Corporate Directory ..................................................................................................................................... 2
Review of Operations .................................................................................................................................. 3
Directors’ Report ....................................................................................................................................... 18
Auditor’s Independence Declaration ........................................................................................................ 33
Financial Statements ................................................................................................................................ 34
Consolidated entity disclosure statement …………………………………………………………………………………………………73
Director’s Declaration…………………………………………………………………………………………………………………………………….74
Auditor’s Report......................................................................................................................................... 75
Mineral Resource Statement .................................................................................................................... 78
Schedule of Mining Tenements ............................................................................................................... 80
ASX Additional Information ...................................................................................................................... 81
1
Corporate Directory
DIRECTORS
LAWYERS
Mr Jeremy Robinson
Non-Executive Chairman
Hamilton Locke
Central Park, Level 39
152-158 St Georges Terrace
Perth, Western Australia 6000
Mr James Durrant
Managing Director & CEO
Mr Danny Goeman
Non-Executive Director
AUDITOR
Mr Shaun Hardcastle
Non-Executive Director
SW Audit
Level 18, 197 St Georges Terrace
Perth, Western Australia 6000
COMPANY SECRETARY
SHARE REGISTRY
Ms Oonagh Malone
Automic Registry Services
Level 2, 267 St Georges Terrace
Perth, Western Australia 6000
REGISTERED OFFICE & PRINCIPAL PLACE
OF BUSINESS
Telephone: 1300 288 664
Level 1, 338 Barker Road
Subiaco, Western Australia 6008
Telephone:
ASX CODES: REE, REEO
(08) 6383 6593
Website: www.rarex.com.au
2
Review of Operations
The Board of RareX Limited (RareX) is pleased to provide a review of operations across the
Company’s asset portfolio for the 2024 financial year and to date.
Managing Director’s Statement
Dear Shareholders,
I would like to take this opportunity, with the release of our annual report, to reflect on the year that's
been, present our vision for the future, and thank shareholders past and present for their support - most
particularly those that have supported the business through challenging macro and microeconomic
conditions.
During this year, rare earth prices, to which we are most heavily leveraged, have seen a significant drop
from their US$150+ per kilogram NdPr highs of 2022 down to the current mid to high US$40/kg range.
This impacts all projects and is well below incentive pricing. Most indications suggest a return to over
US$100 per kilogram in the next few years. Recently, some indications of a recovery have emerged, but
with ongoing uncertainty with respect to the sustainability of the recovery.
Our primary engineering project, Cummins Range, remains well positioned as both a phosphate and a
rare earth project, and we are now taking this opportunity to find low cost phosphate startup for this
longer term rare earth project. We do this against a backdrop of steady progress at Cummins Range,
including the de-risking of the supply chain to the port of Wyndham, defining the resource, advancing the
offtake process and progressing our relationships with the native title groups. We have progressed our
mining agreement with the heritage and environmental components and baselines now largely complete.
This year we also reflected on the broad risks associated with single project orientated businesses and
we have consequently started developing a pipeline of inorganic growth options. The first milestone of
this was the acquisition of the Khaleesi Project in the East Yilgarn which has excellent indications of a
rare earth - niobium mineralised system as well as showing a considerable opportunity for base and
precious metals.
The package of tenements at Khaleesi are being processed into their 'granted' status, including with one
of the most expeditious heritage access agreements with the UUNAC, and we are planning a significant
drilling program in the near future.
The inorganic growth opportunity of the business does not stop with Khaleesi, and we have refined our
search criteria. We are evaluating projects and have some specific targets into which we are putting
significant effort.
Part of our business development program sees us take a position in Saudi Arabia which we regard as
geologically attractive and a real emerging mining jurisdiction with the strong geology augmented by a
strong, financially backed, intent to establish a mining industry ecosystem similar to Australia. We are
working with the public tender process and in parallel forming a position in country to work on projects
that are not in the public space.
3
We have also begun working with advisors, Hunter and Co, on a particular target and also to bring in
projects from further afield that are in a more advanced status than we might otherwise have access to.
This year we also saw some changes in the leadership of the Company and I have been fortunate enough
to have been entrusted by the Board to lead the company as Managing Director. My objective remains to
be transparent with the direction of this business, even when times are challenging, and I have set up
systems to facilitate strong interaction between shareholders and the Company.
I am looking forward to RareX engineering an efficient startup for Cummins Range. I am also looking
forward to our first high impact drilling program at Khaleesi which will go through the cover sequence
and into the host rock where we see signs of mineralised carbonatites. I also look forward to what our
business development activities can deliver for our shareholders in addition to the current portfolio.
James Durrant
Managing Director
Figure 1: Jaru site visit to Cummins Range Rare Earths & Phosphate Project.
4
Cummins Range Rare Earths & Phosphate Project
RareX’s flagship, 100%-owned Cummins Range Project is a nationally significant rare earths and
phosphate project located in the Kimberley region of Western Australia, 135km southeast of the town
of Halls Creek. Halls Creek is well provisioned for infrastructure with power, water and a sealed
airstrip. The Cummins Range Project is serviced by the Great Northern Highway which connects to
the Port of Wyndham.
Enhanced scoping study
At the start of the financial year RareX released an enhanced Scoping Study for Cummins Range. The
study built upon learnings and recommendations from the September 2022 Scoping Study,
metallurgical testwork and the 2023 updated Mineral Resource Estimate which positioned Cummins
Range as Australia’s largest undeveloped rare earths project.
The Project outlined in the Scoping Study is based on the Mineral Resource Estimate published to the
ASX on1 May 2023.
Stage 1: Low CAPEX (A$45M), direct shipping ore (DSO), direct application (DA), high-bioavailability,
organic rock phosphate fertiliser for agricultural purposes. A production rate of up to 300 ktpa of 23%
P2O 5 is forecast for a period of 3 years.
Stage 2: Installation of a mid-sized beneficiation plant of A$304M to produce 550 ktpa phosphaterare earth mineral concentrate from the weathered resource for the phosphoric acid and rare-earth
concentrate market.
Stage 3: A$63M upgrade of the Stage 2 plant in year 13 to produce a concentrate from the unweathered, fresh, rock below c.130 m RL. Stage 3 should see further improvement and optionality in
post beneficiation upgrades due to mineralogy factors. A mine closure cost of A$41M has been
allocated at the end of Stage 3.
The project concept outlined in the Scoping Study comprises a Stage 1 direct shipping ore (DSO) open
pit mine and basic site infrastructure, including a crushing-screening plant and a road linking the mine
site to the Tanami Road, 40km north of Billiluna. This will be followed by Stage 2, which comprises
the installation of a flotation beneficiation facility at site to produce a rare earth and phosphate
mineral concentrate, and the expansion of non-process infrastructure (NPI).
This staged development approach has the benefits of initiating early cashflows, building confidence
with the regulators on environmental management, furthering community relationships and social
performance, providing greater mineral resource definition, allowing bulk samples for metallurgy and
piloting, and establishing a functioning supply chain; all of which substantially de-risk Stage 2 which
transitions the project into a rare-earth critical mineral mine.
All project stage products are proposed to be trucked along mostly sealed roads to Wyndham Port,
with the Tanami Road currently undergoing sealing. At Wyndham Port, which is powered by hydro
electricity from the Ord River hydro power station, the Company proposes to install a simple covered
stockpile storage area and to collaborate on using existing infrastructure and incumbent operators,
including the current KMG iron ore loading jetty and transhipping operators familiar with the port.
5
Mineral Resource Update
In January 2024, following a successful drill campaign, the Company was pleased to announce an
updated Mineral Resource Estimate for the Cummins Range Project.
The 2023 drill program was focused on gaining further understanding of the metallurgical domains
and continuity of high-grade phosphate in the regolith. Drilling was also completed on the eastern
edge of the Resource, where pit designs required definition.
This drilling underpinned an updated Resource estimate totalling 524Mt at 0.31% TREO and 4.6%
P2O5, including a higher-grade TREO Resource of 44Mt at 1.02% TREO and 5.8% P2O5 based on a
6,500ppm TREO cut.
Cummins Range is a unique rare earths project due to its favourable phosphate mineralisation, which
makes peer comparison analysis difficult. The Project’s exposure to the two major sectors of the
green energy transition – rare earths for energy generation/use and phosphate for energy storage (by
way of LFP batteries) – means the deposit underpins a rare project opportunity with reduced
development and operational risk.
Table 1. Cummins Range Mineral Resource Estimate, P2O5 ≥2.5%
RARE DYKE
Classification
Tonnes
(Mt)
P2O5
(%)
TREO +
Y2O3 (ppm)
HREO
(ppm)
Nd2O3
(ppm)
Pr6O11
(ppm)
Nb2O5
(ppm)
Sc2O3
(ppm)
ThU
(ppm)
Indicated
44.4
6.0
5560
280
880
260
990
90
80
Inferred
363.7
43.9
2960
160
480
140
570
70
40
Total
408.2
4.1
3240
180
520
160
610
70
40
PHOS DYKE
Classification
Tonnes
(Mt)
P2O5
(%)
TREO +
Y2O3 (ppm)
HREO
(ppm)
Nd2O3
(ppm)
Pr6O11
(ppm)
Nb2O5
(ppm)
Sc2O3
(ppm)
ThU
(ppm)
Indicated
33.0
7.6
3430
290
670
170
500
80
100
Inferred
83.1
5.6
2390
200
460
120
450
60
60
Total
116.2
6.2
2690
230
520
140
460
70
70
COMBINED
Classification
Tonnes
(Mt)
P2O5
(%)
TREO +
Y2O3 (ppm)
HREO
(ppm)
Nd2O3
(ppm)
Pr6O11
(ppm)
Nb2O5
(ppm)
Sc2O3
(ppm)
ThU
(ppm)
Indicated
77.4
6.7
4650
280
790
230
780
90
90
Inferred
446.9
4.2
2860
170
480
140
550
70
40
Total
524.3
4.6
3120
190
520
150
580
70
50
Notes:
1. Due to effects of rounding, the total may not represent the sum of all components
2. TREO (ppm) includes: Light Rare Earth Oxides (LREO): La 2O3, CeO2, Pr6O11, Nd2O3; and Heavy Rare Oxides (HREO): Sm2O3, Eu2O3, Gd2O3, Tb4O7, Dy2O3, Ho2O3,
Er2O3, Tm2O3, Yb2O3, Lu2O3; + Y2O3
3. ThU comprises ThO2 + U3O8 (ppm)
4. Mineral Resource is reported from all blocks, classified as either Indicated or Inferred, where interpolated block grade is >2.5% P2O5
A phosphate cut-off was chosen for the MRE as it better represents the geology and economic
potential of the deposit in that it captures the phosphate and almost all of the rare earths.
Substantial quantities of phosphate, now classified by the Australian Federal Government as a
Strategic Mineral, will be mined with the rare earth mineral and RareX intends to extract value from
both the phosphate and rare earths.
6
During the 2023 field season, an improved geological model was created which defined several
domains within the regolith that will allow accurate mining study work to be completed for the
production of a rare earths phosphate concentrate (REPC), potentially preceded by monetised rock
phosphate direct shipping ore (DSO).
Metallurgical studies have shown lower-grade rare earths and phosphate are easily upgraded to a
high-grade REPC. The rare earths can then be extracted from the REPC at a phosphoric acid
production plant, potentially supplying the LFP (lithium ferro phosphate) battery supply chain.
Using this product approach allows RareX to extract the most value from the two commodities within
the large Cummins Range Resource.
Full details of the updated Mineral Resource Estimate were provided in the Company’s ASX
announcement dated 25 January 2024.
Rare Earths Metallurgical Testwork
Beneficiation testwork has returned promising results for the beneficiation of rare earths (RE) from
the Cummins Range Project. RareX has initiated a beneficiation program at Baotou Mengrong Fine
Materials (BTMR) in China to test RE beneficiation from both whole ore and the leach residue from
the phosphoric acid production. BTMR is a highly experienced Chinese research institute and is a
preeminent testing laboratory for rare earths beneficiation, particularly flotation.
Following the positive dilute acid leach and RE flotation results at BTMR, the next important step of
RareX’s metallurgical testwork program was to demonstrate good mineralogy of the leach residue to
support the Company’s proposed product strategy.
A Quantitative Evaluation of Materials by Scanning Electron Microscopy (QEMSCAN) analysis was
performed at ALS Metallurgy in late 2023 to better understand the mineralogy of the leach residue
and confirm favourable RE mineral distribution that will be used to support further RE beneficiation
testwork.
Results indicate that monazite is the main RE hosting mineral, accounting for approximately ~70% of
the total rare earth elements. Bastnasite (10%) and crandallite (20%) host the remaining RE. The RE
deportment is very well aligned to the mineralogy analysis on the head sample that was used for
generating this leach residue, suggesting that the RE minerals remained intact during the dilute
phosphoric acid leaching process.
Monazite locking and liberation analysis showed minimal locking of monazite with other minerals
post the dilute acid leach. Improved liberations were also observed, showing 64.4% ‘well liberated’ (at
-53µm grind size) monazite (i.e., >90% monazite) and another 20.5% classified as ‘high grade
middlings’ (60-90% monazite).
It was also noted that this leach residue is generated from the same head sample that was tested at
BTMR and achieved >20 times RE upgrade. This result is well aligned to RareX expectations and
further supports the proposed product processing strategy at the offtaker’s facility.
Bulk flotation of a 90kg sample was completed and generated ~18kg of dual mineral concentrate
samples. A 10kg sample of the concentrate was leached with dilute phosphoric acid to generate
product derivatives to better support off-take discussions.
7
Phosphate Bulk Flotation Testwork
Following the positive 2022 sighter testwork results, a bulk flotation program was carried out to
assess if similar, or better, flotation performance can be achieved at larger scale with the same simple
flotation circuit. The bulk flotation using larger float cells is a good intermittent step to simulate pilot
testing and to assess if similar flotation kinetics can be achieved. The test was performed on the
same regolith composite that were tested in the sighter program and was undertaken at Auralia
Metallurgy in Perth.
Excellent results were achieved from the bulk flotation test producing a phosphate concentrate of
34.4% aligning to the sighter float performance. The bulk float P 2O5 recovery of 91.1% was also
encouraging and was better that the sighter program. The flotation tests were not focused on
concentrating rare earths and the TREO head grade is relatively low for this composite, however, the
recovery trend of the rare earth showed high similarities, albeit slightly lower recoveries, to the
phosphate for this composite in line with expectations.
RareX sees the staged development of Cummins Range as a practical, fundable and lower risk
approach which plays to the strengths of the deposit where parts of the shallow orebody are more
enriched in phosphate relative to rare earths.
Flotation is the obvious initial beneficiation method at scale due to favourable lab results and the use
of the same facilities in the subsequent rare earths flotation, however this remains a relatively capital
intense approach. Therefore, a more targeted, microbe assisted, leaching of the phosphate with
Australian and US partners, already engaged, could enable much lower start-up costs and significantly
reduced logistics costs for mine gate products going to market.
Bench scale and comparative glasshouse trials indicate a clear economic benefit to farmers relying
on large quantities of synthetic fertilisers. Specifically, initial tests of the bio-microbial phosphate
product by our partners appear to compete very well in substitution of synthetic fertilisers in soils
similar to those in the Ord River region, one of RareX’s natural initial customer bases.
Completion of Baseline Environmental Surveys
RareX, with support from its environmental consultants, including MBS Environmental and Rapallo
Environmental, has completed the key environmental baseline work needed for meaningful
engagement with the environmental permitting agencies. The reports received cover environmental
aspects including:
•
•
•
•
•
•
Flora
Fauna
Subterranean Fauna
Ground and Surface Water
Soils and Landforms
Mine Rock Chemistry and Mineralogy
The reports provide a description of the above environmental factors, associated risks in the context
of a mining project being developed and proposed strategies to mitigate impacts to observed
environmental receptors.
No unusual or unexpected observations were made against initial desktop assessments and all
observed risk factors have precedent mitigation strategies applied in the industry.
8
The project is located well away (>10km) from any reserves or other key receptors and is nestled
amongst large regional landforms that extend well beyond the project area and as such provide plenty
of continuous habitat for existing species to use during and after mining operations.
Regional Exploration at Cummins Range
Aerial magnetics and ground gravity surveys were completed over 100%-owned tenements E80/5092
and E80/5372 at Cummins Range in September 2023. Both surveys identified numerous targets,
including a likely second ultramafic pipe in the northern portion of E80/5092.
Results from the surveys indicate two large well-defined ultramafic bodies to the north of the existing
Cummins Range deposit. The body immediately to the north of Cummins Range measures 4km long
and up to 1km wide. Geophysics has defined internal structures and irregularities in the body, which
may have been caused by intruding carbonatites similar to those within the Cummins Range pipe.
A second pipe-like circular ultramafic body measuring 1km in diameter has been defined 6km to the
north of the Cummins Range deposit. The magnetic and gravity responses over this intrusion also
show irregular responses similar to those seen at the Cummins Range pipe.
Figure 2:Total magnetics image on RareX tenements at Cummins Range.
9
Figure 3: Ground Gravity image on RareX tenements at Cummins Range.
Offtake MOU
RareX has signed an offtake MOU with Nitron Group (Nitron), a US headquartered global fertiliser
trading and distribution company, for product from both initial stages of production from the
Cummins Range Project.
Cummins Range has the potential to monetise the mine’s pre-strip as a direct application, direct
shipping rock phosphate fertiliser, before the production of a beneficiated rare earth and phosphate
dual mineral concentrate. Following the distribution of product samples, Nitron formally expressed
interest in pre-strip material which has the potential to provide a low-cost, low-risk start up platform
for the main critical mineral rare earth and phosphate project at Cummins Range.
Through the MOU, Nitron also confirmed interest in up to 250ktpa of phosphate mineral concentrate
which RareX phosphate concentrate could produce from low-grade rare earths blocks within the
Cummins Range orebody.
Nitron is the world’s second largest distributor of fertilisers, with a dominant market position in Latin
America, and growing positions in North America, Europe, Africa and – importantly for RareX – in SE
Asia and New Zealand. Nitron traded more than $3 billion in revenue in 2021 and provides a wide
range of logistical and financial services to its clients. Nitron trades over 8 million metrics tons per
year of NPK fertiliser products throughout the globe.
Supply Chain Infrastructure Agreements
RareX has signed a term sheet with KMG Logistics Pty Ltd (KMG) to utilise the existing bulk loading
facility (BLF) at Wyndham Port. KMG, the owner of the BLF, has agreed to negotiate a long-form bulk
10
loading facility agreement under which RareX would have access to at least 600ktpa of capacity at
the BLF for an initial 5-year term (subject to extension). The term sheet also grants RareX a binding
first right of refusal in the event of any proposed asset sale by KMG during this period. The BLF has
historically been used for loading transhipment barges which subsequently load an anchored
oceangoing vessel (OGV) approximately 500m from the BLF in deeper water in the centre of the
channel. Recent work by KMG has determined that Supramax OGVs (48,000 to 60,000 DWT) will be
able to load directly at the BLF. RareX is now using the operational learnings and practises of KMG to
define a complementary and efficient loading process which has no detrimental impact on KMG’s
operations.
RareX signed a call option deed with the owner of Lot 715, Barytes Road, Wyndham Port for 4 hectares
of land suitable for the storage and transfer of product from all stages of the Cummins Range Project.
The call option deed includes the agreed form of the contract of sale that the parties will enter into
should RareX elect to exercise its option to purchase the land. Under the call option deed, RareX has
the right to enter the property during the option period to conduct investigations pertaining to the civil
construction necessary for the design and installation of bulk handling and storage infrastructure.
RareX has partnered with Newhaul Pty Ltd for the purposes of providing product haulage and
logistical support for the Cummins Range Project. Newhaul is a logistics specialist with extensive
experience in providing haulage capability for resource projects. They bring exceptional indigenous
engagement, operational discipline, and data-driven haulage management experience to the project.
Additionally, they have a clear roadmap for the decarbonisation of their haulage fleet. The terms bind
Newhaul to immediately establish a special purpose vehicle (JV Co) to provide haulage services to
the Project and to provide an option for Cummins Range Company to enter into the JV by acquiring
50% of the shares in JV Co for $1 plus the value of the tangible assets of the JV Co minus the liabilities
(Option). The Option is exercisable subject to Cummins Range Company having entered into a
haulage agreement with JV Co and at least 500,000 tonnes of product from the Project having been
hauled by JV Co under the haulage agreement in any consecutive 12-month period. The Option
expires in 2030. The joint venture agreement outlines the corporate governance and operational
management details of the joint venture, once entered into by Cummins Range Company.
KHALEESI NIOBIUM PROJECT
In May 2024, RareX acquired the Khaleesi Niobium Project – a district-scale niobium-rare earth project
in the East Yilgarn, 290km east-northeast of Kalgoorlie in Western Australia. The acquisition supports
RareX’s goal of becoming a leading critical metals company with the future development of its 100%owned Cummins Range, carbonatite-hosted, Rare Earths and Phosphate Project and a strong focus
on continuing to discover major new carbonatite-hosted mineral deposits utilising internally-fostered
expertise.
The project acquisition comprised six tenements acquired unconditionally (one granted, five pending),
totalling 966km2, with RareX subsequently acquiring an additional 336km2 of potential alkaline
complexes to expand its landholding in this highly prospective region.
11
Figure 4: Khaleesi Project location map showing significant Eastern Yilgarn Paleoproterozoic Alkaline Magmatism. The
northernmost tenement at Khaleesi Project E39/2504, is RareX’s recent 336km2 land acquisition.
The Khaleesi Project sits on the Northern Foreland unit of the Albany Fraser Belt and is a portion of
the Yilgarn Craton that was intruded by Paleoproterozoic magmatic rocks and reworked during the
Mesoproterozoic Albany–Fraser Orogeny. The tenements also contain the eastern boundary of the
Canning Basin with the Mulga Rocks East uranium and rare earths deposits abutting the tenement
boundary. The eastern margin of the Yilgarn Craton hosts significant alkaline intrusions particularly
along strike in the Queen Victoria Spring nature reserve 5km to the south. The nature reserve hosts
the largest carbonatite pipe in Australia, the 10km diameter Cundeelee carbonatite.
Also within the nature reserve is the strongly rare earth mineralised Ponton Dyke with intersections
up to 28m at 10% TREO, including 6m at 20.57% TREO. Although un-mineable due to the nature
reserve, these deposits show the highly metaliferous nature and prospectivity of the alkaline
intrusions of this area.
The Tropicana Gold Mine (AngloGold Ashanti 70%, Regis Resources 30%) is located 100km to the
northeast and sits along the same structural trend. Historically, Anglo Gold Ashanti, Fortescue and
IGO have explored the Khaleesi Project with a narrow focus on gold-nickel-copper, and crucially
completed a number of multi-element 4- Acid digest assays, including for elements niobium, yttrium
and europium. These assays have confirmed large areas (many square kilometres) of elevated
niobium in saprock and fresh rock up to 30 times the background values of 20ppm and over multiple
12
locations. This suggests tremendous opportunities to discover significant niobium and rare earths
mineralisation across the holding.
Following completion of the acquisition, RareX commenced a review and interpretation of extensive,
detailed historical geophysical data from the Khaleesi Project, which delivered exciting target areas
including multiple gravity anomalies.
Compilation of AngloGold Ashanti and IGO magnetics and gravity data has been completed and
several areas have been identified for targeted exploration. The entirety of the Khaleesi Alkaline
Intrusion Complex (KAIC) has had aerial magnetics flown at 100m spacing, with the southern twothirds of the KAIC also having ground gravity at 400m x 400m spacing. These two detailed surveys
provide incredible detail over the KAIC before RareX has even put feet on the ground – and is the
result of several millions of dollars of Tier-1 exploration company groundwork.
The gravity data has provided additional support for the circular geometry of the complex, with the
bulk of the central area of the KAIC being a gravity low and the edges of the KAIC increasing in density.
These anomalies range in size from 1km to 4km and are positioned in a variety of geological settings
across the complex, including anomalies on the edges of sub-intrusions, on outer ring structures and
proximal to large faults and shear zones. Some of the gravity highs are coincident magnetic highs,
however a majority of the gravity highs are in magnetic low areas similar to WA1 Resources’ worldclass Luni niobium deposit in the West Arunta region.
Figure 5: Total magnetic image of Khaleesi Alkaline Intrusive Complex. Colouring is rainbow style, white and red areas are
gravity highs and purple areas are gravity lows. Aerial Magnetic survey over the entire project is at a 100m line spacing.
Initial exploration targets are shown in pink dashed circles.
13
Figure 6: Gravity image of Khaleesi Alkaline Intrusive Complex. Colouring is rainbow style. White and red areas are gravity
highs and purple areas are gravity lows. Areas shown in high definition are 400m x 400m ground gravity grid. The blurred
areas are 500m (EW) x 2000m (NS) or 2.5km x 2.5km grid. Initial exploration targets are shown in pink dashed circles.
RareX is compiling data from over 65,000m of historical gold-focused air core drilling on the tenement
package Most of these drilled metres were only assayed for gold-related elements. RareX has located
and acquired approximately 10,000m of the drill chips and pulps from the project area which are being
assessed and sent for re-assay for target elements. The remaining drill chips and pulps have been
located and acquisition is underway. On completion, the drill database, geological and geochemical
data will be added to the geophysical surveys and
Share your feedback
Discover