in the
report of the matters based on his information in the form and context in which it appears. Mr Beer does not
hold securities in RareX.
The information in this release that relates to the Mineral Resource Estimate was reported in accordance
with Listing Rule 5.8 on 30 March 2023. The Company confirms that it is not aware of any new information
or data that materially affects the information included in the original market announcement and that all
material assumptions and technical parameters underpinning the estimate in the relevant market
announcement continue to apply and have not materially changed.
Mineral Resource Estimate Table
Classification
Indicated
Inferred
Total
Tonnes
(Mt)
44.3
352.9
397.2
P2O5
(%)
6.3
3.9
4.2
TREO + Y2O3
(ppm)
5,800
2,960
3,270
HREO
(ppm)
290
165
180
Nd2O3
(ppm)
930
490
540
Pr6O11
(ppm)
280
140
160
Nb2O5
(ppm)
1,020
570
620
Sc2O3
(ppm)
100
70
70
ThU
(ppm)
90
40
50
Notes:
1.
Due to effects of rounding, the total may not represent the sum of all components.
2.
TREO (ppm) includes: Light Rare Earth Oxides (LREO): La2O3, CeO2, Pr6O11, Nd2O3; and Heavy Rare Oxides (HREO): Sm2O3, Eu2O3, Gd2O3, Tb4O7, Dy2O3,
Ho2O3, Er2O3, Tm2O3, Yb2O3, Lu2O3; + Y2O3
3.
ThU comprises ThO2 + U3O8 (ppm)
4.
Mineral Resource is reported from all blocks, classified as either Indicated or Inferred, where interpolated block grade is >2.5%P2O5
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Level 1, 338 Barker Road
Subiaco WA 6008
Australia
P +61 (0) 8 6383 6593
info@rarex.com.au
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
Appendix A
Metallurgical test sample source
Hole ID
East MGA
North MGA
RLUTM
End Depth
Azimuth
Dip
Type
CDX0005
307141
7866598
392
210.9
56
59
Diamond
CDX0006
307193
7866537
391
215.8
51
59
Diamond
CDX0009
307325
7866444
391
213.4
49
59
Diamond
CDX0010
307159
7866508
391
231.3
50
60
Diamond
CDX0012
307038
7866666
392
210.9
52
59
Diamond
CDX0016
307007
7866638
392
298.2
52
59
Diamond
CRX0003
307267
7866661
392
97
182
60
RC
CRX0010
307209
7866731
392
126
182
60
RC
CRX0035
307372
7866583
392
138
182
60
RC
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Level 1, 338 Barker Road
Subiaco WA 6008
Australia
P +61 (0) 863 836 593
info@rarex.com.au
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
Appendix B
JORC Table 1
Section 1: Exploration Results - Metallurgy
(Criteria listed in this section also apply to following section.)
Criteria
Sampling
techniques
JORC Code explanation
• Nature and quality of sampling (e.g., cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc.). These examples
should not be taken as limiting the
broad meaning of sampling.
Commentary
• Both RC chips and diamond drill cores were
sampled for the metallurgical testwork.
Samples were selected based on drill assays,
drill hole location and intervals, geological
and mineralogical data. Samples were riffle
split from bulk samples and sent to Auralia
Metallurgy in Perth and/or Nagrom Perth
and/or ALS Perth for assays and further
testwork.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
• For RC chips, the entire bulk samples were
riffle split to ensure a representative sample
from the selected interval. For diamond drill
cores, half core was sent to a laboratory to
conduct crushing and sampling. All
laboratories used in the assaying of the
Cummins Ran