KCC: Porphyry system further extended at Trundle Park
Released
Released
Announcement PDF
Porphyry system further
extended at Trundle Park
•
• Most recent drill hole TRDD014W1 has intersected multiple skarn horizons and broad
intervals of porphyry style intrusions at the Trundle Park prospect (assay results pending);
• This hole was a wedge drilling off previous hole TRDD014 and has confirmed previous skarn
intervals and extended the intrusive systems returned in both TRDD014 (65.5m @ 0.25 g/t
gold & 0.04% copper, including 10m @ 0.73 g/t gold & 0.10% copper) and TRDD022 (162m
@ 0.24 g/t gold & 0.04% copper, including 18m @ 0.75 g/t gold & 0.09% copper);
• A follow up hole (TRDD028) has commenced to the west of TRDD014W1 and south of
TRDD022 to further test the identified mineralized corridor and multiple phase intrusive
system associated with holes TRDD022, TRDD014/W1 and TRDD001 (21.1m @ 0.25 g/t
gold and 0.03% copper to end of hole);
• The direction south from TRDD014/W1 and TRDD028 remains open for future drill testing.
Melbourne, Australia — October 29th, 2021
Kincora Copper Limited (the Company, Kincora) (TSXV & ASX:KCC) is pleased to provide an
exploration update from ongoing drilling at Trundle Park prospect situated at the brownfield
Trundle project, located in the Macquarie Arc of the Lachlan Fold Belt (LFB) in NSW, Australia.
John Holliday, Technical Committee chair, and Peter Leaman, VP of Exploration, noted:
“The wedge off and extension from TRDD014 has intersected the targeted monzonite
system intruding a larger monzodiorite body with zones of interpreted variable to
strongly developed outer potassic alteration. This setting was generally not apparent
in the original TRDD014 hole and has returned larger interpreted zones of “red”
monzonite and monzodiorite intrusions than TRDD022. TRDD014W1 has provided
significant strike and depth extension from TRDD022, and depth extension from
TRDD014.
These are encouraging signs, however, we have still not yet intersected the systems
core. Our drilling has demonstrated a significant size and multiple intrusive system is
present with the features suggestive of being in a proximal environment to a target
that offers clear scale potential. From here, only further systematic drilling will
confirm or downgrade this target.
A recently commenced follow up hole is being drilled west from and parallel to
TRDD014, testing south of TRDD022, and west of both TRDD014W1 and TRDD001. A
clear intrusive porphyry system target zone is emerging at the Trundle Park prospect
with the south remaining open for further drilling.”
Two diamond rigs remain operational, one currently drilling TRDD028 at the Trundle Park
prospect at Trundle, and the other completing a fifth hole and final of the first phase diamond
drilling program at the Gateway prospect at the Fairholme project, with assay results from
recent drilling pending.
Porphyry system further extended at Trundle Park
Website: www.kincoracopper.com
1
Email: enquiries@kincoracopper.com
Figure 1: Kincora is currently drilling the Trundle and Fairholme projects
• Favourable locations of the key porphyry belts of the Macquarie Arc
• Advance stage exploration projects with demonstrated large scale mineralised systems
• Hallmarks to neighbouring world-class deposits
MACQUARIE ARC
JUNEE-NARROMINE
VOLCANIC BELT
MOLONG VOLCANIC
BELT
KINCORA’S
PROJECTS
Figure 2: Trundle is the only brownfield porphyry project held by a listed junior in the
Lachlan Fold Belt (LFB), located within Northparkes Igneous Complex which already
hosts the 2nd largest porphyry mine in Australia (endowment 5.5Moz Au & 4.5Mt Cu1)
• Large geochemical footprints with a cluster of concealed intrusive deposits at Northparkes
1 Bespoke March 2020 report by Richard Schodde, MinEx Consulting, for Kincora
Porphyry system further extended at Trundle Park
Website: www.kincoracopper.com
2
Email: enquiries@kincoracopper.com
Trundle Park prospect
Recent drilling at the Trundle Park prospect has confirmed a significant area and multiple
intrusive porphyry system with a mineralised zone emerging.
Hole TRDD022 returned 162m @ 0.25 g/t gold, 0.04% copper and 9 ppm molybdenum (from
670m), including 46m @ 0.54 g/t gold and 0.08% copper (from 684m) and 18m @ 0.75 g/t
gold and 0.09% copper (from 712m) (announced August 17th, 2021: “Significant gold bearing
intervals at Trundle Park”). This hole was followed up by TRDD026, a scissor hole expanding
the system to the NNW with two distinct zones of the targeted monzonite intrusion with a
larger monzodiorite system (announced September 23rd, 2021: “Porphyry system extended at
Trundle Park”).
A wedge drilling off the previous hole TRDD014 (namely TRDD014W1) sought to test the
vertical extent of the main mineralised zone in TRDD022 down dip and on strike to the SSE,
and to depth and horizontally towards the NNW from TRDD014 (65.5m @ 0.25 g/t gold and
0.04% copper, including 10m @ 0.73 g/t gold and 0.1% copper). While testing the intrusive
target at depth under TRDD022 the wedge and extension (TRDD014W1) has intersected the
targeted monzonite vein-dyke system intruding a larger monzodiorite intrusion with zones of
interpreted variable to strongly developed outer potassic alteration. This setting was generally
not apparent in the original TRDD014 hole and has returned larger interpreted zones of “red”
monzonite and monzodiorite intrusions than TRDD022. TRDD014W1 has provided significant
strike and depth extension from TRDD022, and depth extension from TRDD014.
Figure 3: TRDD022, TRDD026 and TRDD014W1 confirm a multiple phase, multiple
intrusive system with demonstrated mineral tenor, analogous lithology and alteration to
the targeted intrusive porphyry systems that occur elsewhere in the wider and immediate
region (at Cadia and Northparkes respectively)
(a) Plan view of Trundle Park prospect and planned hole TRDD028 - see Figure 3 (b) for section
DRILL HOLES
Kincora drilled
Planned/ongoing
Historic
Informal workings
Potassic alteration
TRDD026
Proximal skarn
TRDD007
Monzonite
TRDD022
TRDD001
TRDD004
Zinc halo
(>100m surface,
>100ppm)
Section line
TRDD008
TRDD028
TRDD014W1
DEPTH SLICE 250M
BELOW SURFACE
(WITH HISTOGRAM)
Gold (>0.1g/t)
Copper (>500ppm)
200m
Porphyry system further extended at Trundle Park
Website: www.kincoracopper.com
Magnetic inversion
3
Email: enquiries@kincoracopper.com
(b) Working Leapfrog model and design of hole TRDD028 – Trundle Park prospect section
(Section line through Figure 3 (a). Length ~900m and width ~400m)
TRDD026
TRDD028 1
TRDD022
DRILL HOLE KEY
TRDD014W1
Collar
>0.5 CuEq
0.1-0.5 CuEq
GEOLOGY MODEL
Potassic Alteration
1 Design of on-
200m
going hole
Sericite Alteration
Skarn Alteration
(c) Insert with mineralised intervals and illustration of strike/down dip target of TRDD028, noting the
distance from TRDD028 to TRDD014W1 is approximately 100m west and 115m south-west to TRDD022
TRDD008
162m @ 0.25 g/t Au & 0.04% Cu from 670m incl:
• 46m @ 0.54 g/t Au & 0.08% Cu from 684m; &,
• 18m @ 0.75 g/t Au & 0.09% Cu from 712m
44m @ 0.20g/t Au & 0.14% Cu from 358m incl:
• 7m @ 0.64g/t Au, 0.53% Cu from 385m
TRDD001
TRDD026
19m @ 0.43g/t Au, 0.21% Cu from 388m incl:
• 4m @ 0.94g/t Au, 0.57% Cu from 394m
22m @ 0.23g/t Au, 0.07% Cu from 482m incl:
• 1.3m @ 2.34g/t Au, 0.54% Cu from 486m
65.5m @ 0.25g/t Au, 0.04% Cu from 600m incl:
• 10m @ 0.73g/t Au, 0.1% Cu from 626m
TRDD014
TRDD014W1
100m
TRDD028 1
Porphyry system further extended at Trundle Park
Website: www.kincoracopper.com
DRILL HOLE KEY
Collar
>0.5 CuEq
0.1-0.5 CuEq
GEOLOGY MODEL
Monzonite
Monzodiorite
Sericite Alteration
1 Design of on-going hole
Skarn Alteration
4
Email: enquiries@kincoracopper.com
From initial logging of TRDD014W1 notable zones include (with assay results pending):
1. Upper skarn zone: cavity filling skarn with early green garnet-pyroxene-magnetite
overprinted by K-feldspar-carbonate-hematite +/- pyrite +/- chalcopyrite from 298403.9m downhole, hosted by volcanoclastic rocks.
2. Lower skarn zone: massive tan-brown garnet skarn along with some voids filled with
prehnite and carbonate-epidote +/- pyrite, in turn cut by later pyrite veinlets, from 458492m downhole.
3. Monzodiorite intrusion: with albite alteration occurs from 499-849.5m downhole,
along with broad intervals containing red quartz monzonite vein dykes and an interval
with garnet endoskarn (see following descriptions for points 4 and 5) and pyrite
stringers +/- magnetite also noted.
4. Quartz monzonite vein dykes: distinctly red, range from >1cm to <100cm in width,
and cut the monzodiorite in two main intervals from 631-676m and 718.4-769m
downhole. Traces of chalcopyrite along with minor pyrite and quartz were observed as
clots and along veinlets in zones of the quartz monzonite with pyrite stringers +/magnetite also noted.
5. Endoskarn: comprises a dark brown garnet with magnetite filling voids within the
monzodiorite host rock from 690-718.4m. Magnetite alteration is strong and can also
occur along fine fractures and veinlets surrounding garnet.
6. Thrust fault then further volcanoclastic sequence: the interpreted regionally
significant westerly dipping thrust fault (the Tullamore thrust) was intersected in close
proximity to the forecast depth at 849.5m and defined by sheared red clays to 856m
downhole, along with a preserved slice of a sheared volcanoclastic sequence +/- pyrite
intersected from 856-876.65m (end of hole). The latter, indicating the potential for a
stacked volcanic and intrusive system.
See Figure 6 for examples of the described rock types in TRDD014W1 with Figures 3 and 4
illustrating the current intrusive model, interpretation and target zone at the Trundle Park
prospect. An illustration of the rocks and alteration in and around the core of the intrusive
systems and deposits at Northparkes are provided in Figure 5.
The multiple phase, multiple intrusive setting returned in TRDD022, TRDD026 and
TRDD014W1, endoskarn intersected in TRDD014W1, coupled with returned mineral tenor in
TRDD022, TRDD014 and TRDD001 (21.1m @ 0.25 g/t gold and 0.03% copper to EOH),
provides indicators of a proximal environment to the targeted core of an intrusive porphyry
system.
The multiple intrusive deposits at the neighbouring Northparkes mine and at Cadia-Ridgeway
exhibit such a setting around discrete mineralized cores of only hundreds of metres in width
that are vertically extensive and occur in clusters or a series of deposits. See Figure 4 for an
example of the working alteration, geological model and target zone of the Trundle Park
prospect relative to the E48 deposit at Northparkes.
A follow up hole (TRDD028) has commenced to the west of and parallel to TRDD014W1, and
south of TRDD022 to further test the identified mineralized corridor and targeted core of the
system (see Figures 3 and 4). The direction south from TRDD014/W1 and TRDD028 remains
open for future drill testing.
Porphyry system further extended at Trundle Park
Website: www.kincoracopper.com
5
Email: enquiries@kincoracopper.com
Figure 4: The clusters of deposits at the neighbouring Northparkes mine and at CadiaRidgeway exhibit multiple intrusive systems and an alteration, lithology and mineralised
setting not dissimilar to the Trundle Park prospect around discrete mineralized cores of
only hundreds of metres width that are vertically extensive
E48 at Northparkes - alteration and mineralization 1
Trundle Park – working interpretation of alteration and mineralization
(looking NNE)
Grade shells
0.5% copper
Grade shells
0.2g/t gold
Designed
TRDD028
starts
~190m S
off section
to finish
on section
TRDD026 drilled
~125m NNW off
section (~100m
TRDD026 drilled NNW
from
~100m
offTRDD022)
section
0.5% copper
Alteration zones
0.2g/t gold
Skarn
Alteration zones
Skarn Post mineral cover
TRDD014E targeted
SSE ~60m forward of
section
Sodic cover
Post mineral
Sodic Outer propylitic
Outer propylitic
Potassic
Kincora Sericite
Target
Sericite
Fault
200m
46m
46
m @@0.0.54g/t
54g/t
AAu,
u, 0.0.08%
08% CCu
u
Fault
Quartz monzonite
Quartz monzonite
porphyry
porphyry
Volcanics
0
TRDD014W1
finished
on the
section
line
TTRDD022
RDD022 1162m
62m @@
00.24g/t
.24g/t AAu,
u, 00.04%
.04% CCu
u
Inner propylitic
Inner propylitic
Potassic
TRDD014
ended
~200m
S off
section
18m
18
m @@0.0.75g/t
75g/t
AAu,
u, 0.0.09%
09% CCu
u
Granite Granite
Pluton Pluton
00
200m
200m
Volcanics
Volcanics
1 Pacey A 2016 “The characteristics, geochemistry & origin of propylitic alteration in the Northparkes porphyry Cu-Au system”. Pervasive fault/fracture controlled sericitic alteration often occurs in the centre of Northparkes/
Goonumbla district mineralised systems and extends to depth - See October 2021, press release “Porphyry system further extended at Trundle Park“ for further details and disclaimers including JORC/NI 43-101 tables.
Figure 5: Illustration the rocks and alteration in and around the core of the intrusive
systems and deposits at Northparkes
Alteration
Source: “Propylitic alteration and element mobility: The Northparkes Cu-Au System”, Adam Pacey, JJ
Wilkinson, AJ Boyce & DR Cooke - 2017
6
Porphyry system further extended at Trundle Park
Website: www.kincoracopper.com
6
Email: enquiries@kincoracopper.com
Figure 6: Examples of the rock types in hole TRDD014W1 at the Trundle Park prospect
(a) Monzonite vein-dyke system intruding a larger monzodiorite intrusion with zones of interpreted
variable to strongly developed outer potassic alteration.
Monzodiorite
Quartz Monzonite
631.02-634.4m
Quartz Monzonite
Monzodiorite
738.2-741.4m
Insertof
ofcut
cutcore
core
Insert
Monzodiorite
821-824m
Quartz Monzonite
TRDD014W1 has returned larger interpreted zones of “red” monzonite and monzodiorite intrusions than TRDD022. Monzodiorite
(albite altered) occurred from 499-849.5m. Some examples with red quartz monzonite fingers are shown.
639.5-643.8m
Insert of albite-chlorite altered volcaniclastic breccia cross-cut by pyrite-chlorite veinlets with K-feldspar selvedge (at 639.5m
downhole)
Porphyry system further extended at Trundle Park
Website: www.kincoracopper.com
7
Email: enquiries@kincoracopper.com
Q-mt-py-cp
Monzodiorite
665m
Quartz
Monzonite
Grey monzodiorite (crowded) with albite alteration cut by red quartz monzodiorite vein dykes containing examples with clots and
veinlets with quartz (Q) +/- magnetite (mt) +/-pyrite (py) +/- chalcopyrite (cpy) (at 665m downhole).
(2)
(3)
(1)
797m
Monzodiorite
Monzodiorite (crowded) with albite alteration and hematite dusting cut by vein sets comprising: (1) early quartz-magnetite, then
(2) kfeldspar (orange-red)-pyrite and (3) later quartz-pyrite (at 797m downhole).
(b) Endoskarn filling voids in a monzodiorite host rock, comprising massive brown garnet (gn) and
magnetite (mt), cut by later white carbonate (cb) and lime-green epidote (ep) veinlets (at 704.5m
downhole).
mt
gn
704.5m
ep
cb
(c) The Tullamore thrust fault was intersected in close proximity to the forecast depth at 849.5m and
followed by a preserved slice of a sheared volcanoclastic sequence +/- pyrite intersected from 856876.65m (end of hole) (at 867.1-869.3m downhole).
Insert volcaniclastic sandstone intensely cross-cut by foliated carbonate-pyrite-hematite
867.1-869.3m
Porphyry system further extended at Trundle Park
Website: www.kincoracopper.com
8
Email: enquiries@kincoracopper.com
(d) TRDD014W1 has intersected multiple skarn horizons
py
cpy
cpy
hm
hm
cb
306.7m
TRDD014W1
py 307m
Upper skarn zone example with brecciated volcanoclastic sandstone host rock (dark grey) and a matrix fill of carbonate (cb) +/hematite (hm) +/- pyrite (py) +/- chalcopyrite (cpy) (at 306.7m downhole).
py
mt
cpy
387.7m
Upper skarn zone example with predominantly a matrix fill of early magnetite (mt) and pyroxene (dark green; px), in turn
overprinted by a later matrix fill of K-feldspar (orange: kfs) +/- carbonate (cb) +/- pyrite (py) +/- chalcopyrite (cpy) (at 387.7m
downhole).
gn
py
482.1m
ep
cb
Lower skarn zone example with massive pink-tan garnet (gn) skarn with minor voids containing prehnite (pale-light blue) +/carbonate (cb) +/- epidote (ep) +/- pyrite (py).(at 482.1m downhole).
Photos of selected intervals which are not representative of the mineralization hosted on the whole property or
Trundle Park prospect but are of the alteration and lithology’s intersected in the mineralized zones in these
sections of drill holes TRDD014W1, and current working geological interpretation presented in Figure 3. There
is insufficient drilling data to date to demonstrate continuity of mineralized domains and determine the
relationship between mineralization widths and intercept lengths. True widths are not known.
Porphyry system further extended at Trundle Park
Website: www.kincoracopper.com
9
Email: enquiries@kincoracopper.com
Trundle Project background
The Trundle Project includes one single license covering 167km2 and was secured by Kincora in the March 2020 agreement with
RareX Limited (“REE” on the ASX). Kincora is the operator, holds a 65% interest in the Trundle Project and is the sole funder until
a positive scoping study is delivered at which time a fund or dilute joint venture will be formed.
This announcement has been authorised for release by the Board of Kincora Copper Limited (ARBN 645 457 763)
For further information please contact:
Sam Spring, President and Chief Executive Officer
sam.spring@kincoracopper.com or +61431 329 345
For media enquiries:
Media & Capital Partners
Angela East at Angela.East@mcpartners.com.au
Executive and registered office
Subsidiary office Australia
400 – 837 West Hastings Street
Leydin Freyer Corp Pty Ltd
Vancouver, BC V6C 3N6, Canada
Level 4, 100 Albert Road
Tel: 1.604.283.1722
South Melbourne, Victoria 3205
Fax: 1.888.241.5996
Forward-Looking Statements
Certain information regarding Kincora contained herein may constitute forward-looking statements within the meaning of
applicable securities laws. Forward-looking statements may include estimates, plans, expectations, opinions, forecasts, projections,
guidance or other statements that are not statements of fact. Although Kincora believes that the expectations reflected in such
forward-looking statements are reasonable, it can give no assurance that such expectations will prove to have been correct. Kincora
cautions that actual performance will be affected by a number of factors, most of which are beyond its control, and that future
events and results may vary substantially from what Kincora currently foresees. Factors that could cause actual results to differ
materially from those in forward-looking statements include market prices, exploitation and exploration results, continued
availability of capital and financing and general economic, market or business conditions. The forward-looking statements are
expressly qualified in their entirety by this cautionary statement. The information contained herein is stated as of the current date
and is subject to change after that date. Kincora does not assume the obligation to revise or update these forward-looking
statements, except as may be required under applicable securities laws.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of
the TSX Venture Exchange) or the Australian Securities Exchange accepts responsibility for the adequacy or
accuracy of this release.
Porphyry system further extended at Trundle Park
Website: www.kincoracopper.com
10
Email: enquiries@kincoracopper.com
Table 1: Trundle project - Collar Information
Target
Hole#
Length (m)
Dip (°)
Azimuth (°)
RL
Easting (MGA)
Trundle Park
TRDD001
685
60
262
270
570049
6352082
95.90%
Yes
1
Mordialloc
TRDD002
790
60
101
271
568443
6360363
98.20%
Yes
2
Bayleys
TRDD003
721
60
329
274
569230
6360641
99.50%
Yes
3
Trundle Park
TRDD004
694
55
264
271
569780
6352079
99.60%
Yes
3
Mordialloc
TRDD005
958
60
110
266
568439
6360204
97.30%
Yes
3
Mordialloc
TRDD006
962
70
275
267
568599
6360206
98.90%
Yes
4
Trundle Park
TRDD007
521
60
264
268
570012
6352230
84.40%
Yes
6,7
Trundle Park
TRDD008
490
60
264
272
569920
6351962
97.10%
Yes
4,5
Trundle Park
TRDD009
445
60
310
267
569611
6352378
99.20%
Yes
6
Trundle Park
TRDD010
643
60
330
272
569963
6351919
96.40%
Yes
6
Trundle Park
TRDD011
332
55
330
270
570035
6352041
94.80%
Yes
5
Trundle Park
TRDD012
581
55
330
270
570062
6351997
85.60%
Yes
5
Trundle Park
TRDD013
402
60
330
272
570012
6351827
94.60%
Yes
6
Trundle Park
TRDD014
670
65
330
275
569833
6351808
97.40%
Yes
7
Trundle Park
TRDD015
550
60
330
270
570088
6351952
98.10%
Yes
7
Trundle Park
TRDD016
496
60
330
268
570029
6352250
89.40%
Yes
7
Trundle Park
TRDD017
691
55
150
272
569684
6352060
98.73%
Yes
8
Trundle Park
TRDD018
484
55
330
268
570136
6352352
97.40%
Yes
8
Mordialloc
TRDD019
943
75
320
262
568697
6360065
100.0%
Yes
8
Mordialloc
TRDD020
718
60
140
273
568227
6360865
99.80%
Yes
8
Mordialloc
TRDD021
736
60
140
274
568419
6360647
99.21%
Yes
9
Trundle Park
TRDD022
940
55
274
269
570073
6352099
88.07%
Yes
9
Trundle Park
TRDD023
307
60
320
269
570085
6352076
91.30%
Mordialloc NE
TRDD024
571
70
280
285
569846
6361939
96.65%
Mordialloc SW
TRDD025
397
60
70
259
567718
6359613
94.95%
Trundle Park
TRDD026
843
60
85
271
569305
6352232
98.15%
Trundle Park
TRDD014W1
577 (EOH 877)
55
338
275
569833
6351808
98.70%
Trundle Park
TRDD027
319
60
250
274
568915
6352255
92.30%
Trundle Park
TRDD028
ongoing
75
340
274
569633
6351935
Metres drilled
Northing (MGA) Core recovery Assay results Press release
17,466
For further details, including QAQC procedures, please refer to the following press releases:
1.
July 6, 2020 - Kincora announces high-grade gold-copper results from first hole at Trundle
2.
July 23, 2020 - Kincora reports further strong encouragement at Trundle
3.
September 3, 2020 - Kincora provides update on expanded drilling program at Trundle
4.
November 30, 2020 - Kincora intersects broad mineralized zones at Trundle
5.
January 20, 2021 - Kincora intersects further shallow mineralization at Trundle
6.
March 2021 - Independent Technical Report for the ASX prospectus
7.
April 22, 2021 - Exploration Update
8.
July 8, 2021 - Exploration portfolio drilling update
9.
August 17 2021 - Significant gold-bearing intervals at Trundle Park
10.
September 23, 2021 - Porphyry system extended at Trundle Park
Porphyry system further extended at Trundle Park
Website: www.kincoracopper.com
11
Email: enquiries@kincoracopper.com
Drilling, Assaying, Logging and QA/QC Procedures
Sampling and QA/QC procedures are carried out by Kincora Copper Limited, and its contractors, using the Company’s protocols as
per industry best practise.
All samples have been assayed at ALS Minerals Laboratories, delivered to Orange, NSW, Australia. In addition to internal checks by
ALS, the Company incorporates a QA/QC sample protocol utilizing prepared standards and blanks for 5% of all assayed samples.
Diamond drilling was undertaken by DrillIt Consulting Pty Ltd, from Parkes, under the supervision of our field geologists. All drill
core was logged to best industry standard by well-trained geologists and Kincora’s drill core sampling protocol consisted a
collection of samples over all of the logged core.
Sample interval selection was based on geological controls or mineralization or metre intervals, and/or guidance from the Technical
Committee provided subsequent to daily drill and logging reports. Sample intervals are cut by the Company and delivered by the
Company direct to ALS.
All reported assay results are performed by ALS and widths reported are drill core lengths. There is insufficient drilling data to date
to demonstrate continuity of mineralized domains and determine the relationship between mineralization widths and intercept
lengths.
True widths are not known at this stage.
Significant mineralised intervals for drilling at the Trundle project are reported based upon two different cut off grade criteria:
•
Interpreted near surface skarn gold and copper intercepts are calculated using a lower cut of 0.20g/t and 0.10%
respectively; and,
•
Porphyry intrusion system gold and copper intercepts are calculated using a lower cut of 0.10g/t and 0.05% respectively.
Significant mineralised intervals are reported with dilution on the basis of:
•
Internal dilution is below the aforementioned respective cut off’s; and,
•
Dilutions related with core loss as flagged by a “*”.
The following assay techniques have been adopted for drilling at the Trundle project:
o
Gold: Au-AA24 (Fire assay), reported.
o
Multiple elements: ME-ICP61 (4 acid digestion with ICP-AES analysis for 33 elements) and ME-MS61 (4 acid digestion
with ICP-AES & ICP-MS analysis for 48 elements), the latter report for TRDD001 and former reported for holes
TRDD002-TRDD022.
Copper oxides and selected intervals with native copper: ME-ICP44 (Aqua regia digestion with ICP-AES analysis) has
been assayed, but not reported.
o
o
Assay results >10g/t gold and/or 1% copper are re-assayed.
Qualified Person
The scientific and technical information in this news release was prepared in accordance with the standards of the Canadian
Institute of Mining, Metallurgy and Petroleum and National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI
43-101”) and was reviewed, verified and compiled by Kincora’s geological staff under the supervision of Paul Cromie (BSc Hons.
M.Sc. Economic Geology, PhD, member of the Australian Institute of Mining and Metallurgy and Society of Economic Geologists),
Exploration Manager Australia, who is the Qualified Persons for the purpose of NI 43-101.
JORC Competent Person Statement
Information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves has been reviewed and approved
by Mr. Paul Cromie, a Qualified Person under the definition established by JORC and have sufficient experience which is relevant
to the style of mineralization and type of deposit under consideration and to the activity being undertaking to qualify as a
Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves’.
Paul Cromie (BSc Hons. M.Sc. Economic Geology, PhD, member of the Australian Institute of Mining and Metallurgy and Society
of Economic Geologists), is Exploration Manager Australia for the Company.
Mr. Paul Cromie consents to the inclusion in this report of the matters based on his information in the form and context in which it
appears.
The review and verification process for the information disclosed herein for the Trundle, Fairholme and Nyngan projects have
included the receipt of all material exploration data, results and sampling procedures of previous operators and review of such
information by Kincora’s geological staff using standard verification procedures.
Porphyry system further extended at Trundle Park
Website: www.kincoracopper.com
12
Email: enquiries@kincoracopper.com
JORC TABLE 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections).
Criteria
Sampling
techniques
JORC Code explanation
•
•
•
•
Drilling
techniques
Drill sample
recovery
•
•
•
•
Commentary
Nature and quality of sampling (e.g.
cut channels, random chips, or
specific specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or
handheld XRF instruments, etc.).
These examples should not be taken as
limiting the broad meaning of
sampling.
Include reference to measures taken
to ensure sample representivity and
the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of
mineralisation that are Material to
the Public Report.
In cases where ‘industry standard’
work has been done this would be
relatively simple (e.g. ‘reverse
circulation drilling was used to obtain
1 m samples from which 3 kg was
pulverised to produce a 30 g charge
for fire assay’). In other cases more
explanation may be required, such as
where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types
(eg submarine nodules) may warrant
disclosure of detailed information
•
Drill type (e.g. core, reverse
circulation, open-hole hammer,
rotary air blast, auger, Bangka,
sonic, etc) and details (e.g. core
diameter, triple or standard tube,
depth of diamond tails, face-sampling
bit or other type, whether core is
oriented and if so, by what method,
etc.).
•
Method of recording and assessing
core and chip sample recoveries and
results assessed.
Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain
of fine/coarse material.
•
•
•
•
•
•
•
•
•
•
•
•
•
Logging
•
•
Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or
Porphyry system further extended at Trundle Park
Website: www.kincoracopper.com
•
•
Kincora Copper Limited is the operator of the
Trundle Project, with drilling using diamond coring
methods by DrillIt Consulting Pty Ltd, from which
sub-samples were taken over 2 m intervals and
pulverised to produce suitable aliquots for fire assay
and ICP-MS.
Diamond drilling was used to obtain orientated
samples from the ground, which was then
structurally, geotechnically and geologically logged.
Sample interval selection was based on geological
co
Share your feedback
Discover