SIGNIFICANT PORPHYRY MINERALISATION IN 2ND HOLE AT TRUNDLE
Released
Released
Announcement PDF
ASX / MEDIA ANNOUNCEMENT
10 June 2020
SIGNIFICANT PORPHYRY MINERALISATION IN SECOND
DIAMOND DRILL HOLE AT TRUNDLE
HIGHLIGHTS
•
Second hole at the Trundle Project, at the Mordialloc target, has intersected strong halo
indicators of a mineralized porphyry intrusion system confirming the targeted
geological setting. These indicators include significant intervals with visually
interpreted localized moderate copper grades and inner propylitic zone alteration.
•
The first two drill holes at both the Mordialloc porphyry and Trundle Park skarnporphyry targets have significantly expanded the scale and prospectivity of these target
zones.
•
The Mordialloc and Trundle Park targets are located 8.5km apart and interpreted to lie
within the same mineralized complex as Australia’s second largest porphyry mine at
Northparkes, further illustrating the scale and potential for mineralized systems at the
Trundle Project.
•
The third of the six-hole program is in progress, testing the Bayleys porphyry target.
Figure 1: Significant porphyry intrusion system intervals at the Trundle Project in Kincora’s first hole testing
the Mordialloc target : Hole TRDD002 has returned intervals with visually interpreted localized moderate
copper grades and inner propylitic zone alteration
RareX Limited
Suite 23, 513 Hay Street, Subiaco WA 6008 Ph: 08 6143 6720 ACN: 105 578 756
Kincora Copper Ltd. (Kincora) (TSXV: KCC) has advised RareX Limited (RareX or the Company) (ASX:
REE) that the second diamond drill hole (TRDD002) of the maiden drilling program at the Trundle
Project (RareX 35% free carried, Kincora 65%), within the Mordialloc target, has been completed at
790 metres depth.
Hole TRDD002 has intersected significant intrusion hosted intervals with the targeted geological
setting of a high-level, preserved porphyry system confirmed. The Mordialloc porphyry target is
located approximately 8.5 km north of TRDD001 drilled at the Trundle Park skarn-porphyry target
(visual results announced May 19th, 2020).
John Holliday, Chairman of Kincora’s Technical Committee, and Peter Leaman, Senior Vice-President
of Exploration, commented:
“While caution must be held without assay results the visual results of the second hole at the
Mordialloc target are very encouraging.
The scale of the mineralised systems and our geological concepts has been confirmed in the first two
holes of this drilling program at two targets 8.5km apart. Historically at Trundle over 60,000 metres
have been drilled, but over 92% of these holes have been within the top 50 metres to surface, a depth
that the existing major mines in this belt suggest is just too shallow.
Kincora’s initial two deeper holes have returned the most significant skarn intervals and porphyry
intrusion system intervals to date at the Trundle project. More drilling is now required to vector
towards the potential cores of the respective targeted systems. We are very excited by the drilled
indications so far.”
Hole TRDD002 was drilled to 790 metres, relative to a planned 700 metres, testing laterally eastward
from previous explorer drilling which had returned metal grades comparable to the peripheral parts
of the Northparkes deposits, with improving grades down hole, open and coincident with an untested
deeper geophysical target. Kincora’s deeper exploration strategy is similar to that applied in the
discovery of Alkane Resources’ Boda deposit, and the other major porphyry deposits in the NSW
Lachlan Fold Belt (Northparkes, Cadia and Cowal).
Further drilling as part of Kincora’s maiden and ongoing six-hole program at the Trundle Project is
proposed to follow up the initial positive drill results at the Trundle Park and Mordialloc targets, with
the drilling rig currently testing the Bayleys porphyry target (TRDD003), located approximately 1km
north-east of the Mordialloc target, and then moving back to Trundle Park.
2
Figure 2: Targeted geological setting of high-level, preserved porphyry system confirmed, analogous to
Cadia, Northparkes and Boda
Hole TRDD002 has returned better widths, alteration and interpreted mineralization than previous drilling at
the Trundle copper-gold porphyry project - preliminary review section
The Trundle Project
The Trundle Project is located 30km west of the China Molybdenum Company Limited (CMOC)
operated Northparkes copper-gold project, in the same Northparkes Igneous Complex.
Past explorer drilling has been extensive with the completion of 2208 holes for 61,146 metres but
deeper drilling into the basement utilising modern exploration knowledge has been very limited.
Over 92% of prior drilling has been to less than 50 metres depth with just 11 holes beyond 300 metres
(0.5% of holes drilled). Existing significant drill intersections supports vectoring to very compelling
targets for Kincora’s ongoing phase 1 drilling program at three existing mineralised systems – Trundle
Park, Mordiallic and Bayleys. These systems have not been drilled since industry leading Induced
Polarisation survey's, including HPX’s proprietary Typhoon system, and magnetic modelling were
completed.
Collar Table
Hole ID
TRDD002
Easting
(MGA)
568443
Northing
(MGA)
6360362
RL (m)
Dip
271
-60
Azimuth
(MGA)
90
Total
Depth (m)
790.25
Comments
Completed
This announcement has been authorized for release by the Board of RareX Limited.
For further information, please contact:
RareX Limited
Jeremy Robinson
Executive Director
Ph: 08 6143 6720
Media Enquiries
Nicholas Read
Read Corporate
Ph: 08 9388 1474
3
Competent Person’s Statement
Information in this release that relates to current Exploration Results is based on and fairly represents
information and supporting documentation prepared and compiled by Mr Guy Moulang, an
experienced geologist consulting for RareX Limited. Mr Moulang is a Member of the Australian
Institute of Geoscientist and has sufficient experience which is relevant to the styles of mineralisation
and types of deposits under consideration and to the activities being undertaken to qualify as a
Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves”. Mr Moulang consents to the inclusion in
this release of the matters based on his information in the form and context in which it appears.
4
Appendix 1: JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
Criteria
JORC Code Explanation
Sampling
techniques
Nature and quality of sampling (eg cut channels, random chips, or specific specialised industry standard measurement tools
appropriate to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc). These
examples should not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement tools
or systems used.
Aspects of the determination of mineralisation that are Material to the Public Report. In cases where ‘industry standard’ work
has been done this would be relatively simple (eg ‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for fire assay’). In other cases more explanation may be required, such as where there is
coarse gold that has inherent sampling problems. Unusual commodities or
mineralisation types (eg submarine nodules) may warrant disclosure of detailed information.
Drill type (eg core, reverse circulation, open- hole hammer, rotary air blast, auger, Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of diamond tails, face-sampling bit or other type, whether core is oriented and if so, by
what method, etc).
Not reporting on assaying or sampling –
not required
Method of recording and assessing core and chip sample recoveries and results assessed.
Measures taken to maximise sample recovery and ensure representative nature of the samples.
Whether a relationship exists between sample recovery and grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
Whether core and chip samples have been geologically and geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc) photography.
The total length and percentage of the relevant intersections logged.
Not reporting on assaying or sampling –
not required
If core, whether cut or sawn and whether quarter, half or all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the in situ material collected, including for instance results for
field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material being sampled.
Not reporting on assaying or sampling –
not required
Drilling
Techniques
Drill
Sample
Recovery
Logging
Subsampling
techniques
and sample
preparation
Diamond Drilling (DD) completed using
PQ diameter 0.0-29.95m; HQ3 29.95152.95; NQ2 152.95-790.25m
Systematic geological and geotechnical
logging was undertaken Kincora
geologists and consultants
5
Quality of
assay data
and
laboratory
tests
The nature, quality and appropriateness of the assaying and laboratory procedures used and whether the technique is considered
partial or total
For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in determining the analysis including
instrument make and model, reading times, calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (eg standards, blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (ie lack of bias) and precision have been established.
Not reporting on assaying or sampling –
not required
Verification
of sampling
and
assaying
The verification of significant intersections by either independent or alternative company personnel.
The use of twinned holes.
The verification of significant intersections by either independent or alternative company personnel.
Discuss any adjustment to assay data.
Not reporting on assaying or sampling –
not required
Location of
data points
Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys), trenches, mine workings and other
locations used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Data
spacing and
distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish the degree of geological and grade continuity appropriate for
the Mineral Resource and Ore Reserve estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
Orientation
of data in
relation to
geological
structure
Whether the orientation of sampling achieves unbiased sampling of possible structures and the extent to which this is known,
considering the deposit type.
Drill hole collars were located by
handheld GPS.
Coordinates are in GDA94, Zone 55H
Topographic control is maintained by the
use of widely available government data
sets. Ground is gently undulating.
Drill holes are preferentially located in
prospective areas
The mineralised areas are yet to
demonstrate sufficient grade or
continuity to support the definition of a
Minerals Resources per the JORC 2012
code
The angled drill holes were directed as
best possible across the known
lithological and interpreted mineralized
structures
Sample
security
If the relationship between the drilling orientation and the orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and reported if material.
The measures taken to ensure sample security
Mineralisation identified by Kincora
Copper Geologists and consultants
Core is handled by Kincora Copper
6
Section 2 Reporting of Exploration Results
Criteria
JORC Code Explanation
Mineral
tenement and
land tenure
status
Type, reference name/number, location and ownership including agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests, historical sites, wilderness or national park and
environmental settings.
Exploration
done by other
parties
Acknowledgment and appraisal of exploration by other parties.
Exploration has been conducted by
multiple previous explorer include
Newcrest Mining, HPX and Clancy
Exploration
Geology
Deposit type, geological setting and style of mineralisation.
As per body of announcement
Drill hole
information
A summary of all information material to the understanding of the exploration results including a tabulation of the following
information for all Material drill holes:
As per body of announcement
The security of the tenure held at the time of reporting along with any known impediments to obtaining a licence to operate in
the area.
The trundle Project is located on EL8222
in which RareX has 35% free carried in a
JV with Kincora Copper until prefeasibility study is completed.
easting and northing of the drill hole collar
elevation or RL (Reduced Level – elevation above sea level in metres) of the drill hole collar
dip and azimuth of the hole
down hole length and interception depth
hole length.
If the exclusion of this information is justified on the basis that the information is not Material and this exclusion does not
detract from the understanding of the report, the Competent Person should clearly explain why this is the case.
Data
aggregation
methods
In reporting Exploration Results, weighting averaging techniques, maximum and/or minimum grade truncations (eg cutting of
high grades) and cut-off grades are usually Material and should be stated.
Not reporting on assaying or sampling –
not required
7
Where aggregate intercepts incorporate short lengths of high grade results and longer lengths of low grade results, the
procedure used for such aggregation should be stated and some typical examples of such aggregations should be shown in
detail.
The assumptions used for any reporting of metal equivalent values should be clearly stated.
Relationship
between
mineralisation
widths and
intercept
lengths
These relationships are particularly important in the reporting of Exploration Results
Diagrams
Appropriate maps and sections (with scales) and tabulations of intercepts should be included for any significant discovery
being reported These should include, but not be limited to a plan view of drill hole collar locations and appropriate sectional
views.
Maps and diagrams are included in the
body of the announcement
Balanced
reporting
Where comprehensive reporting of all Exploration Results is not practicable, representative reporting of both low and high
grades and/or widths should be practiced to avoid misleading reporting of Exploration Results.
Reporting is considered balanced
Other
substantive
exploration
data
Other exploration data, if meaningful and material, should be reported including (but not limited to): geological observations;
geophysical survey results; geochemical survey results; bulk samples – size and method of treatment; metallurgical test results;
bulk density, groundwater, geotechnical and rock characteristics; potential deleterious or contaminating substances.
Nothing further
Further work
The nature and scale of planned further work (eg tests for lateral extensions or large scale step out drilling.
Exploration is ongoing . Exploration
activities are to be undertaken by
Kincora Copper, the Company's joint
venture partner. The results the subject
of this announcement is the second of
three targets of the ongoing drilling
program.
If the geometry of the mineralisation with respect to the drill hole angle is known, its nature should be reported.
Not reporting on assaying or sampling –
not required
If it is not known and only the down hole lengths are reported, there should be a clear statement to this effect (eg ‘down hole
length, true width not known’).
Diagrams clearly highlighting the areas of possible extensions, including the main geological interpretations and future drilling
areas, provided this information is not commercially sensitive.
8
Share your feedback
Discover