Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
57-71
15
Rare Earths
Phosphorus
RE P
ASX Release
26 April 2023
March 2023 Quarterly Report
Highlights
• Substantial increase in the Cummins Range “Rare Dyke” Mineral Resource to 397Mt at 0.33% TREO and
4.2% P2O5 for 1.3Mt of contained TREO and 16.7Mt of contained P2O5.
• Updated Resource and significant increase in project scale provides the catalyst for a staged development
approach, comprising:
o
o
o
Stage 1: Fast-tracked DSO phosphate fertiliser.
Stage 2: Phosphate concentrate.
Stage 3: Rare Earths concentrate.
• Updated global Mineral Resource due in late April 2023, to be followed by a revised Scoping Study
encompassing the new 3-Stage, DSO-catalysed development approach.
• Phosphate testwork confirms the potential to produce direct-application fertilisers from DSO and
concentrate, with results indicating exceptionally high phosphate bioavailability and highlighting the
opportunity to produce organic fertilisers for agricultural applications.
• Strategic board and management changes announced to prepare RareX for the transition to development
and operations
o
o
o
James Durrant appointed as Chief Executive Officer.
Jeremy Robinson moves to Non-Executive Chairman.
Former senior FMG, Danakali and Rio marketing, sales and shipping executive Danny Goeman
appointed as a non-executive Director.
• Maiden ESG framework and Sustainability & Self Assessment Report delivered for 2022.
• Strong cash and listed investments of $7.4m
Australian rare earths and phosphate company, RareX Limited (ASX: REE) (RareX or the Company), is pleased
to provide its quarterly activities and cash flow reports for the quarter ended 31 March 2023.
Management Comment
Commenting on the Quarter, RareX’s newly appointed CEO, James Durrant, said: “The March Quarter has
been a significant period for the Company, with the delivery of a step-change increase in the Mineral Resource
Estimate at our flagship 100%-owned Cummins Range Phosphate-Rare Earths Project in Western Australia
providing the catalyst for revised three-staged approach to the project development.
“The updated Resource – which was based solely on the Rare Dyke zone and captures a lot of the work we have
undertaken over the past three years – has delivered a 500% increase in contained Total Rare Earth Elements
(TREO) to 1.3 million tonnes and an 800% increase in contained phosphate to 16.7 million tonnes, firmly
establishing Cummins Range as the second largest undeveloped rare earths deposit in Australia.
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Level 1, 338 Barker Road
Subiaco WA 6008
Australia
P +61 (0) 8 6383 6593
info@rarex.com.au
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
57-71
15
Rare Earths
Phosphorus
RE P
“Part 2 of the resource update, which will include the Phos Dyke zone, is scheduled for release in the near future
to give us the full global resource at Cummins Range.
“Based on the significant increase in project scale, during the Quarter we articulated an evolved development
approach for Cummins Range, based on a three-stage development pathway. Under this proposed new strategy,
the project development will commence with a fast-tracked DSO phosphate fertiliser phase, followed by
phosphate beneficiation as Stage 2 and rare earth beneficiation as Stage 3.
“This approach is expected to reduce the risk associated with a full-scale rare earth development from the
outset. It would also allow RareX to deliver early cashflow from a low-capital-cost DSO mining operation, as
well as maximising the extraction of both the rare earths and phosphate from within the Mineral Resource.
“We have commenced work on an updated Scoping Study to support this new development strategy, which is
expected to be completed over the second half of 2023.
“With the Cummins Range Project now moving firmly into the development phase, during the Quarter the
Company made some key changes to its board and senior management team to oversee this next phase of
growth and development. I am delighted to have taken on the role as Chief Executive Officer, and we also
welcomed Danny Goeman, who brings senior marketing and sales expertise to the board, as well as Kay
Hoffman, who joins the team as Study Manager.
“We are now forging ahead with feasibility studies for the Cummins Range Project, focused on becoming a major
new supplier of phosphate and rare earths – both of which represent vital strategic inputs for food and energy
security in a growing and modernising world.”
Updated Mineral Resource Estimate
RareX reported an updated Mineral Resource Estimate (MRE) for the Cummins Range Rare Earths-Phosphate
Project during the March Quarter. The first instalment of the updated Cummins Range MRE is based on the
Rare Dyke and contains an Indicated and Inferred Mineral Resource of 397Mt at 0.33% TREO (total rare
earths oxide) and 4.2% P2O5 (phosphate) with appreciable quantities of niobium and scandium. The amount
of contained TREO is 1.3Mt with 280Kt of contained NdPr. This represents an increase of 500% from the
previous MRE in 2021, which is highly significant growth for RareX over a two-year period.
Table 1. Cummins Range Mineral Resource Estimate, P2O5≥2.5% cut off
Classification
Indicated
Inferred
Total
Notes:
1.
2.
3.
4.
Tonnes
(Mt)
44.3
352.9
397.2
P2O5
(%)
6.3
3.9
4.2
TREO + Y2O3
(ppm)
5,800
2,960
3,270
HREO
(ppm)
290
165
180
Nd2O3
(ppm)
930
490
540
Pr6O11
(ppm)
280
140
160
Nb2O5
(ppm)
1,020
570
620
Sc2O3
(ppm)
100
70
70
ThU
(ppm)
90
40
50
Due to effects of rounding, the total may not represent the sum of all components.
TREO (ppm) includes: Light Rare Earth Oxides (LREO): La2O3, CeO2, Pr6O11, Nd2O3; and Heavy Rare Oxides (HREO): Sm2O3, Eu2O3, Gd2O3, Tb4O7, Dy2O3, Ho2O3,
Er2O3, Tm2O3, Yb2O3, Lu2O3; + Y2O3
ThU comprises ThO2 + U3O8 (ppm)
Mineral Resource is reported from all blocks, classified as either Indicated or Inferred, where interpolated block grade is ≥ 2.5% P2O5
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Level 1, 338 Barker Road
Subiaco WA 6008
Australia
P +61 (0) 8 6383 6593
info@rarex.com.au
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
57-71
15
Rare Earths
Phosphorus
RE P
The relatively high NdPr and HREO (heavy rare earth oxide) content at Cummins Range is consistent with that
of monazite dominant mineralisation, resulting in a high Basket Price of US$33/kg for the Project as shown
below:
Table 2. Rare Dyke Mineral Resource-Based Basket Price
Element
LREO
La2O3
CeO2
Pr6O11
Nd2O3
Sub-Total
HREO
Sm2O3
Eu2O3
Gd2O3
Tb4O7
Dy2O3
Ho2O3
Er2O3
Tm2O3
Yb2O3
Lu2O3
Y2O3
Sub-Total
Total Basket Price
US$/kg
Price US$/kg
% of TREO
Basket Price
US$/Kg
% of Basket
Price
1.1
1.1
110.0
110.0
24.8%
45.9%
4.9%
16.4%
92.0%
0.3
0.5
5.4
18.1
24.2
0.8%
1.5%
16.3%
54.8%
73.4%
2.5
26.0
36.0
2,300.0
595.0
10.0
2.2%
0.6%
1.4%
0.2%
0.7%
0.1%
0.2%
0.0%
0.1%
0.0%
2.5%
8.0%
0.1
0.1
0.5
3.6
4.2
0.3
8.8
0.2%
0.4%
1.5%
11.0%
12.7%
0.0%
0.0%
0.0%
0.0%
0.0%
0.8%
26.6%
33.0
Complementing the increase in TREO is the very large phosphate resource of 16.7Mt of contained P2O5. The
updated Rare Dyke MRE includes 44Mt at 6.3% P2O5 in the higher-confidence Indicated category, which is
mostly contained in the upper 100m.
A significant increase in the phosphate tonnes is also expected from the Phos Dyke MRE, which is anticipated
to be completed in late April. When the Phos Dyke MRE is complete, a global resource containing both the
Rare and Phos Dykes will be announced.
A phosphate cut-off was chosen for the MRE as it better represents the geology and economic potential of the
deposit in that it captures the phosphate and almost all of the rare earths.
Substantial quantities of phosphate will be mined to access rare earth mineral concentrations and RareX
intends to extract value from both the phosphate and rare earths. In addition, the Company will investigate
the value opportunities presented by the appreciable quantities of niobium and scandium present in the
deposit.
Full details of the updated MRE for Rare Dyke were provided in the Company’s ASX Announcement dated 30
March 2023.
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Level 1, 338 Barker Road
Subiaco WA 6008
Australia
P +61 (0) 8 6383 6593
info@rarex.com.au
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
57-71
15
Rare Earths
Phosphorus
RE P
Revised Development Strategy
The Mineral Resource update outlined above, which will be followed by a further significant Resource update
due by late April 2023, has re-framed the Cummins Range Project as a highly significant phosphate-hosted
rare earths deposit commencing from surface.
The concept emerging as a result of the new understanding of the resource, coupled with important recent
metallurgical testwork results (see below), suggests the option for an initial fast-tracked DSO (direct shipping
ore) phosphate fertiliser phase (Stage 1), followed by phosphate beneficiation (Stage 2) and subsequently
rare earth beneficiation and value chain development (Stage 3).
This staged approach is expected to lower the risk associated with building the full rare earth value chain
outright at the beginning, by delivering a simpler and lower-cost DSO phosphate operation using existing
infrastructure, whilst maintaining development towards a large scale, strategic, rare earth and phosphate
critical minerals project.
Feasibility studies are investigating this pathway and a specific emphasis is being placed on accelerating the
DSO portion while maintaining a technical pathway towards the ultimate goal of producing rare earth critical
metals. RareX aims to announced revised project economics this financial year and a Scoping Study on Stage
1 by the end of 2023.
Further information on the revised development strategy for the Cummins Range Project was provided in the
Company’s ASX Announcement dated 13 April 2023.
Metallurgical Testwork
Recent testwork on samples from the Cummins Range Project confirmed the potential to produce phosphate
Direct Shipping Ore (DSO) and phosphate mineral concentrate, with both products showing strong potential
as direct-application agricultural fertiliser.
Results from initial phosphorous bioavailability tests on DSO and phosphate mineral concentrate – both of
which are anticipated co-products with rare earths from Cummins Range – show the material possesses very
high bioavailability, that is two-to-five times better than what has been classified as high-bioavailable rock
phosphate by industry standard.
This unlocks a variety of development scenarios for the Cummins Range Project, including:
• A DSO product could be produced initially, meaning very low levels of processing and capital would be
required to develop a readily saleable and marketable phosphate product line that is in demand in the
fertiliser trade.
• A premium-grade phosphate concentrate product could also be produced from the Cummins Range
deposit for direct-application fertiliser. Previous testwork has already demonstrated a simple
beneficiation flowsheet and low reagent consumptions, suggesting low capital and operating costs.
In addition, the beneficiation circuit for phosphate concentrate production could be integrated as part of the
rare earth beneficiation process in the longer-term, supporting enhanced project development.
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Level 1, 338 Barker Road
Subiaco WA 6008
Australia
P +61 (0) 8 6383 6593
info@rarex.com.au
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
57-71
15
Rare Earths
Phosphorus
RE P
Direct-application fertilisers are classified as organic as they do not require chemical reaction with sulphuric
acid to make the phosphate derivative products. In addition, they often have favourable properties for plants’
uptake. Direct-application phosphates, where the natural mineral form remains unadulterated, can be
produced at a discount while also trading at a premium to processed phosphates.
The testwork undertaken to assess the phosphorous bioavailability of the Cummins Range mineralisation was
a 2% citric acid test, which is an industry standard bioavailability assessment. The tests simulated the soil
conditions and were performed on four resource samples – two DSO samples and two phosphate float
concentrate samples.
All potentially deleterious elements (fluorine, cadmium, uranium and chlorine) were within normal
specifications, and no further deleterious elements are present.
Tests on the phosphate co-product are being undertaken in parallel with rare earth metallurgical testwork
programs, which are also delivering promising results.
Further information on the bioavailability of the phosphate from Cummins Range Project was provided in the
Company’s ASX Announcement dated 23 March 2023.
Heritage and Environmental Update
Negotiations with the Jaru Traditional Owners are on track with a draft Mining Agreement and compensation
proposal complete. The RareX team, with support from Allens law firm, will meet with the Traditional Owners
Negotiation Committee (TONC) again towards the end of April with the goal of completing negotiations before
the start of the 2023 wet-season.
RareX wishes to take this opportunity to thank the Jaru TONC for a constructive, collaborative, and pragmatic
approach to the negotiations.
MBS Environmental, with support from WSP Golder, have designed the environmental approvals strategy and
have been project managing the environmental and heritage surveys. The final flora and fauna surveys are
due in May 2023.
Baseline environmental studies should be completed in 2023, allowing for the requisite approval submissions
in early 2024. Under the evolved development approach, DSO Stage 1 will follow a simplified approvals path
with the more complex Stage 2 and Stage 3 approvals expected to run in parallel.
Exploration
Assay results were reported during the Quarter for a further 30 drill-holes, with multiple significant rare earth
and phosphate intercepts.
Results included a record intercept of 513.8m at 0.5% TREO and 5% P2O5 from 3m and 144m at 5% P2O5 and
0.7% TREO from 557m from scissor hole CDX0033, including very high-grade zones of 12.65m at 2.3% TREO
and 5% P2O5 and 7.8m at 5.3% TREO and 6% P2O5.
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Level 1, 338 Barker Road
Subiaco WA 6008
Australia
P +61 (0) 8 6383 6593
info@rarex.com.au
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
57-71
15
Rare Earths
Phosphorus
RE P
Other broad,wide results reported during the Quarter included:
• 426.9m at 0.4% TREO and 4% P2O5 in hole CDX0038
• 406m at 0.3% TREO and 4% P2O5 in CDX0024
Narrower high-grade rare earth intercepts of up to 11.5% TREO were reported, including:
• 35m at 1.6% TREO including 16m at 2.4% TREO in CDX0037
• 11m at 2.2% TREO and 18% P2O5 in CDX0034
• 9.6m at 1.6% TREO and 8% P2O5 including 3.2m at 3.4% TREO in CDX0040
• 9.8m at 3.3% TREO and 5% P2O5 including 2.2m at 11.5% TREO in CDX0043
• 10m at 3.6% TREO and 6% P2O5 including 3m at 9.5% TREO in CDX0050
RC results for the four northernmost drill holes, designed to test for extensions to the Phos Dyke
mineralisation, all assayed 5% P2O5 and 0.2% TREO over wide intercepts:
• CRX0076 111m at 0.2% TREO and 5% P2O5
• CRX0077 97m at 0.2% TREO and 5% P2O5
• CRX0078 94m at 0.2% TREO and 5% P2O5
• CRX0079 85m at 0.2% TREO and 5% P2O5
In addition, monazite (not apatite) has been confirmed as the host of rare earths mineralisation in the Phos
Dyke, containing highly valuable concentrations of up to 44% NdPr and HREO (26% NdPr and 19% HREO).
Full details of the assay results were reported in the Company’s ASX Announcements dated 23 January 2023
and 16 March 2023.
NSW Copper-Gold Project
The Trundle Gold-Copper Project Joint Venture, located in the Macquarie Arc of the Lachlan Fold Belt in New
South Wales, is a 65%/35% joint venture between RareX and Kincora Copper Ltd (Kincora) (TSXV: KCC) and
includes the Trundle and Fairholme Projects.
During the Quarter, Kincora reported that its first drill holes into three prospects at the Trundle Project had
intersected significant zones of mineralisation at shallow depths, with assay results including:
• 12.5m at 2.77g/t gold from 77.5m, including 2m at 14.2g/t gold (Dunn’s North Prospect)
• 31m at 0.49g/t gold, 0.25% copper and 55ppm molybdenum from 65.9m (Dunn’s South Prospect),
including:
o
o
8.6m at 1.21g/t gold, 0.26% copper and 90ppm molybdenum from 65.9m, with 1m at 6.88g/t
gold, 0.30% copper and 46ppm molybdenum
4.5m at 0.50g/t gold, 0.79% copper and 180ppm molybdenum from 92.4m, with 0.5m at
1.72g/t gold, 2.54% copper and 721ppm molybdenum
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Level 1, 338 Barker Road
Subiaco WA 6008
Australia
P +61 (0) 8 6383 6593
info@rarex.com.au
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
57-71
15
Rare Earths
Phosphorus
RE P
Drilling is continuing.
Weld North
A wide spaced lithogeochemical soil survey was completed on all three tenements. Soil samples were taken
on a 1km grid. Assay results have not been received as yet. Results will be used to create a geochemical
assessment of lithologies and for potential anomalies.
Hong Kong Project
No work was undertaken on the Hong Kong Project during the Quarter.
Moroccan Cobalt Projects
No work was undertaken on the Moroccan projects during the Quarter. The Company is in the process of
finalising the divestment of these assets.
CORPORATE
Key management and board changes
During the Quarter, RareX announced key changes to its management and board structure, aimed at
enhancing market reach and driving the development of the Company’s Cummins Range Project.
Effective 3 April 2023, experienced mining executive Mr James Durrant assumed the role of Chief Executive
Officer (CEO), leveraging his extensive experience in rare earths, bulk commodities and fertilizers to lead the
Company through its next phase of growth.
In conjunction with Mr Durrant's appointment, RareX founder and Managing Director, Mr Jeremy Robinson,
transitioned to the role of Non-Executive Chairman, while Chairman, Mr John Young, transitioned to NonExecutive Director.
Mr Durrant holds degrees in mechanical engineering and mining engineering from the Camborne School of
Mines in England, a Quarry Manager’s Certificate of Competency, and is a graduate of the Australian Institute
of Company Directors. He is an elected board member of AAMEG, which supports responsible mine
development in Africa.
Mr Durrant joined RareX as General Manager – Projects in 2021 and has been Chief Operating Officer since
January this year. He was previously Director of Projects with Canyon Resources and, before that, held
project development and marketing leadership roles at Danakali Limited. Prior to that, he spent seven years
with BHP Billiton Iron ore.
Mr Danny Goeman has been appointed to the Board as a Non-Executive Director, bringing over 20 years of
marketing and sales experience including industry analysis, price negotiation, market segmentation and
product placement across multiple commodities and multiple jurisdictions including Australia, Asia and
Europe.
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Level 1, 338 Barker Road
Subiaco WA 6008
Australia
P +61 (0) 8 6383 6593
info@rarex.com.au
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
57-71
15
Rare Earths
Phosphorus
RE P
Mr Goeman was previously the global director of sales & marketing and shipping at Fortescue Metals Group
(ASX: FMG) for four years before becoming a senior advisor to the chief executive in September 2022. Prior to
FMG, he was head of marketing at international potash development company, Danakali (ASX: DNK), where
he developed the off-take strategy, off-take contract frameworks and led the off-take negotiations on behalf
of the Colluli Mining Share Company cumulating in a binding take-or-pay offtake deal with a tier 1 fertiliser
company. He became its chief executive from September 2017 to August 2018. Prior to Danakali, Mr Goeman
worked within Rio Tinto and held leading roles in commodity price negotiations, market analysis, market
segmentation and price forecasting.
Experienced mining operations manager, Kay Hofmann, has been appointed as Cummins Range Study
Manager. Mr Hofmann was most recently Manager – Ground Control and Water at Mineral Resources Limited
(ASX: MIN) and, prior to that, held a number of production roles at BHP and BHP Billiton Iron Ore.
The Company is also pleased to confirm that RareX’s long-serving Exploration Manager, Mr Guy Moulang, will
continue to serve as Exploration Manager, a long-term employee currently preparing for the 2023 exploration
season.
RareX would like to take this opportunity to extend its gratitude to Mr Michael Prassas, who has left RareX to
pursue other opportunities after making a significant contribution to the Company’s rebranding and
preparation for this crucial development stage.
$1.92M Refund for R&D Activities
During the Quarter, RareX received a $1.92 million refundable tax offset for eligible research and
development (R&D) expenditure conducted at the Company’s Cummins Range Project during the 2021-22
financial year.
The R&D activities were primarily focused on testing the hypothesis relating to the development of an
innovative process for the extraction of rare earth elements from the Cummins Range deposit.
Sustainability Report
RareX’s inaugural Environmental, Social & Governance Framework and Maiden Sustainability and SelfAssessment Report for 2022 was published on 14 February 2023, providing an overview of the Company’s
ESG framework and its ESG performance over the past year.
Change of Registered Address and Principal Place of Business
RareX’s registered office and principal place of business has changed to:
Level 1, 338 Barker Road
Subiaco WA 6008
This announcement has been authorised for release by the Board of RareX Limited.
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Level 1, 338 Barker Road
Subiaco WA 6008
Australia
P +61 (0) 8 6383 6593
info@rarex.com.au
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
57-71
15
Rare Earths
Phosphorus
RE P
Competent Person’s Statements
Prior exploration results were reported in accordance with Listing Rule 5.7 and the Company confirms it is not
aware of any material changes since the information was first reported on 23 January 2023, 16 March 2023,
21 March 2023 and 24 March 2023.
The information in this release that relates to the Mineral Resource Estimate was reported in accordance with
Listing Rule 5.8 on 30 March 2023. The Company confirms that it is not aware of any new information or data
that materially affects the information included in the original market announcement and that all material
assumptions and technical parameters underpinning the estimate in the relevant market announcement
continue to apply and have not materially changed.
For more information,
please contact:
Investors: James Durrant
Media: Nicholas Read, Read Corporate
P +61 (0) 8 6383 6593
P +61 (0) 8 9388 1474
About RareX Limited – ASX: REE
RareX Limited (ASX: REE) is a Perth-based rare earths and phosphate project development company. RareX’s
focus is on developing its flag-ship Cummins Range Rare Earths and Phosphate Project.
Rare Earths and in particular, NdPr are core enablers of decarbonisation and electrification of our society.
NdPr supports high strength magnets which enables low carbon technologies, especially in the electric
mobility sector, robotics solutions and renewable energy, particularly the wind energy sector.
Phosphates are one of the three macro nutrients required in fertilisers. Fertilisers are in ever more demand
due to population growth, depleting soils and reduced arable land requiring ever more intensive farming.
The Cummins Range Rare Earths and Phosphate Project is in the East Kimberley region of Western Australia.
RareX is committed to developing a sustainable, ethical, transparent and secure low carbon rare earth and
phosphate supply chain solution for its products which satisfy the two global mega-trends of population
growth and electrification.
For further information on the Company and its projects visit www.rarex.com.au
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Level 1, 338 Barker Road
Subiaco WA 6008
Australia
P +61 (0) 863 836 593
info@rarex.com.au
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
57-71
15
Rare Earths
Phosphorus
RE P
Appendix A: RareX Limited Interests in Mining Tenements
The following information is provided pursuant to Listing Rule 5.3.3 for the quarter ended 31 March 2023.
There were no acquisitions or disposals during the quarter.
Australian Tenement Schedule
State
Project
WA
Cummins Range
WA
Cummins Range Extension
WA
Weld North
WA
Weld North
WA
Weld North
WA
Mt Mansbridge
WA
Hong Kong
NSW
Condobolin
NSW
Cundumbul
NSW
Fairholme
NSW
Fairholme
NSW
Trundle
NSW
Jemalong
Moroccan Tenement Schedule
Licence Name
Tizi Belhaj
Bou Amzil
Imdere
Bou Amzil Extension
Lease No
E80/5092
E80/5372
E38/3455
E38/3530
E38/3531
E80/5430
E47/3566
EL 7748
EL 6661
EL 6552
EL 6915
EL 8222
EL 8502
Licence No
234 08 79
233 88 04
233 94 05
PR 384 22 26
RareX Interest
100%
100%
100%
100%
100%
100%
100%
35%
35%
35%
35%
35%
35%
RareX interest
20%
20%
20%
-
Note
Kincora JV
Kincora JV
Kincora JV
Kincora JV
Kincora JV
Kincora JV
Note
Divesting this asset
Divesting this asset
Divesting this asset
Divesting this asset
Appendix 2: Disclosures in relation to Quarterly Cashflow Report
In line with its obligations under ASX Listing Rule 5.3.5, RareX Limited notes that the only payments to
related parties of the Company, as advised in the Appendix 5B for the period ended 31 March 2023, pertain to
payments to the managing director for salary and superannuation, non-executive director fees and to Primero
Group in connection with study work. During the Quarter, the Company spent approximately $0.65m on
project and exploration activities. The exploration expenditure relates primarily to assaying of core from the
Cummins Range Project, a soil sampling program at Weld North and metallurgical test work.
Appendix 3: RareX investments
Company
Ticker
# Shares Held
Value (AU$)
Pricing date
Cosmos Exploration
Kincora Copper
Canadian Rare Earth Company
Value of investments
C1X
KCC
LL.V
10,000,000
5,000,000
25,000,000
3,300,000.00
350,000.00
1,387,500.00
5,037,500.00
31/3/2023
31/3/2023
31/3/2023
31/3/2023
RareX Limited
ASX:REE
ABN: 65 105 578 756
RareX HQ
Level 1, 338 Barker Road
Subiaco WA 6008
Australia
P +61 (0) 863 836 593
info@rarex.com.au
rarex.com.au
RareX Limited (ASX:REE)
@rarex_asx
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
RareX Limited
ABN
Quarter ended (“current quarter”)
65 105 578 756
31 March 2023
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(9 months)
$A’000
-
-
(651)
(5,464)
(b) development
-
-
(c) production
-
-
(d) staff costs
(428)
(1,392)
(e) administration and corporate costs
(392)
(1,080)
(a) exploration & evaluation
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
4
8
1.5
Interest and other costs of finance paid
(4)
(14)
1.6
Income and other taxes paid
(6)
(14)
1.7
Government grants and tax incentives
2,142
2,142
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
655
(5,814)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(9)
(19)
(d) exploration & evaluation
-
-
(e) investments
-
-
(f)
-
-
(c) property, plant and equipment
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(9 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(20)
(20)
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (Refund of security deposit)
-
-
2.6
Net cash from / (used in) investing
activities
(29)
(39)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
40
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
(4)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (Reduction in finance lease liability)
(21)
(61)
3.10
Net cash from / (used in) financing
activities
(21)
(25)
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
1,740
8,233
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
665
(5,814)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(29)
(39)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
(21)
(25)
(d) investments
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows
Share your feedback
Discover