MULTIPLE HIGH-GRADE ZONES INTERSECTED IN BESTEVER DIAMOND HOLE AT CUMMINS RANGE
Wide zones of high-grade mineralisation in primary zone extend mineralisation at depth and
provide confidence to calculate an Exploration Target
HIGHLIGHTS
•
Exceptional assay results received for diamond hole CDX0016, targeting the north-western
extension of the primary rare earths zone down-dip.
•
The hole intersected a cumulative total of 51m at 2.5% TREO, comprised of four high-grade zones
of:
o
21.2m at 1.8% TREO from 134.3m
o
7.3m at 3.5% TREO from 174m
o
2.2m at 6.8% TREO from 247.3m
o
13.8m at 2.7% TREO from 273m.
•
Primary mineralisation now extended to 240m below surface.
•
Result gives RareX the geological confidence to establish an Exploration Target for the primary zone.
•
Preliminary mineralogy on primary ore confirms relatively coarse massive monazite as the rare
earths host.
RareX Limited (ASX: REE; RareX or the Company) is pleased to report assay results from the best primary
diamond hole drilled at its 100%-owned Cummins Range Rare Earths Project in Western Australia.
Assay results for the diamond portion of holes CDX0015 and CDX0016 have been received. CDX0015 was
drilled into the northern zone and intersected wide low-grade rare earths within a phoscorite unit. The
impressive results for CDX0015 are discussed in a separate announcement released to market today
(“Significant high-grade primary phosphate discovery at Cummins Range”).
CDX0016 was designed to target the north-western extension of the primary zone and has intersected
multiple zones of high-grade rare earths in monazite mineralisation.
The cumulative total of all the significant intercepts is 51m at 2.5% TREO, comprising four high-grade zones
of 21.3m at 1.8% TREO including 13m @ 2.6% TREO, 7.3m at 3.5% TREO, 2.2m at 6.8% TREO and 13.8m at
2.7% TREO. These drill intercepts are shown in Figure 1.
The deepest zone in hole CDX0016, 13.8m at 2.7% TREO from 273m down-hole, is 230m below surface,
and the visual monazite estimates from CDX0018 (assays not received), located 200m along strike, are
particularly impressive.
These deepest intercepts show that rare earths mineralisation continues to persist at depth and produce
high grades over large widths. This represents RareX’s best diamond drill hole to date and, coupled with
the results that have previously been reported from the primary zone, shows that Cummins Range is truly
large system capable of delivering significant tonnes at very good grade.
RareX Limited
Unit 6, 94 Rokeby Road, Subiaco WA 6008 Ph: 08 6383 6593 ACN: 105 578 756
1
Photo 1: Zones of coarse massive monazite in hole CDX0016
These results give RareX confidence in the robustness of the mineralisation and will allow it to calculate an
Exploration Target for the primary zone in the coming weeks.
This Exploration Target will be in addition to the current Mineral Resource of 18.8Mt at 1.15% TREO + 0.14%
Nb2O5 (Indicated Resource of 11.1Mt at 1.32% TREO + 0.17% Nb2O5; Inferred Resource of 7.7Mt at 0.88%
TREO + 0.11% Nb2O5).
RareX Managing Director, Jeremy Robinson, said: “This is without doubt a breakthrough result for RareX
and the Cummins Range Project. In addition to being our best-ever hole on a value basis, this hole is
strategically important as it confirms that the high-grade primary zone continues to a significant depth.
“In conjunction with the visual estimates from hole CDX0018, located 200m along strike from CDX0016, we
now have sufficient data to calculate an Exploration Target for the primary zone, which we hope to publish
in the near future.
“This Exploration Target will be in addition to the already substantial JORC Mineral Resource announced
last year and will provide investors with some real insights into the significant upside that we see at this
Project. If we are able to convert a significant proportion of this Exploration Target into JORC resources, it
will rapidly elevate Cummins Range as one of the largest carbonatite-hosted rare earth deposits in Australia.
We are looking forward to unlocking this potential with our planned exploration programs this year.”
RareX is now preparing to re-commence exploration next month or early April.
RareX Limited
Unit 6, 94 Rokeby Road, Subiaco WA 6008 Ph: 08 6383 6593 ACN: 105 578 756
2
Figure 1. Cross Section showing drill hole CDX0016
RareX Limited
Unit 6, 94 Rokeby Road, Subiaco WA 6008 Ph: 08 6383 6593 ACN: 105 578 756
3
Figure 2. VLP showing Main Fault Intercepts, the 2021 resource, and an outline of 2021 drill extensions to the known mineralisation post 2021 resource.
The emergence of the lower zone in CDX0016 shows that there are likely many more blind lodes to be found with all lodes open down dip and even the lower
lode being open up-dip as shown in Figure 1.
RareX Limited
Unit 6, 94 Rokeby Road, Subiaco WA 6008 Ph: 08 6383 6593 ACN: 105 578 756
4
Figure 3. Drill plan showing drill traces, Section and VLP location.
This announcement has been authorized for release by the Board of RareX Limited.
For further information, please contact:
Jeremy Robinson
Managing Director
Ph: +61 8 6383 6593
RareX Limited
Unit 6, 94 Rokeby Road, Subiaco WA 6008 Ph: 08 6383 6593 ACN: 105 578 756
5
Competent Person’s Statements
Information in this release that relates to Exploration Results is based on and fairly represents information
and supporting documentation reviewed or compiled by Mr Guy Moulang, an experienced geologist
engaged by RareX Limited. Mr Moulang is a Member of the Australian Institute of Geoscientist and has
sufficient experience which is relevant to the styles of mineralisation and types of deposits under
consideration and to the activities being undertaken to qualify as a Competent Person as defined in the
2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves”. Mr Moulang consents to the inclusion in this release of the matters based on his information in
the form and context in which it appears.
The mineral resource estimate in this announcement were reported by the Company in accordance with
listing rule 5.8 on 19 July 2021. The Company confirms it is not aware of any new information or data that
materially affects the information included in the previous announcement and that all material
assumptions and technical parameters underpinning the estimates in the previous announcement continue
to apply and have not materially changed.
RareX Limited
Unit 6, 94 Rokeby Road, Subiaco WA 6008 Ph: 08 6383 6593 ACN: 105 578 756
6
Appendix 1: Table of Significant Intercepts (cut-off grade of 0.5%)
Mineralised
Zone
Hole ID
From
(m)
To
(m)
Interval
(m)
TREO
%
NZ
NZ
NPZ
NZ
NZ
NZ
NZ
NZ
NZ
NZ
NZ
MF
MF
MF
MF
NZ
NZ
MF
MF
NZ
NZ
NZ
NZ
NZ
NZ
NZ
NZ
NZ
NZ
NZ
NZ
CDX0015
CDX0015
CDX0015
CDX0015
CDX0016
CDX0016
CDX0016
CDX0016
CDX0016
CDX0016
CDX0016
CDX0016
Including
Including
Including
CDX0016
CDX0016
CDX0016
Including
CDX0016
CDX0016
CDX0016
CDX0016
CDX0016
Including
CDX0016
CDX0016
Including
Including
Including
Including
97
106
116
180.1
88.4
99
103
109
112
120.09
127.16
134.32
138.01
144.72
148.52
160.98
163.5
174
178.16
211.03
226
230
241
247.32
248
257.1
273
273
274.37
281.63
285.43
98
108
142.6
181
89.2
100
104
110.2
112.98
121.09
127.62
155.55
151.04
145.35
151.04
166.5
164.5
181.34
181.34
212.12
227
231
242
249.5
248.68
258.13
286.81
275.44
275.44
286.81
286.81
1
2
26.6
0.9
0.8
1
1
1.2
0.98
1
0.46
21.23
13.03
0.63
2.52
5.52
1
7.34
3.18
1.09
1
1
1
2.18
0.68
1.03
13.81
2.44
1.07
5.18
1.38
0.51
0.53
0.52
0.53
1.26
0.54
0.59
0.6
1.88
2.27
0.77
1.75
2.62
17.02
5.89
0.88
2.38
3.48
6.89
0.72
0.91
0.61
0.66
6.79
10.49
4.28
2.7
5.44
11.87
4.38
9.35
% NdPr
of
TREO
29
29
26
19
16
17
18
22
16
17
18
17
16
15
16
16
16
19
19
19
15
16
19
17
17
17
16
16
15
16
16
NdPr
%
Nb2O5
%
P205
%
0.15
0.15
0.14
0.1
0.2
0.09
0.11
0.13
0.3
0.39
0.13
0.29
0.42
2.6
0.92
0.15
0.38
0.65
1.29
0.14
0.14
0.1
0.12
1.13
1.74
0.75
0.43
0.84
1.82
0.68
1.46
0.04
0.05
0.06
0.05
0.12
0.03
0.07
0.07
0.03
0.94
0.08
0.06
0.06
0.01
0.06
0.06
0.06
0.04
0.03
0.07
0.09
0.21
0.08
0.02
0
0.04
0.07
0.06
0.01
0.04
0.04
11
16
19
3
2
2
4
3
2
4
2
4
3
1
3
3
4
3
3
5
2
0
4
6
5
15
4
3
2
6
10
Mineralized Zone Key:
MF - Main Fault
NZ - Newly Discovered Zone
BZ - Breccia Zone
NPZ – Northern Phosphate Zone
TREO = Lanthanide Oxides + Yttrium Oxide + Scandium Oxide
RareX Limited
Unit 6, 94 Rokeby Road, Subiaco WA 6008 Ph: 08 6383 6593 ACN: 105 578 756
7
Appendix 2: Drill Collar Table
Hole ID
North
MGA
7866481
7866751
7866604
7866709
7866720
7866736
7866370
7866540
7866712
7866762
7866679
7866648
7866568
7866640
7866644
7866694
7866505
7866598
RLUTM
CRX0059
CRX0060
CRX0061
CRX0062
CRX0063
CRX0064
CRX0065
CRX0066
CRX0067
CRX0068
CRX0069
CRX0070
CWB3
CDX0001
CDX0002
CDX0003
CDX0004
CDX0005
East
MGA
307462
307139
306998
307223
307106
307399
307530
307348
307435
307430
307454
307477
307415
307286
307078
307192
307341
307140
Azimuth
Dip
Type
Assays
391
392
392
392
392
391
390
391
391
391
391
391
391
391
393
392
391
393
End
Depth
96
120
120
108
144
120
120
132
120
96
120
144
48
11.7
135.8
96.5
155.1
210.4
50
50
50
180
50
50
50
90
50
50
50
50
90
50
50
50
50
50
60
60
60
60
60
60
60
90
60
60
60
60
90
60
60
60
60
60
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
Diamond
Diamond
Diamond
Diamond
Diamond
7866531
7866498
7866469
393
393
393
215.8
198.8
218.4
50
50
50
60
60
60
Diamond
Diamond
Diamond
307325
307158
7866442
7866507
393
393
213.4
231.3
50
50
60
60
Diamond
Diamond
CDX0011
307072
7866691
393
227.3
50
60
Diamond
CDX0012
307037
7866666
393
210.9
50
60
Diamond
CDX0013
307047
7866717
393
204.8
50
60
Diamond
CDX0014
CDX0015
307015
307372
7866692
7866769
393
393
227.4
204.6
50
50
60
60
Diamond
Diamond
CDX0016
307007
7866637
393
298.1
50
60
Diamond
CDX0017
CDX0018
CDX0019
307079
307127
307305
7866651
7866482
7866530
393
391
392
215.3
333.9
219.6
50
50
50
60
60
60
Diamond
Diamond
Diamond
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Not Assayed
Received
Received
Received
RC Assays
Awaiting
Received
Received
RC Assays
Awaiting
Received
RC Assays
Awaiting
RC Assays
Awaiting
RC Assays
Awaiting
RC Assays
Awaiting
Awaiting
RC Assays
Awaiting
RC Assays
Awaiting
Awaiting
Awaiting
Awaiting
CDX0006
CDX0007
CDX0008
307191
307267
307237
CDX0009
CDX0010
RareX Limited
Unit 6, 94 Rokeby Road, Subiaco WA 6008 Ph: 08 6383 6593 ACN: 105 578 756
8
Appendix 3: JORC Code 2012 Edition – Table 1
Cummins Range Section 1 Sampling Techniques and Data
Criteria
JORC Code Explanation
Sampling
techniques
Nature and quality of sampling (eg cut channels, random chips, or specific specialised
industry standard measurement tools appropriate to the minerals under investigation,
such as down hole gamma sondes, or handheld XRF instruments, etc). These examples
should not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity and the appropriate
calibration of any measurement tools or systems used.
Aspects of the determination of mineralisation that are Material to the Public Report. In
cases where ‘industry standard’ work has been done this would be relatively simple (eg
‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised
to produce a 30 g charge for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling problems. Unusual
commodities
or
mineralisation types (eg submarine nodules) may warrant disclosure of detailed
information.
Drilling
Techniques
Drill type (eg core, reverse circulation, open- hole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (eg core diameter, triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is oriented and if so, by what method, etc).
Drill Sample
Recovery
Method of recording and assessing core and chip sample recoveries and results assessed.
Measures taken to maximise sample recovery and ensure representative nature of the
samples.
Whether a relationship exists between sample recovery and grade and whether sample
bias may have occurred due to preferential loss/gain of fine/coarse material.
Whether core and chip samples have been geologically and geotechnically logged to a level
of detail to support appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc)
photography.
The total length and percentage of the relevant intersections logged.
Logging
RareX Limited
Unit 6, 94 Rokeby Road, Subiaco WA 6008 Ph: 08 6383 6593 ACN: 105 578 756
•
•
•
•
•
•
•
•
•
•
•
•
•
•
The Cummins Range Rare Earth deposit is being drilled tested with RC drilling and
diamond drilling.
The RC drill rig used a 5 ½ inch diameter hammer. Each 1m bulk sample was
collected in a plastic bag.
Diamond drill sizes used are PQ, HQ and NQ2
Each metre was analysed with a portable XRF, and recovery and geology logs were
completed.
Sample interval selection was based on geological controls and mineralisation
Each 1m RC bulk sample was split with a riffle splitter to the appropriate size.
Samples varied in length from 1m to 4m.
Each core sample was cut in half with a brick saw. The half core sample was sent to
the laboratory with intervals ranging from 0.3m to 1.3m.
Samples were assayed for 42 elements using either a peroxide fusion with a ICPOES and ICP-MS finish, or a four acid digest with a ICP-OES and ICP-MS finish
Prefix CRX drill holes are reverse circulation (RC) drilling
Prefix CDX are diamond drilling. 11 of the diamond drill holes were started with an
RC precollar ranging from 40-90m depth. Holes were then continued with HQ3 or
NQ2 diamond core
5 diamond drill holes were drilled core from surface.
Recoveries for all drill holes were recorded for each metre. Recoveries for each
hole in this announcement are CDX0015 97%, CDX0016 100%
All metres drilled had a geology log completed. Geology logs were aided using
geochemical analysis from a portable XRF.
The detail of logging is appropriated for Mineral Resource estimation.
9
Subsampling
techniques
and sample
preparation
Quality of
assay data
and
laboratory
tests
Verification
of sampling
and
assaying
Location of
data points
If core, whether cut or sawn and whether quarter, half or all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or
dry.
For all sample types, the nature, quality and appropriateness of the sample preparation
technique.
Quality control procedures adopted for all sub-sampling stages to maximise representivity
of samples.
Measures taken to ensure that the sampling is representative of the in situ material
collected, including for instance results for field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material being sampled.
The nature, quality and appropriateness of the assaying and laboratory procedures used
and whether the technique is considered partial or total
For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used
in determining the analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (eg standards, blanks, duplicates, external
laboratory checks) and whether acceptable levels of accuracy (ie lack of bias) and precision
have been established.
The verification of significant intersections by either independent or alternative company
personnel.
The use of twinned holes.
The verification of significant intersections by either independent or alternative company
personnel.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys),
trenches, mine workings and other locations used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
•
•
•
Splits from the drill rig were not used. The entire 1m bulk sample was split with a
riffle splitter to the appropriate size. Samples varied in length from 1m to 4m.
This RC sampling technique is better than industry standards and is appropriate for
this style of mineralisation and for resource estimation.
Diamond core was cut in half with a brick saw and half the core was sent to the
laboratory. This is an appropriate method for this style of mineralization and for
resource estimation.
The reported assays were analysed by Nagrom. The following techniques were used:
•
•
•
•
•
•
•
•
•
•
•
28 elements were assayed for using peroxide fusion with a ICP-OES and ICP-MS
finish
14 elements were assayed for using four acid digest with a ICP-OES and ICP-MS
finish
In addition to internal checks by Nagrom, RareX incorporates a QA/QC sample
protocol utilizing prepared standards, blanks and duplicates for 8% of all assayed
samples.
Significant intercepts were calculated by RareX geological staff.
The intercepts have not been verified by independent persons
There are numerous drill holes with in the Cummins Range resource of comparable
tenure
All assay results are reported to RareX in parts per million (ppm). RareX geological
staff then convert the parts per million to ppm oxides using the below element to
stoichiometric oxide conversion factors. La2O3 1.1728, CeO2 1.2284, Pr6O11 1.2082,
Nd2O3 1.1664, Sm2O3 1.1596, Eu2O3 1.1579, Gd2O3 1.1526, Dy2O3 1.1477, Ho2O3
1.1455, Er2O3 1.1435, Tm2O3 1.1421, Yb2O3 1.1387, Lu2O3 1.1371, Sc2O3 1.5338,
Y2O3 1.2699, Nb2O5 1.4305, P2O5 2.2916
Drill hole collars were located by handheld GPS
All coordinates are in MGA Zone 52H 1994
Topographic control is maintained by the use of previously surveyed drill holes. The
Cummins Range deposit is located on flat terrain.
Down hole surveys were taken every 30m, using a digital Reflex multi shot camera.
Data spacing for reporting of Exploration Results.
RareX Limited
Unit 6, 94 Rokeby Road, Subiaco WA 6008 Ph: 08 6383 6593 ACN: 105 578 756
10
Data
spacing and
distribution
Whether the data spacing and distribution is sufficient to establish the degree of geological
and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
Whether sample compositing has been applied.
•
•
The purposed of the drill program is to test for primary mineralization below the
regolith. Drill spacing of 40m on 80m drill lines is appropriate to establish geological
and grade continuity.
2m to 4m RC composites were completed in areas where higher grades were not
expected
Orientation
of data in
relation to
geological
structure
Whether the orientation of sampling achieves unbiased sampling of possible structures
and the extent to which this is known, considering the deposit type.
If the relationship between the drilling orientation and the orientation of key mineralised
structures is considered to have introduced a sampling bias, this should be assessed and
reported if material.
•
The angled drill holes were directed as best as possible across the known geology.
Sample
security
The measures taken to ensure sample security
•
Drill samples are delivered to Halls Creek by RareX staff. Then the samples are
transported from Halls Creek to Perth via a reputable transport company.
Cummins Range Section 2 Reporting of Exploration Results
Criteria
JORC Code Explanation
Mineral
tenement and
land
tenure
status
Type, reference name/number, location and ownership including agreements or
material issues with third parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness or national park and
environmental settings.
The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.
Acknowledgment and appraisal of exploration by other parties.
•
The Cummins Range REO deposit is located on tenement E80/5092 and is 100%
owned by Cummins Range Pty Ltd which is a wholly owned subsidiary of RareX Ltd.
Cummins Range Pty Ltd has purchased the tenement from Element 25 with a
potential capped royalty payment of $1m should a positive PFS be completed
within 36 months of purchase finalisation.
•
Deposit type, geological setting and style of mineralisation.
•
CRA Exploration defined REO mineralisation at Cummins Range in 1978 using
predominantly aircore drilling. Navigator Resources progressed this discovery with
additional drilling after purchasing the tenement in 2006. Navigator announced a
resource estimate in 2008. Kimberly Rare Earths drilled additional holes and
upgraded the resource estimate in 2012.
The Cummins Range REO deposit occurs within the Cummins Range carbonatite
complex which is a 2.0 km diameter near-vertical diatreme pipe that has been
deeply weathered but essentially outcropping with only thin aeolian sand cover in
places. The diatreme pipe consists of various mafic to ultramafic rocks with later
carbonatite intrusions. The primary ultramafic and carbonatite rocks host low to
Exploration
done by other
parties
Geology
RareX Limited
Unit 6, 94 Rokeby Road, Subiaco WA 6008 Ph: 08 6383 6593 ACN: 105 578 756
11
Drill
hole
information
Data
aggregation
methods
A summary of all information material to the understanding of the exploration results
including a tabulation of the following information for all Material drill holes:
•
easting and northing of the drill hole collar
•
•
elevation or RL (Reduced Level – elevation above sea level in metres) of
the drill hole collar
dip and azimuth of the hole
•
down hole length and interception depth
•
hole length.
If the exclusion of this information is justified on the basis that the information is not
Material and this exclusion does not detract from the understanding of the report,
the Competent Person should clearly explain why this is the case.
In reporting Exploration Results, weighting averaging techniques, maximum and/or
minimum grade truncations (eg cutting of high grades) and cut-off grades are usually
Material and should be stated.
Where aggregate intercepts incorporate short lengths of high grade results and
longer lengths of low grade results, the procedure used for such aggregation should
be stated and some typical examples of such aggregations should be shown in detail.
The assumptions used for any reporting of metal equivalent values should be clearly
stated.
Relationship
between
mineralisation
These relationships are particularly important in the reporting of Exploration Results
If the geometry of the mineralisation with respect to the drill hole angle is known, its
nature should be reported.
RareX Limited
Unit 6, 94 Rokeby Road, Subiaco WA 6008 Ph: 08 6383 6593 ACN: 105 578 756
•
high grade rare earth elements with back ground levels of 1000-2000ppm TREO
and high grade zones up to 8% TREO. The current resource sits primarily within the
oxidised/weathered zone which reaches to 120m below the surface. Metallurgical
studies by previous explorers and by RareX show the rare earth elements are
hosted by Monazite which is a common and favourable host for rare earth
elements.
All drill hole locations are shown on the drill plan and collar details are tabled
within the announcement
•
Significant intercepts were calculated using weighted averaging
A lower cut off of 0.5% TREO was used with a maximum of 3m dilution. This cut off
grade and dilution is thought to be appropriate due to likely open cut mining
methods that would be used on the outcropping ore body.
A larger dilution of 6.19m was used to calculate the deepest intersection in hole
CDX0016 of 13.81m @ 2.7% TREO from 273m. The two higher grade intercepts with
in this 13.81m interval are shown in the significant intercept table. The intercepts
are part of the same mineralised zone, with all metres of dilution in between
having elevated rare earths. This mineralised zone is also shown in Photo 1 for a
visual perspective.
No metal equivalent values have been used
•
The angled drill holes were directed as best as possible across the known geology.
•
•
•
12
widths
intercept
lengths
and
Diagrams
Balanced
reporting
Other
substantive
exploration
data
Further work
If it is not known and only the down hole lengths are reported, there should be a clear
statement to this effect (eg ‘down hole length, true width not known’).
•
The true width of the intercepts in this announcement are >90% of the down hole
lengths
Appropriate maps and sections (with scales) and tabulations of intercepts should be
included for any significant discovery being reported These should include, but not be
limited to a plan view of drill hole collar locations and appropriate sectional views.
Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration Results.
Other exploration data, if meaningful and material, should be reported including (but
not limited to): geological observations; geophysical survey results; geochemical
survey results; bulk samples – size and method of treatment; metallurgical test
results; bulk density, groundwater, geotechnical and rock characteristics; potential
deleterious or contaminating substances.
The nature and scale of planned further work (eg tests for lateral extensions or large
scale step out drilling.
Diagrams clearly highlighting the areas of possible extensions, including the main
geological interpretations and future drilling areas, provided this information is not
commercially sensitive.
•
Sections, a drill hole plan and a vertical longitudinal projection are with in the
announcement.
•
Reporting is considered balanced
•
This announcement describes the initial geological interpretations of the first
diamond drill holes at Cummins Range since the early 1980s. RareX have recently
completed a JORC compliant resource upgrade of 18.8Mt at 1.15% TREO + 0.14%
Nb2O3. Metallurgical studies are currently being conducted and mining study drill
holes have been drilled recently.
Awaiting assays to completed geological interpretation
Metallurgical tests are being conducted
Scoping studies are being conducted
RareX Limited
Unit 6, 94 Rokeby Road, Subiaco WA 6008 Ph: 08 6383 6593 ACN: 105 578 756
•
•
•
13
Share your feedback